Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on October 4, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C--Renovate SICU

Awarded
VA25610RP0310Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Road Asset Management
Solicitation # FY27-ENGCP-002-6
The Bulloch County Board of Commissioners is soliciting Statements of Qualifications for project FY27-ENGCP-002-6, focused on Road Asset Management. The selected consultant will be responsible for collecting and analyzing field data, creating a road asset inventory, and developing a Capital Improvement Plan with an outlook extending to FY 35. The scope includes GIS database development, web-based mapping, and the identification of structural hazards and drainage failures to minimize safety risks and legal liability. All prime and sub-consultants must be GDOT Prequalified Contractors as of the submission deadline on November 20, 2026, at 3:00 PM EDT. Proposals are evaluated based on a composite scoring system that weights prime consultant experience and technical approach at 20% each, GIS capabilities at 20%, asset prioritization methodology at 15%, workload capacity at 15%, and past references at 10%. The highest-ranked consultant will be invited to negotiate a contract. Key requirements include a Principal-in-Charge with at least 10 years of industry experience and comprehensive insurance coverage, including professional malpractice and general liability of at least 1 million dollars per occurrence. Submissions are limited to ten pages, excluding mandatory forms and charts, and must include a Non-Collusion Affidavit and Bidder Declaration. Either party may terminate the resulting agreement with 30 days written notice.
Bulloch County Board of Commissioners

POSTED

about 6 hours ago

DEADLINE

in 22 days
NAICS: 541330
New
International
CoT RFP Event Q30-01-2026-27
Solicitation # Q30-01-2026-27
The City of Tshwane is soliciting a service provider for professional engineering services to support town planning subdivision application processes on city-owned properties. The scope of work is divided into three primary categories: Civil Services Reports, Geotechnical Investigations, and Route Determination Reports. All services must be led by a Professional Engineer registered with the Engineering Council of South Africa and must comply with the Gauteng Transport Infrastructure Act, National Building Regulations SANS 10400, and various SANS and SANRAL standards. The project follows a strict timeline, requiring an inception meeting within one month, draft reports within three months, final reports within five months, and project close-out within six months of appointment. The solicitation, numbered Q30-01-2026-27, closes on November 12, 2026, at 10:00. Awards are based on an 80/20 preferential point system in accordance with the Preferential Procurement Policy Framework Act and 2022 Regulations, with specific goals including points for women-owned, youth-owned, and disability-owned enterprises, as well as local economic participation. Evaluation occurs in four stages, starting with administrative responsiveness and a functionality score of at least 70 out of 100. Successful bidders must enter into a Service Level Agreement, with payment terms set at 30 days following the receipt of an invoice. Required submission documents include company registration, tax clearance or a CSD unique pin, and B-BBEE certification.
City of Tshwane

POSTED

about 9 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

This contract outlines the architectural and engineering services required to renovate approximately 6,070 square feet of the Surgical Intensive Care Unit at the G.V. Sonny Montgomery VA Medical Center. The project focuses on improving patient room access, nursing sightlines, lighting, and finishes, while replacing headwall units, plumbing fixtures, and entrances. The selected firm must provide complete drawings, specifications, and cost estimates, ensuring compliance with VA Space Planning Criteria and all applicable local, state, and federal codes. Key technical requirements include a third-party licensed fire protection engineer review and complete system commissioning for mechanical changes. The project follows a strict submittal schedule consisting of 25 percent, 75 percent, 100 percent, and final reviews, with the final submission due 215 days after the contract award. All drawings must be dimensioned in both English and Metric units. Beyond the design phase, the firm is responsible for construction period services, including reviewing material submittals, attending pre-bid and pre-construction meetings, and conducting at least twelve site inspections. The VA will provide as-built drawings and master construction specifications to assist the firm in completing the project.

General Info

Agency

N/A

Contract Value

$167,389.83

NAICS

541330 - Engineering Services

Place of Performance

MS, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

3 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline changed from Aug 3, 2010 to Jun 30, 2010. The notice description changed.

Notice updated

Response deadline changed from Jun 30, 2010 to Aug 3, 2010. The notice description changed.

Notice updated

Response deadline changed from Aug 3, 2010 to Jul 22, 2010. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
REQUIREMENTS FOR A/E SERVICES FOR DESIGN OF PROJECT 586-08-110 RENOVATE SICU CONTENTS I. General Scope II. Time Schedules, Reviews and Submittal Requirements A. 25% Review B. 75% Review C. 100% Review D. Final Submission III. Construction Period Service Requirements IV. Materials Furnished A/E by VA REQUIREMENTS FOR A/E SERVICES FOR DESIGN OF PROJECT 586-08-110 RENOVATE SICU GENERAL SCOPE: The A/E shall provide all architectural and engineering services as defined herein to accomplish complete drawings, specifications, and cost estimates for the following work: A. This project will renovate approximately 6,070 square feet of the existing Surgical Intensive Care Unit (SICU) located in the basement of building 1 at the G.V. (Sonny) Montgomery VA Medical Center. The existing area has limited access to patient rooms, poor lines of sight from nursing areas, dated finishes and inadequate lighting. In addition to improvements to the patient beds layout, the project proposes to replace narrow hollow metal doors/frames with break-away store front entrances, dated headwall units, plumbing fixtures, lighting, finishes and central nurses' area. The proposed design shall apply standards from VA Space Planning Criteria, Chapter 102: Intensive Care Nursing Units to the extent practical based on existing conditions and budget considerations. This information may be found via internet at http://www.cfm.va.gov/til/space.asp. B. The contract documents will include all disciplines associated with the renovation of the project. It is expected that existing mechanical infrastructure will be adequate for use in serving the newly renovated areas. Electrical infrastructure will require review to determine needs for upgrades/upsizing. All Branch services will be provided new as appropriate based on new layouts. C. A third party licensed Fire Protection engineer to be obtained by A/E for documented review of all contract documents. Results to be provided to VA for review. D. Based on mechanical system changes, the A/E shall provide for complete system commissioning. TIME SCHEDULE, REVIEW, AND SUBMITTAL REQUIREMENTS: The following specifies the documents / materials to be submitted by the A/E to the project manager for each scheduled review and due dates for the submission. Dates indicated must be strictly adhered to. In addition, all drawings shall be dimensioned in both English and Metric units. A. 25% Review - Four (4) sets of documents due forty-five (45) days after award of contract. 1. Drawings: The drawings will be complete, at least to the extent that the following are shown on the documents: a. General requirements: (1) Verification and recommendations resulting from site visits of existing conditions in all disciplines. (2) Demolition requirements. (3) Sizes of pipe, ducts, wiring, etc., are not required at the review. (4) Some details are required at this review. (5) All drawings shall not be less than 1/8" scale. (6) Several meetings between the A/E and the VA may be required to determine room sizes and layout for 25% submission. (7) Project shall meet all local, state, and Federal Code requirements, such as NFPA, NEC, ASHRAE, etc. b. Architectural: (1) Submit a 1/8 " scale layout of the floor plans. These drawings will show all affected rooms, doors, corridors, exits, electrical and mechanical rooms, stairs, and elevators. (2) Indicate the net area contained in existing renovated areas. (3) Submit a title sheet with drawing index. c. Structural: (1) A/E will indicate if any structural conditions exist with this project. (2) If present, show location of structural conditions. (3) Show location of expansion joints. d. Air Conditioning: Provide a written description and indicate on the drawing the required changes for this project. e. Heating: Provide a written description and indicate on the drawings the changes for this project. f. Plumbing and Sanitary: Provide a written description of verification of existing conditions and description of proposed system. g. Electrical: (1) Submit a preliminary basis for design, including a written description of electrical work required for this project. (2) Request to VA for special receptacles; telephone and computer outlets will be required at this time. h. Environmental: Asbestos is not anticipated on this project. 2. Develop a preliminary cost estimate based on preliminary design. Use VA Form 6238. 3. The requirements listed above will be reviewed by the VA Project Team and affected staff. All comments and recommendations will be returned to the A/E within ten (10) days. B. 75% Review: Four (4) sets of contract documents are required one hundred thirty-five (135) days after award of contract. 1. Drawings: The drawings will be complete at least to the extent that the following are shown: a. General Requirements: (1) All drawings developed from the previous review shall be detailed, showing pipe, duct, and wiring sizes, as well as all other required construction details. (2) All previous review comments shall be evaluated and incorporated into the drawings, specifications, and estimates. (3) All areas of construction shall clearly differentiate between existing and new construction (separate drawings for demolition and renovation). Emphasis shall be placed on contract accomplishments of unforeseeable or hidden conditions, including miscellaneous job requirements such as relocating pipe, vent, or other affected items. b. Architectural: (1) Submit complete floor plans, details, schedules, and large scale plans. (2) Show room titles, numbers, door sizes, types, and swing on floor plans. (3) Show general notes. (4) Indicate all fire partitions, smoke partitions, and safety and protective elements. (5) Show reflective ceiling plans, indicating all ceiling mounted equipment, air diffusers, registers, existing and relocated sprinkler heads, etc. c. HVAC (1) Duct and pipe sizing computations shall be 95% complete. (2) Duct layout, piping systems, and 95% complete layout of heating, air conditioning, and ventilation should be shown. Locate all fire and smoke dampers. (3) Show control diagrams. Include on the diagrams, where applicable, air conditioned systems, exhaust air systems, and the heating system. Diagrams shall be complete with legend and description of operations. (4) Major details, elevations, sections, and legends on the drawing are to be complete. Show each section of each critical point in corridors, indicating the location and space allocation intended for all ducts, piping, and large conduits. Show typical sections. d. Plumbing: All plumbing piping, fittings, fixtures, etc., should be shown. e. Electrical: (1) Floor plans shall have room titles and area function shown on this review set of drawings. Location of lighting system, outlets, power, and signal systems shall be shown. (2) Typical lighting calculations shall be given. (3) Show locations of new or existing panel boxes and indicate available, as well as additional, power requirements. 2. Specifications: Provide a full set of assembled edited project specifications in CSI format. 3. Cost Estimate: Submit a revised cost estimate and ensure the following minimum items are included on the VA Form 6238. a. All estimates shall be based on the most current working drawings available and shall be current as of the date of the submission. b. Price material at the contractor's buying level. Sales taxes, when applicable, will be added into material buying cost. c. Cost totals should reflect labor and materials separately and should be formatted as follows: (1) Totals - Labor and materials for all branches of work. (2) Mobilization cost of contractor. (3) Prime contractor's labor and supervisor. (4) Contingencies, Overhead, Profit, and Escalation (COPE) at 35%. (5) Bonds - Contractor bond cost. (6) Total cost estimate. 4. The above will be reviewed by the project team and staff, and returned to the A/E within ten (10) calendar days. C. 100% Review: Four (4) sets of contract documents are required two hundred (200) days after award of contract. 1. Submission Requirements: a. The plans and specifications shall be complete, in accordance with the previous review requirements, with all review comments accounted for and ready for use as final contract documents. b. The specifications will be in final format, including front end documents provided by the Contracting Officer. c. The final cost estimate shall reflect all previous comments and shall show each branch of work based on quantitative take-off of designed labor and materials. This will also be the final cost estimate and should be labeled as such. Use VA Form 6238. 2. The above will be reviewed by the project team and staff and returned to the A/E within five (5) calendar days. D. Final Submission: Due two hundred fifteen (215) days after award of contract. After completion of all the 100% review comments and coordination, the final contract documents shall be prepared and shall include the following: 1. One (1) complete set of contract drawings. Specifications will be reproduced by the VA, but the A/E will provide one (1) complete set of specifications. NOTE: mylars are to be signed by appropriate VA personnel before copies of contract drawings are provided. 2. A complete set of CADD drawings on CD. These CADD files shall be in AutoCAD 2008 and capable of being transferred into an Intergraph Microstation environment. 3. A complete set of reproducible mylars of all contract drawings. 4. Final cost estimate based on revisions made at the 100% review. 5. A final set of technical support data. 6. Six (6) sets of half size drawings. 7. Provide a checklist of all submittals, certifications, tests, and inspections required per drawing and specification section. Checklist shall be produced on Microsoft EXCEL and shall be delivered hard copy and electronic. CONSTRUCTION PERIOD SERVICE REQUIREMENTS: A. Review of and approval or disapproval of material submittals, shop drawings, and test reports. B. Review and recommendations of change orders and cost analysis. C. Site Visits: 1. Pre-bid conference to be attended by the A/E. 2. Pre-construction meeting to be attended by A/E. 3. Minimum of twelve (12) site inspections when requested by the VA Resident Engineer. 4. Partial and final inspections to be attended by the A/E. D. A/E will be available during the period of construction to answer or verify questions and / or problems relating to the contract documents as they relate to field conditions. MATERIALS FURNISHED TO THE A/E BY VA: A. Station as-built drawings (originals to be retained by the VA). The accuracy of these drawings must be field verified by the A/E. B. One each unedited copy of the applicable sections of the VA master construction specifications, including front-end documents. C. Guidelines for identifying the working drawings. D. VA design manuals, standard details, and construction standards. ---END---

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS