Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 2, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C--A-E Design Services for Medical Facilities

Awarded
W912GB10R0046Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Road Asset Management
Solicitation # FY27-ENGCP-002-6
The Bulloch County Board of Commissioners is soliciting Statements of Qualifications for project FY27-ENGCP-002-6, focused on Road Asset Management. The selected consultant will be responsible for collecting and analyzing field data, creating a road asset inventory, and developing a Capital Improvement Plan with an outlook extending to FY 35. The scope includes GIS database development, web-based mapping, and the identification of structural hazards and drainage failures to minimize safety risks and legal liability. All prime and sub-consultants must be GDOT Prequalified Contractors as of the submission deadline on November 20, 2026, at 3:00 PM EDT. Proposals are evaluated based on a composite scoring system that weights prime consultant experience and technical approach at 20% each, GIS capabilities at 20%, asset prioritization methodology at 15%, workload capacity at 15%, and past references at 10%. The highest-ranked consultant will be invited to negotiate a contract. Key requirements include a Principal-in-Charge with at least 10 years of industry experience and comprehensive insurance coverage, including professional malpractice and general liability of at least 1 million dollars per occurrence. Submissions are limited to ten pages, excluding mandatory forms and charts, and must include a Non-Collusion Affidavit and Bidder Declaration. Either party may terminate the resulting agreement with 30 days written notice.
Bulloch County Board of Commissioners

POSTED

about 12 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Europe District, is soliciting an Indefinite Delivery Contract for Architect-Engineer design services for medical facilities, primarily located in Germany. The contract has a maximum value of 50 million dollars with a base period of one year and four optional one-year extensions. Award is restricted to U.S. firms or joint ventures including a U.S. firm that are legally permitted to operate in Germany. A primary objective is the initial design for the replacement of the Landstuhl Regional Medical Center and the integration of the 86th Medical Group clinic, requiring a high degree of collaboration between U.S. and host nation standards. Required services encompass a wide range of medical facility design, including inpatient and outpatient clinics, laboratories, and supporting infrastructure, utilizing evidence-based design and Building Information Modeling. The selected firm must adhere to strict U.S. and German codes, including LEED Silver certification and various Unified Facilities Criteria. Selection is based on specialized experience with large-scale medical centers exceeding one billion dollars, personnel qualifications across multiple engineering and architectural disciplines, and a comprehensive design quality management plan. Submissions must be provided via SF 330 by August 9, 2010.

General Info

Contract Value

$319,854

NAICS

541330 - Engineering Services

Place of Performance

USACE District, Europe CMR 410 BOX 7, APO AE 09096 DE, AE, DEU

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Jul 19, 2010 to Aug 9, 2010.

Notice updated

The notice title changed. The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist Europe
ContactsNo contacts available
OfficeAPO, AE, 09096, USA
Office AddressAPO, AE, 09096, USA
ContactsNo contact information available

Full Description

Show more
Amendment 0002 Please note that in addition to the updated announcement provided below in this amendment, the subject title for this announcement is changed as follows: From: Hospital Replacement, Rhine Ordance Barracks, Germany To: A-E Design Services for Medical Facilities 1. GENERAL INFORMATION: The U.S. Army Corps of Engineers, Europe District, hereby solicits for A-E Services an Indefinite Delivery Contract (IDC), procured in accordance with Public Law (PL) 92-582 (the Brooks Act) and Federal Acquisition Regulation Part 36. In accordance with DFARS 236.609-70 and DFARS provision 252.236-7011, this contract will be awarded to U.S. firm or a joint venture including a U.S. firm. This contract will have a base period of one year and four optional periods of one year each for a maximum five year contract period. The amount of work performed under the contract shall not exceed $50,000,000. Work will be issued by negotiated firm-fixed-price task orders. 2. PROJECT LOCATION: The vast majority of work to be performed under this contract is expected to be located in Germany. There is a possibility that work may be required at other location in the US European Command (USEUCOM) area of operation and responsibility. 3. REQUIRED SERVICES: A-E services are required for the design of medical facilities in support of the US Military and the Department of Defense Medical Program. Medical facilities require a high degree of US and host nation design collaboration to ensure proper integration of US and host nation standards, systems, and operational capability within the facilities. A-E services will support design and construction of medical facilities that promote a healing environment during the clinical encounter, empower patients and families, relieve suffering, and promote long-term health. A-E services will employ evidence-based design principles that lead to improved clinical outcomes, patient and staff safety, and long-term operational efficiencies. Medical facilities will incorporate World Class Healthcare Tenets: comply with all standards to ensure Accreditation & Certification; utilize state-of-the-art technology; ensure flexibility and adaptability in the facility design; comply with National Patient Safety Goals and expectations set by The Joint Commission; and ensure environmental responsibility, energy efficiency and sustainability in the facility design and construction. Design services include the initial design for replacement of the Landstuhl Regional Medical Center and incorporation of the 86th Medical Group clinic/administrative functions into an integrated facility. The objective of the project will be to initiate and execute design approximately through S2 (IAW UFC 4-510-01) of a world class healthcare facility that meets or exceeds appropriate US and German codes/standards. Architect-Engineer (A-E) services are required for: engineering studies, charrette, schematic and concept designs. In support of this requirement, we are seeking a highly qualified A/E team/joint venture experienced with US healthcare design standards, US codes, DoD healthcare design criteria AND with German laws, codes, construction requirements and plans/specifications format. The A-E must be a US firm legally permitted to work in Germany or a legal joint-venture between a US firm and a firm legally permitted to work in Germany. The A-E team/joint venture must demonstrate their strategy to work in Germany in accordance with (IAW) German regulations. Final design of the project is expected to be contracted separately by the Federal Republic of Germany (FRG). It is anticipated that an office / design entity of the A-E joint venture selected will be given the contractual lead for the final design. It is desired to establish a seamless partnership with the Host Nation (& all partners) for the life cycle of the entire project; however, selection for this IDC does not guarantee selection by the FRG for the final design of the Medical Center. The regional Medical Center primary facilities include inpatient and wounded patient support, outpatient clinics and ancillary clinics, administrative and education functions, commercial food service, warehouse/logistics space, parking structure(s) and special foundations as required. The design will include evidence based design, enhanced commissioning plan development, building information systems, intrusion detection systems, energy monitoring and control systems, fire/smoke detection and alarm systems and connections to the installation central systems. Building and site antiterrorism measures will be provided along with a Mass Notification System. Supporting facilities include: roads, security features, electric service; water, sewer and gas; steam and chilled water distribution; paving; storm drainage; site improvements; and antiterrorism measures. Access for persons with disabilities will be included. Comprehensive building and furnishings related interior design services are required. Services may also include design of new medical clinics, clinic additions, alterations and related demolition, parking structures, supporting buildings, site surveys, energy conservation and analyses, and other investigations/studies; comprehensive interior designs; design services related to minor new construction, upgrade, maintenance, and repair of various medical facilities, including related infrastructure systems, medical equipment planning, and components. Services may include design of laboratories (research, animal, clinical, and Bio Safety Labs (BSL), dental clinics, support functions of medical facilities (medical gas systems, power, water, and steam), medical storage facilities, and medical transition spaces. Other technical requirements include construction cost estimating, scheduling, value engineering and materials testing. Work may include preparation of designs, specifications, cost estimates (parametric and quantity take off), interim life safety plans, enhanced commissioning plans, facility demolition plans that include hazardous waste identification and removal procedures, concept designs, final designs, construction phase services, and technical review of designs prepared by others. Services may also include supervision and inspection for construction of these facilities. The A-E should demonstrate a working knowledge and application of the Joint Commission (http://www.jointcommission.org/), Evidence Based Design principles, medical and local codes and regulations that govern medical facilities. The A-E should demonstrate a history of designing medical facility projects to pre-defined construction cost limitations. Sustainable principles will be integrated into the design, development and construction of the project in accordance with Executive Order 13123. LEED NC 3.0 (Medical Facilities), EPAct 2005, and other applicable laws and Executive Orders will be applied to the design. Minimum LEED Silver certification is required. Innovations in sustainable design will be encouraged. Project will be designed in accordance with: Unified Facilities Criteria (UFC) 4-510-01 (formally Military Handbook 1191), DoD Medical Military Facilities Design Criteria; Architectural Barriers Act (ABA) and Host Nation accessibility standards; UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings; UFC 4-010-02, DoD Minimum Standoff Distances for Buildings; and US European Command Antiterrorism Force Protection Criteria. The design will be prepared using the Metric system of measurement and will be formatted for construction solicitation by the FRG. Building Information Modeling (BIM) software will be utilized during the design phase and will also be developed for use by the general contractor and subcontractors during construction in order to ensure functionality of all spaces, constructability, operability, and maintainability. Firms may consider listing some of the basic BIM components of design (4/5D, communication tool, clash detection, mock ups, etc.) and how BIM capabilities would be leveraged to improve the process and product. The A-E should demonstrate experience in the preparation of design submittals for all phases IAW the requirements of the RBBau Section F and L; experience in preparation of construction contract specification IAW the requirements of VOB 2009 and VOB 2006. Experience with design of facilities in Germany IAW all technical requirements of the ETBs (Eingefhrte Technische Baubestimmungen) IAW with the MBO (Musterbauordnung) or LBauO RLP (Landesbauordnung Rheinland-Pfalz, experience in all Leistungsphasen (work phase) of the HOAI and must demonstrate Fachkunde, Leistungsfhigkeit und Zuverlssigkeit (Technical qualification, capability and reliability). 4. SELECTION CRITERIA: The selection criteria are listed below and are in descending order of relative importance. a. SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE: Experience of the firm and joint-venture partners, and/or consultants in the required services (Regional Medical Center with a Programmed Amount exceeding $1Billion) including design of new hospitals, medical clinics and support facilities; knowledge of Environment of Care Standards by the Joint Commission for Accreditation of Health Care Organization; knowledge of /experience in Evidence Based Design, and sustainability. Recent experience and experience as a team will receive greater consideration. Project descriptions should show explicit experience pertinent to this announcement. Firms must demonstrate the specialized experience and technical competence of the proposed team, including prime contractor, joint venture partners, consultants, subcontractors and/or free-lance associates and identify their roles in the project. b. PERSONNEL QUALIFICATIONS: The Government will consider the qualifications, education, relevant and specialized experience, and training of licensed, registered, and/or certified key personnel. The selected firm must have, either in-house or consultants in the following key disciplines: project manager (2), architecture(3), mechanical(2), electrical(2), fire protection(1), structural(2), civil(2), and communication engineering(1), cost estimating(2), certified industrial hygienist(1), medical equipment planner(1), interior design(2), transportation consultant (1), operation and maintenance systems commissioning expert (1), and LEED Accredited Professionals (AP)(1). Resumes contained in Standard Form (SF) 330, PART I, Section E, Page 2 shall be completed for each discipline, ideally for the number indicated in parentheses by each discipline, i.e. ( ). Individual resumes shall not exceed one page. Architects and Engineers should be registered in Germany (Architekten- or Ingenieurkammer) or have similar credentials. U.S. Registered professionals are required in the following disciplines: architecture, mechanical, electrical, fire protection, structural, certified industrial hygienist, and civil engineering. The Fire Protection Engineer (FPE) shall be a registered Professional Engineer (P.E.) who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveys (NCEES) or, a registered P.E. in a related engineering discipline with a minimum of five years experience dedicated to fire protection engineering that can be verified with documentation. The Electrical Engineer shall be a registered P.E. with a Bachelor or Master of Science degree in Electrical Engineering with a minimum of ten years of current design experience related to design of medical facilities. At least three of the ten years experience shall be in design of electrical systems (low voltage, normal, emergency power and lighting systems) within medical facilities similar to those required for this project. The Electrical Engineer shall not have any responsibilities for communications systems design. The Communications Systems Engineer (CSE) shall have a Bachelor or Master of Science degree in electronics or electrical engineering with a minimum of five years of communications design experience. At least three of the five years experience shall be in design of medical communications systems similar to those required for this project. The Commissioning Expert shall have a minimum of a Bachelor of Science degree in Mechanical or Electrical Engineering and a minimum of five years experience in commissioning HVAC and Power systems in large complex projects. A minimum of three years of this experience shall be in the commissioning of medical facilities of a scope and complexity similar to this project, with demonstrated significant field experience in the operation and troubleshooting of HVAC systems, Electrical Power Systems, Emergency Power Generation and Load Shedding Equipment; experience in the testing and balancing of air and water systems; design, operation, and configuration of Digital Control Systems for HVAC equipment and of Electrical Power Equipment Controls. The evaluation will consider education, training, registration, overall and relevant experience, and longevity with the firm. c. MANAGEMENT PLAN/DESIGN QUALITY MANAGEMENT PLAN: Submittals must include in Blocks D and H of the SF 330 a Management Plan that demonstrates a design quality management approach tailored to this procurement. The plan will address, as a minimum, the firms approach to project management, organization and lines of supervision and communication, and coordination of disciplines, quality control and, if applicable, coordination with subcontractors or consultants and joint venture partners. The submittal must indicate which firm is responsible for each item of work, the interdisciplinary and interoffice communication and supervision process, and the procedure to ensure high quality products and services within cost limitations and in strict compliance with performance schedules and prior experience of the prime firm and any significant consultants on similar projects. d. PAST PERFORMANCE (individually and as a group) on DOD and other contracts in support of projects similar to the required services (Regional Medical Center with a Programmed Amount exceeding $1Billion) with respect to cost control, quality of work, and compliance with performance schedules, as determined from PPIRS and other sources. PPIRS will be queried for all prime firms. Performance evaluations for any key subcontractors will also be considered. Any credible, information on past performance can be considered but a board is not required to seek other information on the past performance of a firm if none is available from PPIRS. e. KNOWLEDGE OF THE LOCALITY: Knowledge of conditions, including geologic features, climatic conditions, local construction methods, local/state building codes and permit requirements primarily within Germany. Experience with the coordination of all required public interests in Germany, for example German building laws, water rights, environmental laws, etc. Minor consideration may be given to knowledge of local conditions and requirements in other parts of EUCOM. f. CAPACITY TO ACCOMPLISH THE WORK: Capacity to complete the concept design (S2) of a Regional Medical Center with a Programmed Amount exceeding $1Billion within six months of Task Order award. The evaluation will consider the experience of the firm and any consultants in similar size projects, and the availability of an adequate number of personnel in key disciplines. 5. SUBMISSION REQUIREMENTS: Offerors must be registered in the Central Contractor Registration (CCR) to be eligible for award. Firms may register via the CCR internet site at http://www.ccr.gov. SF-330 submissions will be received until 1200 (12:00 pm) Central European Time on 9 August 2010. Interested firms having the capabilities to perform the work described above must submit two (2) hard copies and one adobe .pdf softcopy on CD or DVD of the SF 330 Part I for the proposed team and SF 330 Part II for the prime firm and all key subcontractors to the Contract Specialist as follows: US Army Corps of Engineer District Europe, CENAU-CT, ATTN: Contract Specialist Tr Santos at Konrad-Adenauer Ring #39, 65187 Wiesbaden Germany. Firms responding to this announcement after the closing date and time will not be considered. Required forms may be obtained on the Internet at: http://www.gsa.gov/Portal/fsa/ep/formslibrary.do?formType=SF Forms must be complete and current. Each firm identified as part of this contract including free-lance associates must complete a separate Part II of the SF 330. Firms may be rejected for incomplete or missing SF 330s. Blocks E and G of Part I must include only individuals proposed to perform the anticipated work, including all subcontractors or consultants, in the appropriate columns, and should not include persons that will not actually do the work. Block E must clearly show if individuals are full-time, consultants or free-lance. Do not include promotional brochures, advertisements, or other extraneous material in a submission. All submissions shall be submitted in English and must be identical in content. The SF 330 Part I shall not exceed 75 pages (8.5inch x 11inch or A4), including no more than 25 pages for Section H. Each side of a sheet of paper is considered one page. Use no smaller than 12 font type. Include the firm's DUNS number in the SF 330, Part I, Section H. In Section H, indicate the estimated percentage of involvement of each firm on the proposed team. Facsimile transmissions will not be accepted. Solicitation packages are not provided and no additional project information will be given to firms during the announcement period. This is not a request for proposal. Awards are anticipated to be made in the fall of 2010. Joint Ventures must submit a letter of intent to form a joint venture. If selected, the Joint Venture must be legally formed prior to award of the contract. Face-to-Face presentations are anticipated and will be held upon completion of the Selection Boards determination of Most Highly Qualified firms/joint ventures. Firms will be given 10 calendar days notice that a presentation will be held. Presentations will be limited to two representatives for each key firm/partner, not to exceed 10 persons total. Presentations will be limited to one hour. Firms may provide verbal presentations of their submitted technical qualifications as outlined in their proposal submission in response to this announcement, however no additional projects, personnel, or supplementary information shall be presented. Offerors are advised that members/employees of the German Federal Minister of Regional Planning, Building and Urban Development (BMVBS Bonn), the Oberfinanzdirection Koblenz Geschaftsbereich Bundesbau (GBB Mainz) and/or their local representative design and construction office (Baudienststelle or BDS) may serve as technical advisors to the selection board. These individuals will be authorized access to the SF 330 submittal and may observe the presentations from the most highly qualified firms. If the responding A-E firm wishes to restrict any portion of their submittal which they consider proprietary from the aforementioned, they must issue a letter to the Contracting Officer explaining the portions which should not be released. 6. SPECIAL NOTE: Firms sending submittals from outside Germany via air courier or postal service should state the content value to be no cost or zero. If a monetary value is indicated on the package, the package may be delayed due to customs clearance. The Europe District is not responsible for any delays that result in late receipt of submittals. Be aware that heightened security measures may delay access to the Europe District in the Amelia Earhart Center; therefore early delivery of submittals is advisable. Firms responding to this announcement are requested to inform one of the points-of-contact indicated below so that receipt of submittals by the closing date and time can be confirmed. A. For US/Military postal service: Commander U.S. Army Corps of Engineers, Europe District ATTN: CENAU-CT (Tre Santos) Announcement W912GB-10-R-0046 CMR 410, Box 7 APO AE 09049 B. For German postal service: U.S. Army corps of Engineers, Europe District ATTN: CENAU-CT (Box 7/Tre Santos) A-E Announcement W912GB-10-R-0046 Konrad-Adenauer-Ring 39 65187 Wiesbaden, Germany C. POINT OF CONTACT for additional information: Primary POC: Mr. Tre Santos, Contract Specialist Email: contact@example.gov Secondary POC: Ms. Elaine Gray-Frasure, Contracting Officer Email: contact@example.gov Place of Performance: Corps of Engineers, Europe District, Wiesbaden, Germany

More opportunities from Department Of Defense → W2SD Endist Europe

Same awarding agency

NAICS: 236220
Federal
PRE-SOLICITATION NOTICE_Water Supply System Bazum, Armenia
Solicitation # PANNAD26P0000028505
A pre-solicitation notice has been issued for the design and construction of a sustainable water supply and storage system in Bazum Village, Armenia, under the NAICS code 236220. The project is being managed by the Department of Defense through W2SD Endist Europe, with the primary point of contact being Kelsey Lahue at the U.S. Army Corps of Engineers office in APO, AE. This notice is intended to inform potential vendors of an upcoming formal solicitation and includes preliminary versions of the Statement of Work, which outline the intent to develop a comprehensive water collection, distribution, and storage infrastructure tailored to the needs of the Bazum community. All technical specifications, performance requirements, and submission guidelines referenced in the draft documents are subject to change and will be finalized in the official solicitation. The contract will follow a Design-Build delivery method, requiring vendors to integrate both design and construction services into a single coordinated effort. Although the notice does not specify place of performance details beyond the village location, the project aims to deliver long-term, sustainable water solutions in a remote area, emphasizing reliability, environmental consideration, and community resilience. Vendors with experience in international infrastructure projects, particularly in water systems and off-grid settings, are encouraged to review the preliminary materials to prepare for the formal procurement process. The solicitation number is PANNAD26P0000028505, and the notice was posted on June 8, 2026, with no set-aside or small business preferences indicated at this time.
Commercial and Institutional Building Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS