Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on December 3, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C--MEVE-ENGINEER ANALYS:SPRUCE TREE ALCOVE

Awarded
P16PS00932Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Road Asset Management
Solicitation # FY27-ENGCP-002-6
The Bulloch County Board of Commissioners is soliciting Statements of Qualifications for project FY27-ENGCP-002-6, focused on Road Asset Management. The selected consultant will be responsible for collecting and analyzing field data, creating a road asset inventory, and developing a Capital Improvement Plan with an outlook extending to FY 35. The scope includes GIS database development, web-based mapping, and the identification of structural hazards and drainage failures to minimize safety risks and legal liability. All prime and sub-consultants must be GDOT Prequalified Contractors as of the submission deadline on November 20, 2026, at 3:00 PM EDT. Proposals are evaluated based on a composite scoring system that weights prime consultant experience and technical approach at 20% each, GIS capabilities at 20%, asset prioritization methodology at 15%, workload capacity at 15%, and past references at 10%. The highest-ranked consultant will be invited to negotiate a contract. Key requirements include a Principal-in-Charge with at least 10 years of industry experience and comprehensive insurance coverage, including professional malpractice and general liability of at least 1 million dollars per occurrence. Submissions are limited to ten pages, excluding mandatory forms and charts, and must include a Non-Collusion Affidavit and Bidder Declaration. Either party may terminate the resulting agreement with 30 days written notice.
Bulloch County Board of Commissioners

POSTED

about 11 hours ago

DEADLINE

in 22 days
NAICS: 541330
New
International
CoT RFP Event Q30-01-2026-27
Solicitation # Q30-01-2026-27
The City of Tshwane is soliciting a service provider for professional engineering services to support town planning subdivision application processes on city-owned properties. The scope of work is divided into three primary categories: Civil Services Reports, Geotechnical Investigations, and Route Determination Reports. All services must be led by a Professional Engineer registered with the Engineering Council of South Africa and must comply with the Gauteng Transport Infrastructure Act, National Building Regulations SANS 10400, and various SANS and SANRAL standards. The project follows a strict timeline, requiring an inception meeting within one month, draft reports within three months, final reports within five months, and project close-out within six months of appointment. The solicitation, numbered Q30-01-2026-27, closes on November 12, 2026, at 10:00. Awards are based on an 80/20 preferential point system in accordance with the Preferential Procurement Policy Framework Act and 2022 Regulations, with specific goals including points for women-owned, youth-owned, and disability-owned enterprises, as well as local economic participation. Evaluation occurs in four stages, starting with administrative responsiveness and a functionality score of at least 70 out of 100. Successful bidders must enter into a Service Level Agreement, with payment terms set at 30 days following the receipt of an invoice. Required submission documents include company registration, tax clearance or a CSD unique pin, and B-BBEE certification.
City of Tshwane

POSTED

about 13 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The Department of the Interior's National Park Service is seeking professional engineering services for the Spruce Tree House Alcove Arch at Mesa Verde National Park in Colorado. This small business set-aside project requires a firm to conduct detailed numeric engineering analyses, including 3D geoanalysis and chronological modeling, to assess the stability of the sandstone arch and determine necessary stabilization interventions. The scope involves geotechnical, geostructural, and geomechanical analysis using specific software such as Rhinoceros, Kubrix, and Flac3D. The contract is structured with a base phase for investigative services and pre-design lasting 365 days, followed by optional phases for full design, construction documents, and construction management for up to an additional 2.5 years. Selection is based on demonstrated competence and qualifications rather than price, with the most highly qualified firm being selected to negotiate a firm-fixed-price contract. Interested firms must submit a Letter of Interest and SF 330 qualifications by May 12, 2016, at 3:00 p.m. MST.

General Info

Contract Value

$389,435.6

NAICS

541330 - Engineering Services

Place of Performance

CO

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from May 11, 2016 to May 12, 2016. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
ContactsNo contacts available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA
ContactsNo contact information available

Full Description

Show more
IGF::OT::IGF MEVE-ENGINEER ANALYSIS:SPRUCE TREE ALCOVE AMENDMENT TO CHANGE THE DUE DATE: FROM: 3:00 p.m. MST, 11 May 2016, Wednesday. TO: 3:00 p.m. MST, 12 May 2016, Thursday. Title: Go to FEDCONNECT.net for related attachments, Mesa Verde (MEVE), Colorado, Spruce Tree House (STH) Alcove Arch Analysis and Pre-design, Options for Design/Construction Documents and Construction Management Notice of Intent: This contract is SET ASIDE for SMALL BUSINESS. The primary NAICS code is 541330, Engineering Services, with small business size standard of $15.0M. This notice is posted in its entirety and hereby serves as the official solicitation for this project. This announcement constitutes the only posted solicitation. Your firm's SF 330, Architect-Engineer (A-E) Qualifications, are being requested, in addition to the other information specified by this notice. The requirement is being procured in accordance with Federal Acquisition Regulation (FAR) 36.6, Architect-Engineer Services and 40 U.S.C 1101, which requires the selection of A-E Services on the basis of demonstrated competence and qualification for the type of professional services required. Accordingly, a request for proposal (RFP) (pricing and other cost information) will only be requested and considered after the selection of the most highly qualified (MHQ) firms using the selection criteria described in this synopsis. The MHQ, once selected, will be given a minimum of 3 weeks to review the RFP and to provide pricing. Information related to price will be requested SEPARATELY after selection of the MHQ. The request for pricing (the request for proposal (RFQ)) will not be posted. Selection and information pertaining to the selection in response to this notice may be released by the Contracting Officer in accordance with FAR 36.607, Release of information on firm selection. DESCRIPTION: The Department of Interior (DOI), National Park Service (NPS), Intermountain Region Office (IMRO) in Denver, Colorado, anticipates the acquisition of professional-engineering services for Mesa Verde National Park, Montezuma County. The work requires a robust and detailed numeric engineering analyses to assess stability and probable stabilization intervention of the Spruce Tree House Alcove sandstone arch. (See the attached STH photos, 12 pages) This work will principally engage experts in the field of geotechnical, geostructural, and geomechanical analysis and related design disciplines (as applicable). All work will be guided by the Scope of Work and the brief description as described below. Firms must be able to provide a 3D geoanalysis of the Spruce Tree House (STH) Alcove Arch and any stabilization design work. LiDAR scan data of the site has been completed and will be provided as Government Furnished Materials. The deliverable for the materials investigation, and analyses and design phases services include, but are not limited to: 1) procure services and manage on-site geotechnical investigation and associated laboratory testing, and 2) Conduct detailed three-dimensional computer based analyses of original condition (pre-1900), 1962 strengthening, and probable 2016 strengthening, (a chronological modeling sequence). Deliverables required for the base award (first phase) are: (1) Report with objectives outcomes discussed; (2) Analyses of groundwater and estimated flow location and probable rate; and (3) Critical sections stress analysis. Objectives: 1. Develop a global understanding of the STH alcove and arch for overall stability. Limits of analyses: Sta. 0+00 to 2+67, with appropriate lateral and lead edge end conditions (+/- 250 ft.), including downslope to creek. a. Surface topography to be provided (LiDAR Scan). b. Model ground water movement. c. Estimate original condition pre-1900. d. Model the staged construction of 1960 work: Filling of crack and rock anchors. e. Estimate global Factor of Safety for both features for both pre and post 1960 work. 2. Develop necessary additional engineering analysis and design for stabilization of either alcove and/or arch. The engineering analyses will be conducted with the following three computer programs (or equivalent which is based on compatibility with the following programs): 1) Rhinoceros (surface modeling program, 2) Kubrix (3D mesh generation program), and 3) Flac3D (finite difference program). All modeling parameters, and input and selected output files shall be transmitted to NPS. The contractor is required to provide all personnel, equipment, software, materials, transportation, labor, expertise etc. related to this project in order to properly perform the requirements of the described project in accordance with the description, industry standard and all related state and Federal laws, unless the related Scope of Services otherwise note (specially) as Government Furnished. Subsequent optional phases and tasks may include: Full design, construction documents and related construction management services, which may include (but not limited to): Develop plans, specifications, and cost estimates to execute probable strengthening, develop bid package, provide consultation support during the award of contract, and provide on-site consultation during probable strengthening. ANTICIPATED PERIOD OF PERFORMANCE: BASE (Phase 1), Investigative Services, Analysis, Pre-design: 365 calendar days for the date of Award OPTION - OPTIONAL TASKS (Phases 2 and 3): Period of Performance is to be determined, but not to be in excess of an additional 2.5 years (excluding any option to extend service by 6 months) CONTRACT INFORMATION: This contract is being procured in accordance with FAR 36.6. A firm will be selected for pricing and negotiations based on demonstrated competence and qualifications for the required work. The selection criterion is identified below. The NPS plans to request pricing, negotiate and award a single firm-fixed priced contract, with optional work to complete the full design and construction management (as needed). Agreed to contract labor rates will be used to negotiate any future modification (if needed). The selected contractor will be required to provide any assumption made in assessing the project and level of effort required to perform the work required and to develop a firm-fixed price. The award will be made to the firm that is determined to be the most highly qualified based on the information provided and the evaluation criteria noted in this Notice of Intent, unless there is a failure to reach a fair and reasonable price. Failure to reach a fair and reasonable price will result in NPS terminating the negotiations and either going with the next most highly qualified firm or cancelling the project. SINGLE AWARD: The contract will have one base line item and optional tasks (design and construction management). The contract is SET ASIDE for SMALL BUSINESS. The primary NAICS code is 541330, Engineering Services, with small business size standard of $15.0M. The work has been determined to be for professional services which are exempt from the Service Contract Labor Standards (formerly the Service Contract Act). However, the wages and benefits of service employees (see FAR 22.10) performing under this contract must be at least equal to those determined by the Department of Labor under the Service Contract Act, as determined relative to the employee's office location (not the location of the work). Also reference the following link: http://www.dol.gov/whd/flsa/eo13658/index.htm Executive Order 13658, Establishing a Minimum Wage for Contractors. To be eligible for contract award a firm must be determined responsible (FAR Part 9), be able to substantiate and perform at least 50% of the work, and be registered (active) in the System for Award Management (SAM) and able to invoice electronically via Invoice Processing Platform (IPP). Register at the website https://www.sam.gov/ and https://www.ipp.gov/ (respectively) prior to award. SELECTION CRITERIA: The following criterion is descending order of importance and will be used in the evaluation of the prospective firms. Firms must not submit excessive and unrelated information. As determined by the Contracting Officer, a firm¿s submitting a high (excessive) level of unrelated information may be rendered unresponsive and therefore will not be considered for possible selection as a most highly qualified firm. To be responsive, a firm's response to this notice must contain the information required, be timely, responsible and convey an expert¿s understanding of the requirement. Information required and submitted on the SF 330 shall be inclusive of the following information-- A. Prior Experience: Submit project information that is considered recent, similar and relevant to this project. This project is briefly described above under the DESCRIPTION paragraph and experience with 3-dimensional finite difference modeling and analyses of sandstone alcoves and/or slopes with rock bolting stabilization methods. The evaluation will consider similar, relevant and recent experience. Similar and relevant is considered prior experience that involves much of the same type of effort and complexities this project requires as defined by the DESCRIPTION, the site's geomaterials, topographical features, and conditions. Not similar or relevant is considered any experience that does not involve any of have the same type of effort and complexities that this project requires, as defined by the he DESCRIPTION, the site's geomaterials, topographical features, and conditions. Recent is considered within 6 years from the month and year this notice was issued. Those firms with more recent and relevant experience will be rated higher. B. Professional Qualifications: Submit the professional qualifications of the firm's proposed key personnel. The key personnel are those members that will be assigned to this project and are necessary for the proper execution of the tasks required to properly fulfill this requirement. In accordance with the SF 330 they are ¿[i]ndividuals who will have major contract responsibilities and/or provide unusual or unique expertise. The evaluation will consider key personnel of the primary firm and subcontractors to be used in the performance of the contract in terms of-- 1) Professional registration - professional civil and geotechnical engineer(s) in the State of Colorado 2) Availability of an adequate number of personnel in the key disciplines (described above) to ensure that the firm can meet the timeline of the requirement; and 3) Education, training, relevant experience. Firms showing the most qualified and qualification for work of this type described above will be rated higher. C. Past Performance: Past Performance will be evaluated in accordance with the following and Federal Acquisition Regulation (FAR) 42.1502(f), Contractor Performance Information, Policy, on projects considered relevant to the work to be performed under this contract with respect to management, cost control, quality of work, and compliance with performance schedules, as determined from the Government's Past Performance Information Retrieval System (PPIRS) (to the maximum extent possible) and other sources deemed necessary by the Contracting Officer to properly assess your firm. See paragraphs A above for the definition of relevant. This evaluation will consider the success of the identified relevant experience and proposed personnel. Include valid references information for 3-5 projects performed recently (within 6 years from the date this notice was issued), of comparable scope (reference the DESCRIPTION above) and of comparable magnitude (anticipated price base, options (design and construction management). This information must be inclusive of the information listed in Section F of the SF 330 and must include firm's role (i.e. prime contractor, subcontractor, consultant etc.), project owner's agency/company, a valid email address, project key number (i.e. project number, contract number, task order number etc.), and the date the work was completed (or the percent complete if it is in work). Firms that demonstrate more than satisfactory past performance on relevant projects will be rated higher. D. Capacity: State the firm¿s commitment and provide a tentative schedule with correlating major and critical tasks to be performed and their dates. The firm's capacity is considered time, personnel and commitment to perform quality work on time and within budget. On time is defined as the project's period of performance. Based on the unknown stability of the structure(s) time is critical and important. To be responsive the schedule shall meet or exceed the period of performance indicated in this notice with the assumption that an award will be made around August 2016. Firms that demonstrate meeting and exceeding this capacity and a sound technical approach to the work will be rated higher. E. Knowledge of Geographical Area: The firm must demonstrate knowledge of the locality of the project or within the general region of the Four Corners area of the American Southwest. Firms that demonstrate greater knowledge of the areas described above will be rated higher. F. Key Assets: Inventory of programs, systems, equipment and the ability to obtain necessary resources to perform the work described above. Provide a list of assets and how the vendor will demonstrate the availability of these resources. Firms that demonstrate the appropriate resources to meet the requirements will be rated higher. G. Quality Control Plan and Safety Plan: Provide the firm¿s overall/general Quality Control and Safety Plan which would ensure the safe performance, technical accuracy, completeness, and correctness of the work, and all relevant aspects and details, including coordination of all subcontractors with each other. Firms that demonstrate plans that clearly meet the requirements of the projects will be rated higher. Firms that can properly fulfill the requirements described in this announcement are invited to submit: (1) a Letter of Interest, which must include a prime and alternate Point of Contact (full name, phone and email address) authorized to negotiate on behalf of the firm, validation of the submittal for no less than 180 calendar days, and (2) an electronic copy of a completed Standard Form 330 - PART I and PART II (Sections A-G; I, and Section H, if utilized). o Part I - Contract-Specific Qualifications ¿ Section A. Contract Information. ¿ Section B. Architect-Engineer Point of Contact ¿ Section C. Proposed Team. ¿ Section D. Organizational Chart of Proposed Team. ¿ Section E. Resumes of Key Personnel Proposed for This Contract. ¿ Section F. Example Projects Which Best Illustrate Proposed Team's Qualifications for This Contract. ¿ Section G. Key Personnel Participation in Example Projects. ¿ Section H. Additional Information. ¿ Section I. Authorized Representative o Part II - General Qualifications In addition, because selection of firms is based upon qualifications, the extent of any subcontracting is an important negotiation topic. In conjunction with submitting a response, it is important to understand FAR Clauses 52.219-14 and 52.244-4 and the limits of the firm¿s subcontracting to firms agreed upon during negotiations. Prime must be able to perform at least 50% with their own employees. PROPOSAL PERIOD: The submitted Standard Form (SF) 330 must remain valid for the duration of the procurement process, but no less than 180 calendar days from the date of this notice. Contract award is anticipated on or before 30 August 2016. PAGE LIMITATION/PITCH FONT SIZE: A. Letter of Interest shall not exceed 2 pages of 8" x11" size paper (1 page of 8" x 11" sized paper when printed double sided). B. Section H of the SF 330 should not exceed 3 pages of 8" x11" size paper (5 pages of 8" x 11" sized paper when printed double sided). C. Section D, organizational chart may be on larger paper, but must be folded to fit an 8"x11" sized binder and each side would count as 1 sheet of paper if a page limitation is specified. D. All others sections are only limited by relevant information needed to sufficiently convey to the Government the firm capabilities and qualification in accordance with the stated selection criteria. Excessive and unrelated information may render a response unresponsive and therefore it will not be considered for possible selection as a most highly qualified firm. SUBMIT the electronic copy via email to contact@example.gov. All information must be received before 3:00 p.m. MST, 12 May 2016, Thursday. Contracting Officer's Address: National Park Service/IMRO Attn: Jacqueline Carter P.O. Box 25287 Denver, Colorado 80225-0287 SF 330 may be obtained at: http://www.gsa.gov/portal/forms/download/116486. Point of Contact: Jacqueline Carter - +1 (555) 000-0000 or contact@example.gov. Hand delivered transmissions will not be accepted and will be considered non-responsive or not accepted. QUESTIONS: Submit questions by email as an editable MS Word attachment to the Contracting Officer with 7 calendars after the issuance of this notice, by at 1:00 pm (13:00) Mountain Time with the subject line: Questions for P16PS00932/MEVE, STH. Only written Request for Information (RFIs) will be considered and responded to by the Contracting Officer. Pertinent information and clarifications will be posted to this site as an amendment. Firms are notified to file protest (if needed) to the Contracting Officer in accordance with 52.233-2, Service of Protest (SEP 2006)(JUL 1996). Submit to address as specified below and a copy of the protest must be served on the Contracting Officer. It shall be simultaneously furnished by the protester to the Department of the Interior Assistant Solicitor, Acquisitions and Intellectual Property, 1849 C Street, NW, Room 6511, Washington, DC 20240. Attachments (Check fedconnect.net)

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237110
New
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming. The project scope involves extensive structural, utility, and preservation work on one lodge, eight cabins, one garage, two outbuildings, and a water well structure to convert them into employee housing. Key technical requirements include the installation of a new sanitary sewer collection system, lift station, and water distribution for domestic and fire service, as well as the expansion of the parking lot to include ADA spaces. The project is estimated to have a construction magnitude exceeding 10 million dollars, with a base performance period of 303 calendar days, potentially extending to 669 days depending on the selected CLINs. The government will award the contract using the Best Value Continuum Tradeoff Process, evaluating proposals based on technical approach, project experience, schedule, and past performance, with non-price factors being equally important to price. Contractors must adhere to strict environmental and safety regulations, including potential seasonal closures from February 1 to August 15 for bald eagle nesting and protections for roosting bats. Additionally, the project requires the management of hazardous materials, as surveys have identified potential asbestos and lead-based paint across the facilities. Proposals must be submitted electronically to the Contracting Officer, Tony Jasper, by the specified deadline, and the successful bidder will be required to provide bid, performance, and payment bonds.
Water and Sewer Line and Related Structures Construction

POSTED

about 20 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, identified as TIMU-335507, aims to repair and extend a seawall damaged by Hurricane Ian to protect critical cultural and ecological resources. The scope of work is divided into three primary CLINs: the installation of a new weatherable rigid vinyl sheet pile wall with tie rods in front of the existing wall, the extension of the wall eastward using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, sea grass restoration, and the installation of limestone riprap. The estimated construction magnitude is between 1 million and 5 million dollars, with a mandatory performance period of 259 calendar days. Award will be determined using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to safeguard aquatic species, wetlands, and endangered wildlife, including manatees and sea turtles, in compliance with the Marine Mammal Protection Act and the Endangered Species Act. Additional requirements include adherence to the Davis-Bacon Act for prevailing wages, ADA compliance for public dock walkways, and the use of biodegradable or recyclable packaging. Proposals must be submitted electronically in two volumes by November 13, 2026, and include a bid bond and detailed past performance data.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 15 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Sewage Treatment Facilities

POSTED

2 days ago

DEADLINE

in 20 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

14 days ago

DEADLINE

in 4 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

17 days ago

DEADLINE

in 8 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

17 days ago

DEADLINE

in about 13 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS