Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on April 23, 2007. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C -- IQ A/E COST ENGINEERING AND VALUE ENGINEERING SERVICES FOR CALIFORNIA, ARIZONA, NEVADA, NEW MEXICO AND UTAH

Closed
N62473-07-R-2018Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Fire Alarm engineering for Lewis County
Solicitation # 2026-RFQ-040
Lewis County is soliciting qualifications under solicitation 2026-RFQ-040 for a professional engineering firm to provide comprehensive design and engineering services for fire alarm systems. The project encompasses several County-owned facilities, including the IT Building, Historic Courthouse, Health Building, and Lewis County Jail. The selected firm will be responsible for conducting on-site evaluations to determine the remaining useful life of existing systems, assessing code compliance with NFPA 72, IBC, and IFC standards, and developing bid-ready construction drawings and technical specifications. All designs must be stamped by a licensed electrical engineer familiar with Washington State fire alarm requirements and must integrate smoothly with existing infrastructure to ensure standardized maintenance and operations. Proposals are due by November 10, 2026, via the OpenGov platform and will be evaluated by a committee of at least three County employees using a points-based system. The evaluation criteria are equally weighted at 20 percent each across four categories: firm qualifications (including NICET certifications and licensed engineer availability), responsiveness and capacity to begin work within 30 days, regulatory compliance and permitting records, and the clarity and detail of blueprint designs. Applicants must provide a statement of qualifications, three public agency references from the last five years, and resumes of key personnel. The contract is administered by Matt Patana, Capital Infrastructure Specialist, based in Chehalis, Washington.
Capital Infrastructure

POSTED

about 14 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
International
Provision of Consulting Services for Regional Basement Flooding Mitigation Program Strategic Plan
Solicitation # P-1353-26
The Region of Halton is soliciting proposals for a consulting firm to conduct a comprehensive review of its existing Basement Flooding Mitigation Program and develop a three-year Strategic Plan. The primary objectives are to reduce basement flooding risks, enhance wastewater system resilience, and decrease wet-weather flows. The project is expected to be completed within nine months of kick-off and includes key deliverables such as a current-state assessment report, a prioritization framework for initiatives, a final strategic plan with an implementation roadmap, and a performance measurement and reporting framework. The selected consultant must provide a Project Manager with PMP certification or equivalent credentials. The contract will be awarded based on a scoring system where the technical proposal accounts for 80 points and the cost proposal accounts for 20 points. Proponents must achieve a minimum technical score of 70% to be considered for award and may be invited to a 30-minute presentation. Mandatory submission requirements include a technical proposal, a signed Vendor Code of Conduct Acknowledgement Form, and a cost proposal submitted via the online bidding system by November 12, 2026. The agreement is governed by a modified Standard Agreement and Supplementary Conditions, requiring the consultant to maintain specific insurance coverages: 5 million dollars for Commercial General Liability, 2 million dollars for Automobile Liability, and 2 million dollars for Professional Liability. Additionally, the consultant must provide a WSIB clearance certificate upon award and with every monthly electronic invoice. All produced materials remain the sole property of the Region of Halton, and deliverables must comply with the Ontario Building Code and the Accessibility for Ontarians with Disabilities Act.
Region of Halton

POSTED

about 16 hours ago

DEADLINE

in 23 days
NAICS: 541330
New
SLED
REQUEST FOR PROPOSAL (RFP) STAR Centre Energy Modernization Project Energy Audit
Solicitation # BPM059233
The City of Havre de Grace is seeking proposals for a comprehensive energy audit of the STAR Centre, the city's largest public building, as the first phase of an Energy Modernization effort. This grant-funded project, supported by the Maryland Energy Administration Local Government Energy Modernization Program Grant 52-600796, requires a contractor to perform an ASHRAE Level 1 walkthrough Energy Audit. The scope includes documenting baseline operating conditions, analyzing utility billing data, evaluating eligibility for utility rebates, and providing a detailed report of energy efficiency measures for lighting, HVAC, and building envelope weatherization. Additionally, the contractor must develop a Monitoring Based Commissioning Plan (MBCx) to support future energy management and continuous performance monitoring. The contract will be awarded based on the best value to the city, considering the technical approach, cost factor, and the bidder's experience. Eligible offerors must be established businesses with at least five years of industry experience and must be in good standing with the State of Maryland, Harford County, and the City of Havre de Grace. Required submission documents include a Maryland Business License, a Certificate of Good Standing, an IRS W-9, and evidence of insurance covering General Liability, Workers' Compensation, and Errors and Omissions. Proposals must be submitted electronically via Beacon Bid by November 23, 2026. The selected vendor must be able to complete the audit and deliverables within a 60-day period, with a final project completion deadline of February 5, 2027. Payment will be made upon the successful completion of services, with the possibility of progress payments based on a satisfactory schedule.
City of Havre de Grace

POSTED

about 16 hours ago

DEADLINE

in about 1 month

General Info

NAICS

541330 - Engineering Services

Place of Performance

CALIFORNIA, ARIZONA, NEVADA, NEW MEXICO, AND UTAH 92132, CA

Set-Aside

NONE

Documents

1

20070416161015.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Southwest
Contacts1 person available
OfficeSAN DIEGO, CA, 92132-0001, USA
Office AddressSAN DIEGO, CA, 92132-0001, USA
Contacts
vanessa a schuttContract Specialist

Full Description

Show more
THIS IS TO CONFIRM THAT SUBMISSION DATE IS 03 MAY 2007, 2:OOPM (PT). DESCRIPTION: There is no solicitation to download. Architect/Engineer (A/E) services are required for a firm fixed-price Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract for Navy Cost Estimating Services. The preponderance of work is in southern California, Nevada, Arizona, and New Mexico. A. STATEMENT OF SERVICES REQUIRED The general scope of this contract includes architectural and engineering services in cost engineering services for new construction, alteration, repair, renovation, and maintenance projects. Work includes preparation of cost estimates using WBS, Uniformat II or CSI formats in excel spreadsheet and/or cost estimating programs such as SUCCESS, PCEM and PACES, field investigations reports, schematic layouts, construction cost reduction evaluation and recommendation, bid analysis and verification, estimates for 1391 validation and government representation on claims, litigations, and negotiations boards/committees. Work may also require using metric system measurements. The maximum contract value may not exceed $5,000,000 aggregate total. The minimum guarantee for the contract shall be $5,000. The maximum value of individual task orders executed under this contract may not exceed $500,000. Multiple task orders may be awarded with similar completion schedules and overlapping delivery dates. Contract term is for a one-year base period with four option periods. Each performance period will run 365 calendar days, or until the maximum dollar limit is reached, whichever occurs first. The hourly rates will be negotiated for each calendar (12 month period) year. The government may exercise the option period unilaterally. Per NFAS 17.208-100(c)(1), options for post construction award services may be negotiated on individual task orders for unilateral exercise. The estimated start date is July 2007. Brooks Act and Federal Acquisition Regulations (FAR) Part 36.6 selection procedures apply. The NAICS Code for this procurement is 541330 and the annual small business size standard is $4.5 Million. The Government makes no representation as to the number of task orders or the actual amount of work to be ordered. Contractors are not guaranteed work in excess of the minimum guarantee. Firms that design or prepare specifications for a construction contract or task order issued under the resulting contract are prohibited from providing the subsequent construction. This limitation also applies to subsidiaries/affiliates of the firm. SELECTION CRITERIA AND SUBMITTAL REQUIREMENTS: The selection will be based on the following criteria: Criteria 1, Professional Qualifications (SF 330, Section E); Criteria 2, Recent Team Experience (SF 330, Section F); Criteria 3; Past Performance (SF 330, Section F and H); The remaining Criteria is to be addressed in SF 330, Section H. Criteria 4; Quality Control; Criteria 5, Capacity; Criteria 6, Location; Criteria 7: Commitment to Small Business; Criteria 8, Sustainable Design and Anti-Terrorism; and Criteria 9, Volume of Work. SF 330s will be evaluated to determine the most highly qualified firm based on criteria responses. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, and publicly available sources. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being considered less qualified. All projects provided in the SF 330 (Architect-Engineer Qualifications) must be completed by the office/branch/individual team member actually performing the work under this contract. Projects not performed by the office/branch/individual team member will be excluded from evaluation consideration. Submission Requirements: The SF 330 Part 1 is limited to 30, 8.5?x11? pages. Part 2 is limited to one page per firm. Minimum font size is 10. Submit the following: a) One (1) original and four (4) copies of SF 330 for the prime offeror (which also includes a completed Part II for the firm and key subconsultants) addressing following selection criteria information; and b) one compact disk copy, in Adobe Acrobat format, of the complete SF330 being submitted by the firm. SF330, Part 1, Section B: Contract Information: In Block 5, list firm?s Dunn and Bradstreet and Taxpayer Identification Number in addition to the name of the firm. SF330, Part 1, Section D: Organization Chart: In addition to the Instructions provided for the SF 330, identify the overall relationship and lines of authority of the proposed team, including key subconsultants. (Note: All individuals listed on the organization chart are not required to have a resume in Section E, such as administrative or lower level engineering positions.) This chart shall not be counted as part of the 30 page limitation. This chart must be affixed to the submittal to avoid separation in handling. SF 330, Part 1, Section E, CRITERIA 1, PROFESSIONAL QUALIFICATIONS: Professional qualifications of the proposed team members assigned to this project in Architect-Engineer (A-E) services including cost engineering services for new construction, alteration, repair, renovation, and maintenance projects. Work includes preparation of cost estimates using WBS, Uniformat II or CSI formats in excel spreadsheet and/or cost estimating programs such as SUCCESS, PCEM and PACES, field investigations reports, schematic layouts, construction cost reduction evaluation and recommendation, bid analysis and verification, estimates for 1391 validation and government representation on claims, litigations, and negotiations boards/committees. Work may also require using metric system measurements. Submission Requirements: Provide brief resumes of each proposed team member who will specifically perform the major tasks listed above for this project. All Key personnel must be professionally registered/accredited in their discipline. Provide the highest level of education achieved and the number of years engaged in the discipline. Each resume shall include a maximum of five (5) specific completed projects that best illustrate the individual member?s experience. SF 330, Part 1, Section F, CRITERIA 2, RECENT TEAM EXPERIENCE: Specialized experience and technical competence of the proposed team members assigned to this project experienced in cost engineering services for new construction, alteration, repair, renovation, and maintenance projects. Work includes preparation of cost estimates using WBS, Uniformat II or CSI formats in excel spreadsheet and/or cost estimating programs such as SUCCESS, PCEM and PACES, field investigations reports, schematic layouts, construction cost reduction evaluation and recommendation, bid analysis and verification, estimates for 1391 validation and government representation on claims, litigations, and negotiations boards/committees. Work may also require using metric system measurements. Submission Requirements: Submission Requirements: For each firm, provide a maximum of ten (10) specific completed projects that best illustrate overall team experience. Include within block 24 of the SF330, Section F, a brief narrative for each project. Discuss effectiveness by conformance to scope, adherence to performance schedules, limiting changes and delivering a product that satisfies the requirements. SF330, Section G, Key Personnel Participation in Example Projects: Submit in accordance with the SF 330 Instructions. From the total projects listed in Section F, provide a maximum of ten (10) projects. SF330, Section H, Additional Information requested by Agency. Address the remaining Criteria 3 through 9; additional sheets may be used up to the maximum of 30 total sheets, if required. See submission requirements. Clearly identify the Criteria number and title. CRITERIA 3, PAST PERFORMANCE: Past performance with Government agencies and private industry with respect to quality of work. Points of contact provided in other criteria may be contacted. A proposal with no record of relevant past performance information shall be evaluated neither favorably nor unfavorably. Submission Requirements: Show past performance on contracts with government agencies and private industry in terms of cost control, quality of work and compliance with performance schedules. Indicate effectiveness by listing budget/estimated construction cost, award amount, final design estimate, and construction change order rate for at least five recent projects. Briefly describe internal quality assurance and cost control procedures and indicate team members who are responsible for monitoring these processes and how quality of subcontractors work will be assured. List recent awards, commendations, and other performance evaluations (do not submit copies). CRITERIA 4, QUALITY CONTROL: Demonstrated success of the Office Quality Control (QC) program used by the firm to ensure quality products. Submission Requirement: Address Quality Control program, safety policy, and the success of the program used by the firm. Describe who is primarily responsible for the QC program and how the prime firm ensures quality consistently across the entire team. Briefly describe internal quality assurance and cost control procedures and indicate effectiveness. Address the team?s QC processes for checking documents for errors, omissions and quality and incorporating and tracking review comments. Of special interest are the QC processes in place that minimizes the government?s effort to QA the AE?s work product for errors, omissions and quality. Indicate team members who are responsible for monitoring these processes. CRITERIA 5, CAPACITY: Capacity to accomplish the work in the required time. Submission Requirement: Describe firm?s capacity to accomplish work in required time frames. Indicate the firm?s present workload and the availability of the project team (including consultants) for the specified contract performance period. Indicate specialized equipment available. Indicate the firm?s and key personnel prior security clearances. CRITERIA 6, LOCATION: Firm's location within and demonstrated knowledge of the general geographical areas in which projects could be located. The work for this contract shall occur at various Navy and Marine Corps facilities and other government facilities located in Arizona, California, Colorado, Nevada, New Mexico and Utah. The preponderance of work is in southern California, Nevada, Arizona, and New Mexico. Submission Requirements: Indicate Firm?s location of main offices, branch offices, and sub-consultants offices. Describe and illustrate the team?s knowledge and availability to work in the geographical area. CRITERIA 7,COMMITMENT TO SMALL BUSINESS: Use of small business concerns as subconsultants.(NOTE: SMALL BUSINESS FIRMS MUST ALSO ADDRESS THIS CRITERIA. ALL FIRMS, REGARDLESS OF SIZE, WILL BE EVALUATED ON THEIR COMMITMENT TO SMALL BUSINESSES) Submission Requirement: Demonstrate commitment and use of small business concerns as subconsultants on this contract. Provide a chart with each small business category, identify the proposed names of the small businesses, and the dollar amount and subcontracting percentage the prime anticipates subcontracting to each firm. Additionally large business firms must provide a brief narrative as to how your firm will meet the following small business subcontracting goals: Small Business (SB)?25%; Small Disadvantaged Business?5%; Women-Owned SB?5%; HUBZone 3%; Service-Disabled Veteran-Owned SB?3%; Veteran-Owned SB?3%; and NOTE: If a large business firm is selected for award, an acceptable subcontracting plan that reflects a minimum of subcontracting goals stated above must be submitted before price negotiations begin for contact award. CRITERIA 8, SUSTAINABLE DESIGN AND ANTI-TERRORISM: Demonstrated success and knowledge in sustainable design and Anti-Terrorism. Submission Requirements: Describe the team?s knowledge of and experience with the Leadership in Energy and Environmental Design (LEED) program, the use of recovered materials, and sustainable principles and concepts, particularly related to site design. Describe knowledge of and experience with anti-terrorism, with current knowledge of the UFC and related guidance including, but not limited to, Military Handbooks, Design Manuals, and User Guides addressing personnel and assets in Department of Defense facilities. Describe the use of these documents in association with mitigation measures in planning, design and construction, including, but not limited to, standoff distances, blast-resistant design and prevention of progressive collapse, the design of physical security equipment, and creative solutions for anti-terrorism site design. CRITERIA 9, VOLUME OF WORK: Volume of DOD work awarded to firm in past 12 months with objective of equitably distributing contracts among firms, including minority owned firms and firms without prior DOD contracts. Submission Requirement: Provide a list of DOD contracts awarded in the last 12 months. Firms with multiple offices shall indicate which branch office completed each project. Include agency phone numbers and points of contact. SELECTION INTERVIEW REQUIREMENTS: Personal interviews may be scheduled for firms slated as most highly qualified. Firms slated for interviews may be asked to explain management and the Firms abilities. Elaborate presentations are not desired. ADDITIONAL INFORMATION: All information must be included in the SF 330 package, (cover letter, attachments and excess number of pages will be excluded from the evaluation process). Per DFAR 252.204.7004, firms must be registered with Central Contractor Registration (CCR) and Vets100 prior to contract award. CCR website is http://www.ccr.gov and Vets 100 is http://vets.dol.gov/vets100. In accordance with the Brooks Act, the AE Firm must be a registered/licensed architectural and/or engineering firm and will be required to submit such proof prior to the interview phase of the selection process. Those firms which meet the requirements described in this announcement and wish to be considered must submit the SF 330, per submission requirements. Five copies of the submittal package (original, plus 4 copies and CD) are to be received in this office (1220 Pacific Highway, Attn: Code RAQ20.VS, Attn: Vanessa Schutt, San Diego, CA 92132) no later than, 2:00 P.M. Pacific Standard Time on Thursday, 03 May 2007. Submittals received after this date and time will not be considered. Facsimile and emailed SF 330?s will not be accepted. Debriefing requests will not be entertained prior to 45 days after the submittal due date. THIS IS NOT A REQUEST FOR PROPOSAL. ALL INFORMATION NEEDED TO SUBMIT SF 330 DOCUMENTS IS CONTAINED HEREIN. NO SOLICITATION PACKAGE, TECHNICAL INFORMATION, OR BIDDER/PLAN HOLDER LIST WILL BE ISSUED. It is the offeror?s responsibility to check the NAVFAC electronic solicitation website at: http://esol.navfac.navy.mil for any revisions to this announcement or other notices. Plan-holder list available is via the ESOL website under this solicitation number. Address inquiries via email: vanessa.schutt@navy.mil or via telephone: 619-532-3779 *** END OF ANNOUNCEMENT ***

More opportunities from Department Of Defense → Navfacsyscom Southwest

Same awarding agency

NAICS: 238210
New
Federal
IDIQ JOC TOTAL SMALL-BUSINESS SET-ASIDE FOR ELECTRICAL AND OTHER WIRING INSTALLATION PROJECTS AT VARIOUS GOVERNMENT FACILITIES LOCATED WITHIN THE MARINE CORPS LOGISTICS BASE BARSTOW, MARINE CO
Solicitation # N6247324R2610
Solicitation N6247324R2610 is a Total Small-Business Set-Aside Indefinite Delivery Indefinite Quantity Job Order Contract (IDIQ JOC) issued by NAVFAC Southwest. The contract is for electrical and other wiring installation projects, including repair, renovation, and minor new construction, at various government facilities in California, specifically Marine Corps Logistics Base Barstow, Marine Corps Air-Ground Combat Center 29 Palms, Marine Corps Mountain Warfare Training Center Bridgeport, and Naval Air Weapons Station China Lake. The contract has a maximum value of 35 million dollars, with individual task orders ranging from 2,000 dollars to 1 million dollars. The performance period consists of a two-year base period and two three-year option periods, for a maximum total duration of eight years. The basis of award is Lowest Priced Technically Acceptable (LPTA). Proposals are evaluated on five factors: Ability to Manage Multiple Simultaneous Projects, Experience, Past Performance, Safety, and Price. All non-price factors are rated as acceptable or unacceptable, with Factor 1 serving as a threshold requirement for eligibility. Pricing is based on established coefficients and pre-determined unit prices using R.S. Means Cost Data. Offerors must submit their proposals electronically via the PIEE Solicitation Module by October 28, 2026. Key requirements include a 5,000 dollar bid bond, CMMC Level 2 (Self) status, and compliance with Davis-Bacon wage determinations and various DFARS clauses regarding Russian fossil fuel business operations and restrictions on certain magnets, tantalum, and tungsten.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

5 days ago

DEADLINE

in 8 days
View Details
NAICS: 238220
New
Federal
IDIQ, JOC FOR PLUMBING, HEATING, AIR CONDITIONING PROJECTS AT MARINE CORPS LOGISTICS BASE BARSTOW, MARINE CORPS AIR-GROUND COMBAT CENTER 29 PALMS, MARINE CORPS MOUNTAIN WARFARE TRAINING CENTER BRIDGEPORT, AND NAVAL AIR WEAPONS STATION CHINA LAKE, CA AOR
Solicitation # N6247324R2611
This is a Total Small Business Set-Aside Indefinite Delivery Indefinite Quantity (IDIQ) Job Order Contract (JOC) issued by NAVFAC Southwest for plumbing, heating, and air conditioning projects. The contract covers various government facilities within the California Area of Responsibility, specifically Marine Corps Logistics Base Barstow, Marine Corps Air-Ground Combat Center 29 Palms, Marine Corps Mountain Warfare Training Center Bridgeport, and Naval Air Weapons Station China Lake. The contract has a maximum ceiling value of 49 million dollars with a minimum government obligation of 5,000 dollars. The performance period consists of a two-year base period from December 1, 2024, through November 30, 2026, with two subsequent three-year option periods extending the potential performance through November 30, 2032. The procurement utilizes a Lowest Priced, Technically Acceptable (LPTA) award process. Non-price evaluation factors, including the bidder's ability and experience, technical approach, and safety records, are rated as either acceptable or unacceptable. Pricing is based on a coefficient model where offerors provide multipliers applied to R.S. Means Cost Data. Task orders are issued as Firm Fixed Price contracts with individual order limits ranging from a minimum of 2,000 dollars to a maximum of 2 million dollars. Key compliance requirements include adherence to the Davis-Bacon Act for prevailing wages in San Bernardino, Kern, Mono, and Inyo counties, and Cybersecurity Maturity Model Certification (CMMC) verification. Recent amendments have incorporated prohibitions regarding Russian fossil fuel business operations and restrictions on certain foreign-sourced magnets, tantalum, and tungsten. Contractors must also comply with strict safety standards, including OSHA and EM 385-1-1, and utilize the Wide Area WorkFlow (WAWF) system for electronic invoicing and payment.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in about 9 hours
View Details
NAICS: 236220
New
Federal
IDIQ JOC FOR GENERAL CONSTRUCTION PROJECTS AT GOVERNMENT INSTALLATIONS WITHIN NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND SOUTHWEST THE METROPOLITAN SAN DIEGO (NAVAL BASES SAN DIEGO, POINT LOMA, CORONADO AND MARINE CORPS AIR STATION (MCAS) MIRAMAR, CALIF
Solicitation # N6247325R0062
Navfacsyscom Southwest is conducting a market survey via a Sources Sought Synopsis to identify qualified small businesses for an Indefinite Delivery Indefinite Quantity Job Order Contract. The scope of work involves new general building construction, repair, and renovation projects at various government facilities in the Metropolitan San Diego area, including Naval Base San Diego, Naval Base Point Loma, Naval Base Coronado, and Marine Corps Air Station Miramar. The proposed contract features a two-year base period with a three-year option, for a maximum duration of five years. The estimated total contract value is 99 million dollars, with individual task orders expected to range between 2,000 and 2 million dollars. The government is specifically seeking sources that are Small Businesses, SBA certified 8(a), HUBZone, Women Owned, or Service-Disabled Veteran Owned. Under NAICS code 236220, the small business size standard is 45 million dollars. To be considered, interested firms must provide their UEI and CAGE code, bonding capacity, and evidence of a physical office within a 150-mile or three-hour radius of the installations. Capability is evaluated based on the submission of three to five recent prime contracts completed within the last five years, each valued at a minimum of 100,000 dollars, with at least 50 percent of the work self-performed. Additionally, firms must provide OSHA DART and TRC rates for 2023 through 2025, with detailed explanations required for DART rates above 3.0 or TRC rates above 4.5. Responses must be submitted via email to Rashonda T. Smith by October 28, 2026.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 8 days
View Details
NAICS: 562910
Federal
Request for Offer for RADMAC III Parcel E Remedial Action
Solicitation # N6247326RB009
Solicitation N62473-26-R-B-009 is a competitive request for offers under the RADMAC III Multiple Award Contract for the second phase of remedial action at Parcel E, Hunters Point Naval Shipyard in San Francisco, California. The project focuses on remediating non-aqueous phase liquid contamination at Installation Restoration Site 03, with a scope of work that includes shoreline excavation, confirmation sampling, in-situ stabilization, shoreline revetment, and the installation of a groundwater containment slurry wall and monitoring wells. The performance period is 60 months from the date of award, with work required to commence within 15 calendar days of the task order. The contract will be awarded based on best value using a trade-off process, evaluating three primary factors: Technical Approach, Local Hiring, and Price. The Technical Approach is weighted as twice as important as Local Hiring, and combined, these non-price factors are approximately equal in importance to the price. Offerors must possess valid radioactive materials licenses from the Nuclear Regulatory Commission and the State of California Department of Health Services. Additionally, the project requires 100 percent Payment and Performance Bonds for construction elements and adherence to both Service Contract Act and Davis-Bacon wage determinations. Proposals must be submitted electronically via the PIEE Solicitation Module, with a final submission deadline of November 3, 2026.
Remediation Services

POSTED

7 days ago

DEADLINE

in 14 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS