Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 24, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C--Montana National Guard A&E IDIQ Synopsis

Awarded
W9124V-15-R-0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 14 days

AI Contract Overview

Show more

The United States Property and Fiscal Office for the Montana National Guard is seeking a qualified firm for a single firm-fixed-price Indefinite Delivery/Indefinite Quantity contract to provide multi-discipline architectural and engineering services. The scope includes Type A investigative, Type B design, and Type C construction surveillance and inspection services for various projects across the state of Montana, primarily supporting the Air and Army National Guard. The contract consists of a one-year base period with four successive one-year options, featuring a cumulative ceiling of 5 million dollars and a minimum guaranteed amount of 2,000 dollars. Individual task orders are generally limited to 500,000 dollars, though exceptions up to 1.5 million dollars may be approved. Selection is based on professional qualifications, specialized experience, capability to handle multiple concurrent task orders, past performance, and geographical knowledge of Montana, rather than competitive bidding. Required disciplines include architectural, mechanical, electrical, civil, and structural engineering, among others. Large businesses are required to meet specific small business subcontracting goals. Interested firms must be registered in the System for Award Management and submit a completed SF 330 for evaluation.

General Info

Contract Value

$0

NAICS

541330 - Engineering Services

Place of Performance

USPFO for Montana 1956 Mt Majo Street Fort Harrison MT 59636-4789 US, MT, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7NK Uspfo Activity Mt Arng
Contacts1 person available
OfficeFORT HARRISON, MT, 59636-4789, USA
Office AddressFORT HARRISON, MT, 59636-4789, USA
Contacts

Full Description

Show more
SYNOPSIS: The government is looking for qualified firms to Perform Type A (investigative), B (design), and C (construction surveillance and inspection) Architectural and Engineering consulting services. An Indefinite quantity/Indefinite Delivery (ID/IQ) Fixed Price contract is contemplated. Services will be mainly performed at the Montana Air National Guard, Great Falls, Montana but may include other locations within the state of Montana. The A-E indefinite delivery contract may be utilized by all National Guard Contracting Offices within the State of Montana. These services will be required for an undermined number of projects of varying size and complexity. Firms must have ability to perform up to three or more task orders simultaneously. DESCRIPTION: Indefinite Delivery/Indefinite Quantity Architect and Engineering Services Contract. The United States Property and Fiscal Office (USPFO), Montana National Guard, intends to award a single firm-fixed price Indefinite Delivery Indefinite Quantity (IDIQ) Architect-Engineer (A-E) Services contract. This announcement is being solicited as unrestricted. Small business size standard is $14.0 Million for NAICS 541330. The Point of contact for this announcement is MAJ Chris Lende. Submit questions to christopher.c.lende.mil@mail.mil. CONTRACT INFORMATION: The work requires multi-discipline professional A-E services for various projects throughout the State of Montana supporting projects for both the Montana Air National Guard and Montana Army National Guard. The selection of a firm is not based upon competitive bidding procedures, but rather the process for A-E firm selection described in FAR 36 using the competitive ranking of firms based upon the professional qualifications necessary for the performance of the required services, as more fully set forth in the selection criteria. The competitive ranking will be followed by a negotiation with the most highly ranked firm and continuing to lower ranked firms only if satisfactory terms are not reached with the preferred firm as described in FAR 36.606. The A-E firm must be capable of responding to and working on multiple task orders concurrently. All firms responding to this announcement are cautioned to review FAR 9.5 - Organizational and Consultant Conflicts of interest; and FAR 36.209 - Construction Contracts with Architect-Engineer firms. The United States Property and Fiscal Office (USPFO) for Montana intends to award one (1) Firm-Fixed-Price Architect-Engineer (A-E) Indefinite Delivery/Indefinite Quantity (IDIQ) Contract, with Options, for support of National Guard activities throughout the State of Montana. The A-E IDIQ contract will be established for a base period of one (1) year with options exercisable for four (4) successive one (1) year option periods. A one-time minimum guaranteed amount for the contract is $2,000.00; and a cumulative $5 Million ceiling will apply for the duration of the contract with a $500,000 limit on individual Task Order except in unusual circumstances and approved by higher headquarters up to $1,500,000. There is no minimum guarantee in the option years. Firm-Fixed-Price (FFP) Task Orders are anticipated to be awarded against the A-E IDIQ contract. Large business firms that intend to do contracting must convey their intent to meet the minimum small business goals on the SF 330, Section C. by identifying subcontracting opportunities with small businesses. If selected, the large business offeror will be required to submit a Small Business Subcontracting Plan in accordance with FAR 52.219-9 and DFARS 219.704/705 as a part of the Request for Proposal Package. The subcontracting plan is NOT required with the initial SF 330 submittal. The National Guard subcontracting goals are as follows: Small Business 14.0% Small Disadvantaged Business 3.0 % Women-Owned Small Business 5.0 % HUBZone Small Business 1.0% Veteran Owned Small Business 3.0% Service-Disabled Veteran-Owned Small Business 3.0% The Government anticipates that this announcement will result in the award of one contract to provide services to supported locations/activities on a statewide basis. Offerors shall note that there will be no travel paid on the resulting task order unless specifically authorized by the contracting officer and only in unusual circumstances. DUTIES: Work will involve a broad variety of investigative, design and construction monitoring services (Types A, B, and C services respectively), in accordance with applicable Army, Air Force and National Guard regulations/standards for facility design and construction and miscellaneous other services which include, but are not limited to: Investigative, design and/or monitoring services for design-bid-build and criteria consultant services for design-build projects pertaining to repair, maintenance, alteration or new construction of facilities and aviation-related structures; scope development, design criteria and conceptual designs; feasibility and planning studies; field investigations; plans and specifications; historical preservation and archaeological services, studies and reports; topographic subsurface investigation and other surveys; anti-terrorism/force protection; space planning and interior design; construction cost estimating; quality control; asbestos and lead-based paint assessment and abatement; building evaluation reports; construction management; life safety studies; fire protection measures; life cycle cost analyses; landscaping design; miscellaneous design and problem analyses; independent technical review of product submittals; and on occasion, participation in peer review processes and source selection boards. Designed projects shall incorporate but are not limited to applicable sustainable design methods and practices in accordance with Executive Order 13423 of January 24, 2007, Federal Leadership Sustainable Buildings Memorandum of Understanding (MOU) and Energy Independence and Security Act of 2007 (EISA). DISCIPLINES: The work will require primarily architectural; mechanical, electrical, civil and structural engineering; cost estimating; and specification writing services but may also necessitate, but is not limited to geotechnical, toning/subsurface mapping, environmental, industrial hygienist, fire protection, historic preservation and archaeological monitoring, surveying, space planner/interior designer, landscape architect or designer, construction manager/inspector, USGBC LEED accredited professional, and other disciplines with specialized experience. SELECTION CRITERIA; FAR 36.602-1(a): Failure of a firm to address its specified qualifications will result in the incontrovertible determination that the submittal is non-compliant with the submission requirements. Firms will be evaluated on the following factors and A&E selection criterion, included in descending order of importance: (1) PROFESSIONAL QUALIFICATIONS necessary for satisfactory performance of required services. Address professional qualifications by education, training, registration, certifications, overall and relevant documented specialized experience of key individuals in the discipline of Architecture; Mechanical; Civil; Electrical; Structural; and Interior Design. (2) SPECIALIZED EXPERIENCE and technical competence in the type of work described in CONTRACT INFORMATION, DUTIES, including experience in energy-efficient products and services, products and services that utilize renewable energy technologies, waste reduction, environmentally preferable products and services and use of recovered/recycled materials (3) CAPABILITY TO ACCOMPLISH the work in the required time. Discuss ability to meet the potential of working on multiple task orders at one time. Address your ability to sustain the loss of key personnel yet accomplish the work within required times. Address your management approach, organizational flow chart showing the inter-relationship of management and various team components, management and coordination of disciplines and subcontractors, and quality control procedures. Address capability to furnish drawings in CADD format; text documents in Microsoft Office format; and specifications as an Adobe Acrobat PDF file. (4) PAST PERFORMANCE on contracts with government agencies and private industry in terms of cost control, quality of work and compliance with performance schedules. List but do not submit more than five (5) actual copies of recent awards, commendations or other superior performance indicators. (5) LOCATION in the general geographical area of the projects and knowledge of the locality of the project areas within the State of Montana. All contract work is to be performed within the State of Montana. Address specific knowledge of Montana topography and soil conditions, and weather conditions and knowledge of State of Montana local building codes and practices. (6) VOLUME OF WORK performed in the previous 12 months under contracts awarded by DOD. SUBMISSION REQUIREMENTS: THIS IS NOT A REQUEST FOR PROPOSALS. Interested Architect-Engineer firms having the capabilities to perform the anticipated work are invited to submit three (3) completed and bound paper copy of their SF 330 (Parts 1 and II) (Architect-Engineer Qualifications). Additionally, firms may submit the data on CD/DVD but the CD/DVD shall not substitute for the hard copy submission. Submitting firms are to include the DUNS number along with the name of the firm in Block 5 of the SF 330, Part 1, Section B. FONT SIZE shall be at least 10 pitch or larger on white letter-sized paper (8-1/2 inches by 11 inches), limited to 20 double-sided sheets, stapled, fastened or bound. Do not furnish design portfolios, prints, magazines, newspaper clipping and/or CDs of completed projects. All requirements of this notice must be met for a firm to be considered responsive. Solicitation packages will not be provided. Qualification submissions must be received no later than 3:00:00 p.m., Mountain Standard Time, on May 1, 2015. Submission may be hand-carried to the USPFO for MT Purchasing and Contracting Office, 1956 Mt Majo Street, Fort Harrison, MT 59636-4789 or mailed to Montana Army National Guard, ATTN: MAJ Chris Lende, USPFO for MT Purchasing and Contracting Office, 1956 Mt Majo Street, Fort Harrison, MT 59636-4789. Facsimile transmissions will not be accepted. Late proposal rules in FAR 15.208 will be followed for submissions received after 3:00:00 p.m. Mountain Standard Time on the closing date specified in this announcement. No other general notification to firms under consideration for this project will be made. All information relating to this synopsis, including pertinent changes/amendments and information prior to the date set for receipt of AE Qualification Submission will be posted on the following website: https://www.fbo.gov . Cover letters and extraneous materials ARE NOT desired and WILL NOT be considered by the selection boards. Personal visits, for the purpose of discussing this announcement or the Submittal, will not be allowed. To be eligible for contract award, a firm must be registered System for Award Management (SAM). Interested offerors must be registered in SAM. To register go to: https://www.sam.gov/portal/public/SAM/. You will need your DUNS number register. Instructions for registering are on the web page. Firms should be registered well in advance of the closing date for submission of the SF 330 as the process may take 3 - 5 days. Synopsis Amendment 1 Question 1. Under submission requirements it currently states, quote mark limited to 20 double-sided sheets, stapled, fastened or bound. quote mark Can this be increased? Answer 1. Has been changed to quote mark limited to 50 double-sided sheets, stapled, fastened or bound. quote mark Question 2. Selection Criteria part (6) states quote mark VOLUME OF WORK performed in the previous 12 months under contracts awarded by DOD. quote mark Is that the volume of the Prime Contractor or the Subcontractors as well? Answer 2. The requirement is for the volume of the Prime contractor's DoD contract work in the past 12 months. Question 3. Do we need to include quote mark part II quote mark pages for each of our subcontractors? Answer 3. Yes, part II needs to be included for the subcontractors.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS