Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

C--652-19-104 Expand Steam Distribution System (VA-19-00017584)

Active
36C24619R0040Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The VHA Network Contracting Office 6 is conducting a market research survey to identify qualified vendors capable of providing professional Architect/Engineer and healthcare planning services for the expansion of the steam boiler system and steam distribution network at the Hunter Holmes McGuire VA Medical Center in Richmond, Virginia. The project involves upgrading the existing steam boiler infrastructure in Building 501 as well as expanding distribution to multiple existing outbuildings and future planned facilities, including a new Women’s Clinic. The estimated construction budget for the project is approximately $2.5 million, and the work falls under NAICS code 541330 with a size standard of $40 million. This notice is purely for information gathering and does not constitute a solicitation or request for proposals. The scope of services is comprehensive and divided into three main parts: initial investigative services including site assessments and feasibility studies; preparation and submission of contract drawings and detailed design documents across multiple engineering disciplines such as civil, structural, mechanical, plumbing, fire protection, electrical, telecommunications, and environmental assessments like asbestos abatement; and construction period services including review of submittals, monitoring during construction (particularly asbestos monitoring), responding promptly to site visit requests, and preparing final record drawings. Interested firms must respond in writing with detailed company information, evidence of current SAM registration, socio-economic status, and bonding capacity by the specified deadline. Preference will be given to certified Service-Disabled Veteran-Owned Small Businesses, but the government may consider other options if adequate responses are not received.

General Info

VHA seeks vendors for steam boiler engineering services at McGuire VA, $2.5M budget, SDVOSB preferred.

Agency

N/A

NAICS

541330 - Engineering Services

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSources Sought
Posted

Sources Sought

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
THIS IS A SOURCES SOUGHT NOTICE ONLY. This notice does NOT constitute a request for proposal, request for quote, or invitation for bid. No formal solicitation document exists at this time. We are seeking information for market research purposes only. The Government will not pay for any information solicited. The VHA Network Contracting Office 6 (NCO 6) is conducting a market survey to find qualified vendors to provide professional Architect/Engineer (AE) and healthcare planning services necessary to expand existing steam boiler system located in the Boiler Plant Building 501 and the steam distribution system to the existing out buildings (507, 508, 509, 511, 512, &514) and future planned buildings (Women s Clinic, Additional 40,000 sf & etc) on Hunter Holmes McGuire VA Medication Center, Richmond VA. Estimated Construction Budget is $2,500,000. The proposed NAICS 541330 is applicable to this acquisition; with a size standard of $40 Million. General Scope: Services shall include, but are not limited to: Part Ia Preparation of Existing Conditions and Conceptual Design Investigative Services: Preparation of Feasibility Study Report including existing conditions evaluation and conceptual design recommendation which includes site investigation for civil, surveying, structural, architectural, equipment/ furnishings, mechanical, plumbing, fire protection, electrical, electronics/ security, telecommunications, and environmental (asbestos abatement including but not limited to survey and sampling). Perform project site investigation in accordance with the Site Investigations section of this scope of work. Part I Preparation of Contract Drawings and Specifications Design Development: Preparation and submission of construction bid documents, interim design document packages for review and the final construction bid documents at the completion of the design development process in accordance with the Design Package Submission Schedule section. Design document packages shall contain a complete set of documents as specified in the Design Requirements/Submissions section of this scope of work. The AE shall develop a design necessary to meet the requirements in the Project Scope section of this scope of work. Design shall include the following engineering services: civil, surveying, geotechnical, structural, architectural, mechanical, plumbing, fire protection, electrical, telecommunications, and environmental. Part II - Construction Period Services: Review and provide concise direction on all submittals, shop drawings, product data, samples, RFI s, change order proposals, etc. in accordance with Construction Period Services section of this statement of work. Services shall include third party asbestos monitoring that will be performed during construction activated by a certified IH. Services shall include providing record drawings based on finalized contractor red-line as-builts. Part III - Site Visits: Visit the site at the request of the VA in accordance with section Site Visits in this scope of work. The AE shall respond on site within a two-hour period when requested. A total of thirty (30) site visits during construction shall be included. Each site visit shall be documented through a field report denoting the purpose and results of the site visit. All interested parties should respond, in writing via email to contact@example.gov No telephone inquiries will be accepted. In response, please include the following: Company/individual name Address Point of contact with email and/or phone number Information describing your interest Evidence of current SAM registration (see internet site: https://www.sam.gov for more information) DUNS number Proposed NAICS code (if different from above) Capabilities statement Bonding Capacity Company Socio-Economic SIZE (example large, small, SDVOSB, VOSB, WOSB etc.) If your firm is a Service-Disabled Veteran Owned or Veteran Owned Small Business, you must be CERTIFIED in the Vendor Information Portal (see internet site: http://vip.vetbiz.gov). The VA is mandated by Public Law 109-461 to consider a total set-aside for Service Disabled Veteran Owned Small Businesses. However, if responses from qualified firms prove inadequate, an alternate set-aside or full and open competition may be considered. Your response is required by 3:00 PM EST on Wednesday, January 2, 2019.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
Yucca Trail Widening Project – Palomar Avenue To La Contenta Road
Solicitation # 7074
The Town of Yucca Valley is soliciting professional civil engineering design services for the Yucca Trail Widening Project, located between Palomar/Avalon Avenue and La Contenta Road in Yucca Valley, California. The selected contractor will be responsible for creating a comprehensive Plans, Specifications, and Engineer's Estimates package, which includes street improvement, signing, striping, and streetlight plans, as well as final cost estimates and record drawings. The scope requires the consultant to evaluate the project for safety, constructability, utility conflicts, right-of-way constraints, and ADA compliance, utilizing the latest version of AutoCAD and adhering to the Standard Specifications for Public Works Construction and Town driveway standards. The agreement is for an initial term of two years, with a possible two-year extension upon mutual consent. Proposals must be submitted in two separate sealed envelopes by December 3, 2026, with the technical proposal limited to ten pages. Evaluation criteria include the service approach, company qualifications, past performance, proximity of the contractor's office, and the ability to commence work immediately. Compensation will be negotiated after the contractor is selected, and the Town aims to process undisputed monthly invoices within forty-five days. While the contractor must provide worker's compensation and indemnity insurance, it is noted that California prevailing wage laws do not apply to this specific agreement.
Town of Yucca Valley

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS