Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Environmental Protection Agency was posted on April 16, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C--Intent to Sole Source Facility Mechanical Design

Closed
68HERC25R0144Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
Field coordinator services
Solicitation # RFP 25048
The British Columbia Hydro and Power Authority (BC Hydro) is soliciting proposals under RFP 25048 for Field Coordinator Services to support the installation of new substation and generation equipment, station one-line updates, and substation capital projects within the Lower Mainland and Bridge River region. The selected consultant will provide an expert in electric utility commissioning procedures responsible for verifying that all required tests are performed and signing the Construction Notification of Energization (CNE) to confirm equipment is ready for initial energization. The contract is expected to run from approximately December 2026 to December 2028, with an optional one-year extension for a total duration of three years. Compensation is based on time spent by personnel, and all invoicing must be processed through the Ariba system with a 30-day payment term. Proposals must be submitted by November 16, 2026, via the BC Bid e-service or physical delivery to the Burnaby, BC bid station. Evaluation is based on the highest weighting of criteria, including mandatory compliance with the Freedom of Information and Protection of Privacy Act (FOIPPA). Proponents must provide comprehensive documentation, including health, safety, and cybersecurity questionnaires, as well as relationship disclosure statements. Key requirements include strict adherence to environmental packaging standards, such as the use of PVC-free and recyclable materials, and the assignment of qualified personnel who cannot be changed without prior approval from BC Hydro. The award process allows BC Hydro to reject any proposal that presents a material risk regarding financial resources, safety records, or cybersecurity.
British Columbia Hydro and Power Authority

POSTED

1 day ago

DEADLINE

in 23 days
NAICS: 541330
New
International
Village of Valemount Engineering for Accessiblity Impromvements at Cranberry Marsh
Solicitation # 2480-95-26
The Village of Valemount is seeking proposals under solicitation 2480-95-26 for engineering services to implement accessibility improvements at the Cranberry Marsh Boardwalk in British Columbia. The objective is to develop a shovel-ready planning package that includes a preferred concept plan, concept design drawings, and a Class C cost estimate. Additionally, the selected proponent must provide documentation and recommendations to support future grant applications, specifically for SHORE Stream 2. The total available budget for this project is up to 55,000 dollars, excluding GST, which must cover all professional fees, travel, and disbursements. The project must be completed by April 30, 2027, with a start date to be negotiated. All work must strictly adhere to the DWB Environmental Management Plan, requiring a qualified Environmental Monitor for sensitive phases and ensuring machinery is clean and leak-free to protect the wetland. Technical specifications require compliance with CAN/CSA-56-06 for design, CSA164 for galvanizing, and CSA G40.21M for structural steel. Proponents must submit a fixed-fee budget by phase, a work program, and a letter of introduction. This process is a request for proposals rather than a formal tender, and the Village reserves the right to negotiate a separate contract independently of the RFP process.
Village of Valemount

POSTED

1 day ago

DEADLINE

in 23 days

General Info

Contract Value

$688,555.51

NAICS

541330 - Engineering Services

Place of Performance

919 Kerr Rd, Ada, OK, 74820, USA

Set-Aside

NONE

Award Issued Date

Documents

1

04162025_Intent_to_Sole_Source_Synopsis_-_Mechanical_Design__Ada__OK_1.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyEnvironmental Protection Agency → Cincinnati Acquisition Division (cad)
Contacts1 person available
OfficeCINCINNATI, OH, 45268, USA
Office AddressCINCINNATI, OH, 45268, USA

Full Description

Show more
Synopsis - Notice of Intent to Sole Source Design Services for Mechanical System and Roofing Integration, Ada, Oklahoma Proposed Solicitation Number: 68HERC25R0144 The U.S. Environmental Protection Agency's (EPA) Cincinnati Acquisition Division (located at 26 Martin Luther King Dr. W, Cincinnati, OH 45268) intends to solicit I DESIGN AND PLANNING, LLC (iDesign) (2531 Ridge RD STE 100, White Lake, Michigan, 48383-1750) on a sole source basis for a new firm-fixed price contract for the design of Mechanical Systems and Roofing Integration at the Robert Kerr Environmental Research Center. This sole source solicitation will be made under the authority of FAR Part 6.302-1 Only One Responsible Source and No Other Supplies Or Services Will Satisfy Agency Requirements. The design requirement requires the seamless integration of a newly proposed mechanical design with the recently upgraded mechanical systems designed by iDesign. The mechanical design will build upon a concept design prepared by iDesign. Therefore, iDesign is in a unique position to provide design integration of the new mechanical and roofing systems into the current mechanical system. The following is a partial listing of the requirements for this project: - Completion of mechanical conception design to 100% construction documents. (final IFC set, stamped drawings). Final 100% submission to include cost estimate. - Prepare Design Alternates to replace roof at the Main Lab building & Library and Conference Center (LCC) (Alternates to be awarded at the Government's discretion) - Refine mechanical, electrical, plumbing (MEP), structural, and civil elements as needed. - Integrate vendor data from pre-purchased mechanical equipment - Develop detailed load calculations, layouts, and equipment schedules. - Coordinate with architectural and structural disciplines. - Develop detailed engineering drawings, specifications, and schedules. - Perform quality control (QC) reviews to ensure compliance with project requirements. - Conduct interdisciplinary clash detection and coordination. - Complete all final specifications, drawings, and submittal requirements. - Provide a permit-ready document package. - Address final owner and stakeholder comments before issuing documents. - The energy model should be performed in accordance with ASHRAE 90.1 and the Guiding Principles for Sustainable New Construction. The following is a partial listing of codes, standards, and regulatory references that apply to the Project: - All applicable federal, state and local standards and regulations - All Oklahoma state, fire, safety and health regulations - All applicable NFPA Codes - OSHA, Occupational Safety and Health Administration Regulations - EPA Facilities Manuals (Volumes 1 - 4) - GSA Facilities Standards for the Public Buildings Service (P100) - National Electric Code (NEC) - Architectural Barriers Act Accessibility Standard (ABAAS) - American National Standards Institute (ANSI)/American Society of Mechanical Engineers (ASME) - National Environmental Balancing Bureau (NEBB) - State of Oklahoma ICC Adopted Codes - American Society of Heating Refrigeration and Air Conditioning Engineering (ASHRAE) - Sheet Metal and Air Conditioning Contractors National Association (SMACNA) - Guiding Principles for Sustainable Federal Buildings Conclusion: FAR Part 6.302-1, Only One Responsible Source And No Other Supplies Or Services Will Satisfy Agency Requirements. The nature of this acquisition requires the U.S. EPA to use the authority cited because of the complex nature of integrating the new design into the current design and roofing systems. iDesign is uniquely qualified to provide the ongoing design services given their past role providing the design services for the currently upgraded mechanical system. The utilization of a different A/E firm would likely require additional engineering support and additional lead time to become familiar with the status of the design work as well as existing site conditions. A different firm would be forced to interpret the various elements of iDesign's existing concept design to respond to questions raised by construction contractor. This would result in a longer timeline for the completion and additional cost to the government. A sole source award to iDesign will allow construction to continue with no disruption and effort lost. A disruption and requirements delay are likely if a new contractor were brought in. iDesign is also uniquely qualified for this work because of their in-depth knowledge of the EPA Robert S. Kerr Environmental Research Center facilities. This knowledge is critical to minimize costs, keep the Robert S. Kerr laboratories operational and the building occupant's safe during the design integration. Finally'and critically'iDesign is currently providing construction administration services for ongoing construction work at the Ada facilities. To inject a new A/E firm, with new engineers and architects, into the existing, fluid construction project is extremely impractical. Questions would arise as to which A/E firm is responsible for reviewing and finalizing changes flowing from the new design, or for certifying that the new designs do not compromise features of existing design. Assigning liability for any potential issues would be very difficult. All of these potential challenges could result in construction delays or building closures. However, the research performed at the EPA Robert S. Kerr campus is mission critical and having a disruption in services, which could potentially close the labs for a period of time, cannot be permitted. As the continuation of design oversight, for the necessary laboratory consolidation, and consistency of the known consolidation requirements, it is in the best interest of the Government to award this follow-on contract to iDesign. Utilization of iDesign avoids all of the pitfalls enumerated above. This requirement will utilize FAR Part 36. The product service code is C1DB, Architect and Engineering - Construction: Laboratories. The North American Industry Classification System (NAICS) code is NAICS Code 541330 Engineering Services with a small business size of $25.5M. The estimated construction cost of the work resulting from the design is under $10M. The anticipated Period of Performance is 7 months. Contract award is anticipated to be made Spring 2025. THIS NOTICE IS NOT A REQUEST FOR PROPOSALS. Notwithstanding, all responsible sources that believe they are capable of meeting the EPA's requirement may submit a capability statement, proposal, or quotation'that must address the outlined requirements above'which shall be considered by the agency. Such documentation must be submitted to the Contracting Officer by 11:59 PM Eastern Time on May 1, 2025. A determination not to compete the proposed firm-fixed-price contract based upon the responses received to this notice is solely within the discretion of the Government. All questions should be directed to the Contracting Officer, Greg Forrest, at forrest.greg@epa.gov. Responses to this notice must be submitted electronically via email. Telephone responses will not be honored.

More opportunities from Environmental Protection Agency → Cincinnati Acquisition Division (cad)

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS