Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 25, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C0700 - FOCP Coyote Creek Flood Protection Project (Pre-Qualification)

Closed
VW0290State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Yucca Trail Widening Project – Palomar Avenue To La Contenta Road
Solicitation # 7074
The Town of Yucca Valley is soliciting professional civil engineering design services for the Yucca Trail Widening Project, located between Palomar/Avalon Avenue and La Contenta Road in Yucca Valley, California. The selected contractor will be responsible for creating a comprehensive Plans, Specifications, and Engineer's Estimates package, which includes street improvement, signing, striping, and streetlight plans, as well as final cost estimates and record drawings. The scope requires the consultant to evaluate the project for safety, constructability, utility conflicts, right-of-way constraints, and ADA compliance, utilizing the latest version of AutoCAD and adhering to the Standard Specifications for Public Works Construction and Town driveway standards. The agreement is for an initial term of two years, with a possible two-year extension upon mutual consent. Proposals must be submitted in two separate sealed envelopes by December 3, 2026, with the technical proposal limited to ten pages. Evaluation criteria include the service approach, company qualifications, past performance, proximity of the contractor's office, and the ability to commence work immediately. Compensation will be negotiated after the contractor is selected, and the Town aims to process undisputed monthly invoices within forty-five days. While the contractor must provide worker's compensation and indemnity insurance, it is noted that California prevailing wage laws do not apply to this specific agreement.
Town of Yucca Valley

POSTED

about 6 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract pertains to the Coyote Creek Flood Protection Project (CCFPP) in California, which is a response to a FERC order issued on February 20, 2020, aimed at enhancing dam safety and reducing flood risks associated with Anderson Dam. Valley Water is executing two interconnected projects: the Coyote Creek Flood Management Measures Project (CCFMMP, Project A), which involves constructing flood risk-reduction elements in areas previously flooded during the 2017 event, and the Coyote Creek Flood Protection Project (CCFPP, Project B), designed to further strengthen flood defenses to handle flood levels comparable to the 2017 20-year flood event. The current prequalification process is specifically for the CCFPP, with a contract value estimated between 50 million and 150 million dollars. The project’s goal is to mitigate flood risks in urbanized San Jose areas, thereby safeguarding public health and safety by implementing critical flood control infrastructure. The solicitation was posted on July 25, 2024, with a response deadline of October 9, 2024, and is managed by the Santa Clara Valley Water District, with primary contact being Huggen Angeles.

General Info

Documents

1

Prequalification Application for Coyote Creek Flood Protection Project C0700

PDF, High priority: read this firstprequalification-application
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Clara Valley Water District
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The Federal Energy Regulatory Commission (FERC) has jurisdiction over Anderson Dam and its associated safety measures. Pursuant to FERC’s authority, for public health and safety reasons, on February 20, 2020, Valley Water received an Order from FERC to reduce risks to public safety by implementing risk reduction measures for dam operation and design. Valley Water is implementing the Coyote Creek Flood Management Measures Project (CCFMMP, Project A) in response to the FERC Order. The flood risk-reduction elements constructed as part of Project A currently in construction will reduce the risk of flooding in urbanized areas of San Jose resulting from the water releases from Anderson Dam subsequent to completion of the Anderson Dam Tunnel Project (ADTP). The flood risk-reduction elements constructed as part of Project A are located in areas flooded during the 20-year flood event that occurred in 2017. Valley Water is also implementing the Coyote Creek Flood Protection Project (CCFPP, Project B) to construct the remaining Coyote Creek flood protection elements within the same geographic area necessary to reduce floods up to the level that occurred on February 21, 2017, equivalent to approximately a 20-year flood event. This project prequalification application is for the CCFPP project.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS