Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on December 13, 2004. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C -- Indefinite Quantity for System Safety Engineering and Management Services for Projects throughout the Naval Facilities Engineering Command, Atlantic's Area of Responsibility

Closed
N62470-05-R-1000Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 14 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

Continental United States, Caribbean, outside Contental United States, VA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Atlantic
Contacts2 people available
OfficeNORFOLK, VA, 23508-1278, USA
Office AddressNORFOLK, VA, 23508-1278, USA
Contacts
Robin M LambProgram Assistant
Mark D GostelContract Specialist

Full Description

Show more
ALL INFORMATION NEEDED FOR INTERESTED PARTIES TO SUBMIT A STANDARD FORM (SF) 330, ARCHITECT ENGINEER QUALIFICATIONS IS CONTAINED HEREIN. THERE IS NO SEPARATE RFP PACKAGE TO DOWNLOAD. Engineering and Design Services are required for an Indefinite Quantity Contract for System Safety Engineering and Management Services for Projects throughout the Naval Facilities Engineering Command, Atlantic's (NAVFAC LANT) Area of Responsibility (AOR). The NAVFAC LANT AOR includes the entire continental United States (CONUS), Caribbean, and outside continental United States (OCONUS), including Europe, North Africa, and Southwest Asia. The System Safety Engineering and Management program includes various areas of safety and health such as ergonomics, occupational health, confined space entry, electrical safety, fall protection, mishap investigation and reporting, inspections, self assessment and improvement, accident prevention and hazard abatement for shore based environments. System Safety Engineering and Management services may include, but are not limited to: preparation of drawings, specifications, cost estimates, translations, studies, research, surveys, professional reports (including graphics), computerized data bases, electronic submissions, facilitation of conferences and/or working groups, quality reviews and constructability reviews, review and/or preparation of DD Form 1391 planning documentation, Preliminary Hazards Lists (PHL), Risk Assessment Codes (RAC), Preliminary Hazard Analysis (PHA), System Safety Management Plans (SSMP), facilitating and/or participating in System Safety Working Groups (SSWG), writing scope of work statements for conducting PHLs, RACs and PHAs, reviewing drawings, specifications, and hazard analyses to ensure hazards are being identified, properly evaluated and controlled and compliance with applicable Industry Standards (OSHA 1910 and OSHA Codes), and providing consultation and construction surveillance. Services may also include, but are not limited to: new facilities or structures and alterations/renovations of existing facilities or structures, in the following categories: residential - barracks (hotels, apartments), family housing, and lodges (motels); commercial/office - exchanges (light commercial), commissaries (super markets), administrative offices, chapels (churches), and clubs; recreational facilities - recreation fields, auto shops, hobby shops, youth centers, and gymnasiums; institutional - schools (child development centers, kindergartens); training facilities; and hospitals; and industrial - repair facilities, hangars, warehouses, piers, towers, utility systems (water, steam, sewer, gas, electric, communication, etc.). The DD Form 1391 documentation is prepared in the Navy's Electronic Procurement Generator (EPG) and includes cost valuation surveying, concept sketches, site sketches with utility points of connections; and may require enhancement of previously prepared basic documentation, including economic analysis and recommendations for potential utilities impacts and sustainable features. Firms are required to prepare cost estimates utilizing the SUCCESS estimating system in Work Breakdown Structures (WBS), specifications in the SPECSINTACT program, and drawings in AutoCad format. Firms will also be required to provide documents in pdf format. Some projects may also require design in the metric system. The contract requires that the selection firm have an on-line access to E-mail via the Internet for routine exchange of correspondence. This contract will require the services of a certified safety professional. The A&E must demonstrate his and each key consultant's qualifications with respect to the published evaluation factors for all services. Evaluation Factors (1) through (5) are of equal importance; factors (6), (7) and (8) are of lesser importance and will be used as tie-breakers among technically equal firms. Specific evaluation factors include: 1. Specialized Experience: (a) Past experience with regard to the systems safety engineering and management of the types of facilities or structures listed above. (b) Firm's experience in providing construction phase services (construction surveillance, construction inspection services, and design review for design/build projects). (c) Past experience in providing operations and maintenance surveillance, activity hazard analysis, and safety plan review and preparation. (d) Knowledge of local codes, laws, permits and construction materials and practices of the contract area. 2. Professional Qualifications and Technical Competence of the Individual Design Team Members: (a) Organization and office management as evidenced by management approach (management plan for this contract), and personnel roles in the organization. (b) Active professional registration (inclusive of a certified safety professional). (c) Experience (with present and other firms) and roles/responsibilities of staff members specifically on projects addressed in Evaluation Factor 1. (d) Capability to provide qualified backup staffing for key personnel to ensure continuity of services and ability to surge to meet unexpected project demands. 3. Ability to perform the work to schedules and capability to complete up to 3 taskings simultaneously (show current and known projected workload through the contract duration including option years). Firms will be evaluated in terms of impact of this workload on the design staff's projected workload during the contract period. 4. Past Performance: Firms will be evaluated in past performance with respect to work quality, compliance with schedules, and cost control (with emphasis on projects addressed in Evaluation Factor 1). Firms should include any letters of commendation or awards. 5. Quality Control Program: Firms will be evaluated on the acceptability of their internal quality control program used to ensure technical accuracy and discipline coordination of plans and specifications - list key personnel responsible. 6. Firm location (provided that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the contract). 7. Volume of Work: Firms will be evaluated in terms of work previously awarded to the firm by DOD within the past 12 months with the objective of effecting an equitable distribution of DOD A&E contracts among qualified A&E firms, including small and small disadvantaged business firms and firms that have not had prior DOD contracts. 8. Small Business and Small Disadvantaged Business Subcontracting Plan: Firms will be evaluated on the extent to which they identify and commit to the published Small Business Subcontracting Program. The Secretary of the Navy has assigned the Naval Facilities Engineering Command goals expressed in terms of percentages of total planned subcontracting dollars for utilization of small businesses of 74.8%. Included in the SB goals are targets for: Small Disadvantaged Business (SDB) - 15.5%; Women Owned Small Business (WOSB) - 14.0%; Veterans Owned Small Business (VOSB) - 3%; Services Disabled Veteran Owned Small Business (SDVOSB) - 3%; and HUBZone Small Business - 3.1%. Large business firms shall submit their Navy-wide SF 295, Summary Subcontract Report with their SF 330. The slated firms will be required to provide a preliminary subcontracting plan (support for small business subcontracting) as part of the interview. The duration of the contract will be for one (1) year from the date of an initial contract award with three (3) additional one year periods. The total amount that may be paid under this contract (including option years) will not exceed $5,000,000 for the entire contract term. The minimum guarantee for the entire contract term (including option years) will be satisfied by the award of the initial Task Order. The options may be exercised within the time frame specified in the resultant contract at the sole discretion of the Government subject to workload and/or satisfaction of the A&E performance under the subject contract. There will be no dollar limit per task order and no dollar limit per year. No other general notification to firms for other similar projects performed under this contract will be made. Type of contract: Firm Fixed Price Indefinite Quantity Contract. This proposed contract is being solicited on an unrestricted basis; therefore, replies to this notice are requested from all business concerns. The small business size standard classification is NAICS 541330 ($4,000,000). All contractors are advised that registration in the DOD Central Contractor Registration (CCR) Database is required prior to award of a contract. Failure to register in the DOD CCR Database may render your firm ineligible for award. For more information, check the DOD CCR Website: http://www.ccr.gov. Architect-Engineer Firms which meet the requirements described in this announcement are invited to submit a completed SF 330. If the SF 254/SF 255 is submitted for this solicitation, it will not be reviewed or considered. The SF 330 should be typed and one sided. As an attachment, provide an organization chart of the proposed team showing the names and roles of all key personnel listed in Section E with the associated firm as listed in Section C. Please include your DUNS, CAGE, and TIN numbers in Block 30 of the SF 330. Provide evidence that your firm is permitted by law to practice the professions of architecture or engineering, i.e., State registration number. Responses are due no later than 4:00 p.m. EST, 13 January 2005. Responses should be sent to the following address: Commander, Naval Facilities Engineering Command, Atlantic, Attn: Code AQ22E, 6506 Hampton Boulevard, Room 0126, Norfolk, Virginia 23508-1278. Late responses will be handled in accordance with FAR 52.215-1. Hand carried responses will not be accepted. Electronic (E-mail, facsimile, etc.) submissions are not authorized. Firms responding to this advertisement are requested to submit only 1 copy of the qualification statement. Inquiries concerning this project should include solicitation number and title.

More opportunities from Department Of Defense → Navfacsyscom Atlantic

Same awarding agency

NAICS: 236220
New
Federal
Navy Child Development Centers (CDC) Industrialized Construction (IC) Projects via Other Transaction Authority (10 U.S.C. § 2808a)
Solicitation # N6247027R0003
The Department of the Navy, through Navfacsyscom Atlantic, is seeking commercial vendors to provide Industrialized Construction solutions for the modernization of 11 Child Development Centers. This effort is being conducted via Other Transaction Authority under 10 U.S.C. 2808a to leverage advanced manufacturing methods such as volumetric modularity hybrid or Kit of Parts. The primary objectives are to reduce overall design and construction costs by at least 20 percent and accelerate delivery timelines by 30 percent or more compared to traditional construction methods. Proposed structures must be capable of being designed, reviewed, and approved within a 9 to 12 month timeframe while meeting or exceeding DoD Unified Facility Criteria and Whole Building Design Guide standards. The acquisition process consists of two phases, beginning with a white paper submission due by November 6, 2026. Vendors must demonstrate relevant experience by detailing at least three completed industrial construction commercial projects from the last 10 years valued at $25 million each, or three institutional projects exceeding 25,000 square feet. The government will use these white papers to short-list vendors for a second phase involving a Request for Project Proposal, where full proposals will be evaluated for best value based on expanded technical approaches, detailed price and schedule estimates, and data rights. Successful awardees must comply with the Buy American Act, Davis Bacon Act, Miller Act, and Cybersecurity Maturity Model Certification.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 17 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS