Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Environmental Protection Agency was posted on July 20, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C--A-E Services for US EPA Master Planning - IDIQ

Awarded
SOL-CI-17-00056Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
On-Call Structural and Seismic/Disaster Engineering Services
Solicitation # FAS 2026-037
The City of Seattle's Finance and Administrative Services (FAS) Capital Development division is seeking to establish on-call contracts with two qualified professional firms to provide structural and seismic/disaster engineering services. These consultants will provide technical expertise on an as-needed basis for small to medium projects across planning, design, procurement, and construction phases, utilizing delivery methods such as Design-Bid-Build, Job Order Contracting, and the Small Works Roster. The scope of work includes performing structural engineering studies, seismic evaluations, confidence testing, and fall protection design, as well as preparing stamped construction documents, managing permitting, and providing construction administration and inspection for new and existing City facilities. The contract features an initial one-year term with options for four annual renewals, not to exceed a total duration of five years. To be eligible, firms must be licensed to practice in Washington State and the City of Seattle and demonstrate a track record of at least three relevant projects within the last seven years. Selection is based on a weighted evaluation of relevant technical experience (40%), approach and methodology (30%), an inclusion plan for women and minority firms (15%), and past performance (15%). All deliverables must adhere to specific FAS CAD standards and CSI MasterFormat specifications. Payment is processed within 30 calendar days of invoice receipt, with costs based on personnel salary rates and reimbursed direct non-salary expenses.
Finance and Administrative Services

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 13 hours ago

DEADLINE

in 20 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 15 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The U.S. Environmental Protection Agency requires a single Architect-Engineer contractor to provide nationwide master planning services for its environmental and analytical laboratory and support facilities. This five-year indefinite-delivery, indefinite-quantity contract involves a broad scope of work, including facility condition assessments, laboratory programming, energy and water usage evaluations, and the development of comprehensive master plan reports. The contractor must maintain offices across the country to support various sites and integrate their findings into the Agency-wide planning process to assist with funding requests and strategic facility management. Financial terms specify a minimum order amount of 25,000 dollars and a maximum total contract value of 10,000,000 dollars, with typical task orders ranging between 25,000 and 250,000 dollars. Pricing is based on negotiated loaded hourly rates for major disciplines. Selection is based on the Brooks Act, evaluating firms on technical competence in laboratory planning, professional qualifications of licensed staff, the capacity to handle multiple overlapping projects, and a proven record of past performance.

General Info

Contract Value

$100,000

NAICS

541330 - Engineering Services

Place of Performance

OH, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Sources Sought

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyEnvironmental Protection Agency → Cincinnati Acquisition Division (cad)
ContactsNo contacts available
OfficeCINCINNATI, OH, 45268, USA
Office AddressCINCINNATI, OH, 45268, USA
ContactsNo contact information available

Full Description

Show more
Synopsis Architect-Engineer (A-E) Services for Indefinite-Quantity Type Contract for the U.S. Environmental Protection Agency's Nationwide Facilities Master Planning Activities The U.S. Environmental Protection Agency (EPA) requires a broad range of Architect-Engineer (A-E) services related to master planning for its environmental and analytical laboratory and laboratory support facilities nationwide. A single contract award is anticipated, with a target effective date of October 1, 2017. The contract shall be an indefinite-delivery, indefinite-quantity (IDIQ) type contract, under which task orders shall be issued for individual projects over a five-year performance of period. It is expected the contract will specify a minimum order amount of $25,000 and a maximum order amount of $10,000,000 over the life of the contract. Task orders are expected to typically range between $25,000 and $250,000, although some will likely be higher or lower. Loaded hourly rates (inclusive of overhead and profit) for each major discipline will be negotiated for each contract year. These loaded rates will serve as the basis for pricing task orders. The required A-E services are being procured in accordance with the Brooks Architect-Engineer Selection Act (P.L. 92-582) as implemented by FAR 36.6 and EPAAR 1536.6. Services which may be required under any resulting contract include a broad range of A-E services related to master planning with analyses of all aspects of specific facilities operated by the EPA, i.e. architecture, engineering, landscape architecture, functionality, sustainability, energy and water usage, operating costs, and capital costs. A principal focus of this contract will be conducting laboratory programming, energy usage evaluations, and facility condition assessments. These activities will help the EPA Real Property Support Services (RPSS) effectively plan for the needs of the Agency's facilities; effectively formulate requests for the Agency's buildings and facilities (B&F) appropriation; and address the changing needs of the users of the facilities. The facilities master planning process shall be integrated into the Agency-wide planning process. The Contractor will be required to become knowledgeable about EPA's facilities through existing documentation and, where necessary, through site visits and interviews with EPA staff. Also, the Contractor shall have offices located throughout the country since support is required at the EPA facilities nationwide. Specific services required under this contract will be identified in individual task orders issued by the Contracting Officer and will fall into the following areas: - Site and facility master planning services for EPA-occupied facilities. - Reviewing and updating existing Master Plan reports, as required. - Preparing new Master Plan reports including analysis of all aspects of specific EPA facilities, i.e., architecture, engineering, energy usage, water usage, functionality, sustainability, operating costs, and capital costs. Development of the Master Plan reports will require interviews with on-site EPA staff, as well as with program management and Headquarters facility staff, to ensure that each Master Plan effectively addresses the Agency's and Program's strategic plans and the FMSD's funding strategies. - Surveying existing facilities documentation, including plans, blueprints, reports, and data, as well as existing computer-aided design (CAD) files and other computer files. - Developing new data and documentation as required for incorporation into EPA's facilities database. - Estimating costs for required facility improvements, identifying deferred maintenance costs, developing a strategic plan for correcting deferred maintenance items, and performing economic analysis to evaluate facility improvement options. - Reviewing existing assessments of individual facility systems and capabilities and, where required, developing new assessments through site visits and interviews or through existing records. - Developing space planning scenarios as required in response to changing programmatic requirements. Such space planning may involve evaluating existing facilities and developing cost estimates that are compatible with EPA's facilities database and with the General Service Administration Federal Real Property Council's data elements. - Programming of existing and proposed laboratory space. - Preparing architectural-engineering reports and other supporting documentation for individual facilities, nationwide planning studies, as well as other facilities-related information required by the Agency. - Reviewing and updating current Agency facilities standards. - Architectural and engineering evaluations of existing facilities in accordance with current EPA facilities standards, guidelines, and other benchmark architectural and engineering standards. - Evaluating sustainability opportunities using buildings and site analyses and Leadership in Energy and Environmental Design (LEED) criteria. - Evaluating energy and water usage, on a site-specific basis, to develop opportunities for usage reductions based on cost-benefit analyses. - Coordinating with EPA Programs and Regions to incorporate their missions and strategic goals into specific facility master plans. - Developing plans that incorporate applicable Federal security standards appropriate for the mission and the specific facility security level. EVALUATION FACTORS -- The A-E must demonstrate its qualifications and the qualifications of key each team member, with respect to the following criteria, which are listed in descending order of importance: (A) DEMONSTRATED EXPERIENCE and TECHNICAL COMPETENCE in performing programming, master planning, design (including sustainable building and site design), condition assessments, and strategic planning for analytical and research laboratories and laboratory support facilities. (B) PROFESSIONAL QUALIFICATIONS in the following disciplines: (1) Licensed Architects with LEED Professional Credentials; (2) Licensed Mechanical Engineers with LEED Professional Credentials; Licensed Electrical Engineers; (4) Licensed Structural Engineers; (5) Licensed Civil Engineers; (6) Licensed Landscape Architects; (7) Energy Analysts; (8) Sustainability Professionals; and (9) Laboratory Planners. The evaluation will consider demonstrated, documented, and relevant education, training, registration, voluntary certifications, overall and relevant experience (highlighting recent achievements within the last five years), and key management and technical personnel longevity with the firm. Additional certifications (e.g., LEED, NCQLP, CEM, ASHRAE) shall be evaluated favorably. The submittal shall demonstrate the A-E and its team members have all the necessary licenses and certifications as required to provide professional A-E services. (C) CAPACITY of the firm to complete multiple task orders with similar completion schedules and overlapping delivery dates. The submittal should indicate the Architect/Engineering (A-E) firm's present workload, and demonstrate the capacity to perform approximately $2,000,000 in EPA A-E work in a one-year period. Identify all current projects being designed in the A-E firm's office, showing dollar value, start date, completion percentage, and the anticipated completion date. (D) RECORD of PAST PERFORMANCE on contracts of similar size and nature with respect to quality of work, cost control, and compliance with performance schedules, as indicated by feedback from client references, awards, commendation letters, or other performance recognition documentation. Provide documentation of the firm's performance for each project provided as experience under Criterion (A) and Criterion (B) above. On the SF330 state if no documentation exists. For each project provide, name, title, address, telephone number, and e-mail address of owner's representative. Firms desiring consideration shall submit via express mail or courier, four (4) hard copies and one (1) electronic copy (CD) of Standard Form (SF) 330, Architect-Engineer Qualifications, Parts I and II to the following address: U.S. EPA Headquarters, Attn: Dan Amon, William Jefferson Clinton Building, 1200 Pennsylvania Ave., N.W, Room Number 5353, Washington, DC 20004. Note that a separate Part II of the SF 330 is to be submitted for each firm that will be part of the team identified in Part I. All information must be received at the above address no later than 4:30PM EDT on June 16, 2017. The Part II submission is limited to one page for the prime contractor and one page for each subcontractor. For purposes of entering small business status on Part II of the SF 330, the applicable North American Industry Classification System (NAICS) Code is 541330, "Engineering Services", and the relevant small business size standard is average annual receipts for the last three (3) fiscal years not exceeding $15 million. This effort is not a small business set-aside. All qualified firms may submit the information identified above. This is not a request for proposal. To be eligible for contract award, a firm must be registered in the System for Awards Management (SAM) Database prior to and potential contract award (FAR 4.1102). Register via the SAM Internet site at http://www.sam.gov.

More opportunities from Environmental Protection Agency → Cincinnati Acquisition Division (cad)

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS