Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Veterans Affairs was posted on May 9, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C1DA--596-24-1-5895-0001 - 596A4-24-101 - A/E Replace Main Electrical Distribution Equipment, Bowling

Closed
36C24924R0011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

541330 - Engineering Services

Place of Performance

Lexington VAHCS, Bowling Campus 1101 Veterans Dr, Lexington, KY, 50502, USA

Set-Aside

SDVOSBC

Documents

1

36C24924R0011 - A/E Replace Main Electrical Distribution Equipment, Bowling

DOCX, High priority: read this first6 pages · rfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 249-NETWORK Contract Office 9 (36C249)
Contacts1 person available
OfficeMURFREESBORO, TN, 37129, USA
Office AddressMURFREESBORO, TN, 37129, USA
Contacts
Jeffery A RidenourContract Officer

Full Description

Show more
REQUEST FOR SF330 1. INTRODUCTION: THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE in accordance with Public Law 109-461. This is a Request for SF330s for Architect/Engineer (A/E) Design Services for Project Number 596A4-24-101, Replace Main Electrical Distribution, Bowling Campus at the Lexington VAMC, 1101 Veterans Dr, Lexington, KY 40502. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. NO SOLICITATION PACKAGE WILL BE ISSUED via SAM.gov. A request for proposal will be issued directly to the most preferred firm for which negotiations will commence in accordance with FAR Subpart 36.6. The anticipated A/E design services, to be awarded, will be procured in accordance with the Selection of Architects and Engineers Act (Public Law 92- 582), Federal Acquisition Regulation Subpart 36.6, and VA Acquisition Regulation Subpart 836.6. 2. DESCRIPTION: The Lexington VA has obsolete electrical infrastructure in need of replacement and redesign. Four oil filled aluminum winding transformers need replaced and their associated disconnects. Four transfer switches (2 Zenith and 2 Asco) need replaced because of age, wear, and parts availability. The main building generator set needs replaced and possibly relocated to meet design guide requirements. The emergency switchboards and generator panelboard located in the same location as the genset need replacement due to age and weathering from the humid conditions of the space. The main 12470 VAC switchgear needs upgraded to solid state relaying and preferably provided with remote racking capability. The new switchgear and feeder circuitry need assessed by a qualified design firm to determine a design that can safely automatically transfer between the utility supply feeds #119 and #136. The 12470 VAC GE Magna-blast main breakers in the Tower Building are incapable of being racked in and out and need replacement. The Network protector devices in the Tower Building need replaced to ensure safe operation and prevent potential back-feeds to circuit s #119 and #136. The 480 Siemens Type R 480 VAC switchgear in the main building has had recent breaker closing and tripping mechanism failures. Similar switchgear is providing power to two chillers in building #4. SCOPE OF WORK: A-E Part One Services: (also known as Design Phase Services) for this design project include site visits, field investigation, studies, and user interviews to prepare drawings, specifications, and owner narratives for each submission, as well as hire an independent third party cost estimator for all facets of work and disciplines/trades to facilitate a construction project to upgrade the facilities main electrical infrastructure. This infrastructure upgrade will correct FCA deficiencies: 194721, 407347, 288233, 195849, 490041, 49915, and 49941. The project shall include schematic design, design development, construction/bid documents per A/E design submission instructions documents, construction period design services, technical specification and cost estimates, a detailed phasing and scheduling plan, temporary power plans for a 24/7 hospital, and commissioning services to facilitate the replacement and upgrade of the following equipment: Caterpillar 825 KVA Generator (Main Building) Replace 3 Emergency Switchboards ESB (1,2,4) Siemens ITE switchboard (Main Building) Replace 2500 KVA Transformers T-7 and T-8 and associated disconnects (Building 4 Chiller Plant) Replace 1500 KVA Transformers T-5 and T-6 and associated disconnects (Main Building) Replace Siemens Type R Switchgear (Main Building 1A, LV #1) Replace Siemens Type R Switchgear (SWB Main #1, Building 4 Chiller Plant) Replace GE Magna-blast Switchgear (Tower MV) Replace Network Protectors fed from Transformers T-1, T-2, T-3, and T-4 (Tower Building) Access and replace if warranted 15 KV 1-1/C 50 kcmil cabling from KU substation to Main Building MV. Replace Main Building Siemens Allis 15KV 1200 Amp switchgear. Incorporate Advanced Metering already installed into existing low voltage equipment into new equipment and add additional metering to medium voltage equipment capable of communicating to BACNet Building Automation System. A-E Part Two Services: (also known as Construction Period Services) for this design project include responding to construction contractor Requests For Information (RFIs) during the solicitation (solicitation support) and construction phases of the construction project; attendance at pre-bid, post-award, and commissioning kick off construction project conferences; review of construction material submittals and shop drawings; approximately 4 site visits per month during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications; preparation of site visit reports to be submitted within 72 hours of visit; coordination with project commissioning requirements (see Third-Party Commissioning under section 15); review of any construction project modifications for cost and technical acceptability; attendance and participation during the final acceptance inspection; preparation of the punch list; and preparation of record drawings of the completed construction project based on the construction contractor s as-built drawings. The A-E shall prepare a submittal log to be utilized by the VA during construction period services, maintain RFI log, and provide meeting minutes for weekly construction meetings throughout the duration of construction. The A-E Period of Performance: 365 calendar days Contract Type: Firm-Fixed-Price Estimated Magnitude of Construction: between $5,000.000.00 and $10,000,000.00 NAICS Code: 541330 Size Standard: $25.5 Million 3. VETCERT & SAM: in accordance with VAAR 819.7003, at the time of SF330 submission and prior to award of any contract, the offeror must represent to the contracting officer that it is a: SDVOSB eligible firm; Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and SDVOSB listed as verified in VETCERT at: https://veterans.certify.sba.gov/. Additionally, all eligible firms must be registered and current in the System for Award Management (SAM) database in order to be evaluated and eligible for contract award. If the firm is not registered in SAM, you may register online at https://www.sam.gov. 4. EVALUATION FACTORS: selection criteria will be based on the following factors, in descending order of importance, in accordance with FAR 36.602-1: Professional qualifications necessary for satisfactory performance of required services; Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials; Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team; Capacity to accomplish the work in the required time; Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules; Record of significant claims against the firm because of improper or incomplete architectural and engineering services; Reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness; and Location in the general geographical area of the project and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project. PLEASE NOTE: The AE Evaluation Board must be provided with complete and accurate information for ALL evaluation factors above in order to rank interested and eligible firms. Therefore, the AE firm must expand upon, as it deems necessary, on any evaluation factor not well demonstrated or addressed with Part 1A to Part IG and Part II of the SF330. The AE firm shall use Part IH and/or use additional sheets to supplement/address all evaluation factors to clearly demonstrate its qualifications. Additionally, keep in mind the submission requirement restrictions outlined in #7 below when addressing evaluation factors. 5. SELECTION PROCESS: in accordance with FAR 36.6, SF330s will be evaluated by the evaluation board using the evaluation factors identified in this announcement. After SF330s have been evaluated, discussions/interviews will be held with at least three of the most highly qualified firms. After discussions conclude, the evaluation board will evaluate the qualifications of the firms using the same evaluation factors, taking into consideration both the SF330 submission and subsequent discussions, to select the most preferred firm from the firms considered to be the most highly qualified. Please note that the assigned values for the above factors may be adjusted after discussions as allowed under FAR 36.602-1, Selection Criteria. Negotiations will then begin with the most preferred firm. 6. LIMITS ON SUBCONTRACTING: in accordance with FAR 52.219-14 Limitations on Subcontracting (e)(1), it states: Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract; 7. SUBMISSION REQUIREMENTS: interested and eligible firms should submit their current SF330 as follows: One (1) electronic pdf copy via email: 1. Size limitation is 20MB; The SF330s are due on November 14, 2023 at 12:00 CDT Acceptable electronic formats (software) for submission of SF330 packages: Files readable using the current Adobe Portable Document Format (PDF); Files in Adobe* PDF Files: When scanning documents scanner resolution should be set to 200 dots per inch, or greater; SF330s shall be provided on standard letter size 8-1/2 by 11-inch paper, limited to a maximum of seventy-five (75), single-sided, single-spaced, and numbered pages. If more than seventy-five (75) single-sided pages are submitted, all pages after seventy-five (75) pages will not be evaluated. The font for text shall be Times New Roman 12-point or larger; Please note that we can no longer accept .zip files due to increasing security concerns. The SF330 can be downloaded through the GSA Forms Library at: http://www.gsa.gov/portal/forms/type/TOP, type in SF330 in the Find a Form block and click on search. 8. No Fax or Email Responses will be accepted: Personal visits for discussing this announcement will not be entertained or scheduled. Questions may be directed only by e-mail to Contracting Officer Jeffery.ridenour@va.gov 9. VA Primary Point of Contact: - Jeffery A. Ridenour - Contracting Officer - Email: Jeffery.ridenour@va.gov

More opportunities from Department Of Veterans Affairs → 249-NETWORK Contract Office 9 (36C249)

Same awarding agency

NAICS: 238220
New
Federal
TVHS AC VRF System Installation
Solicitation # 36C24927Q0016
Solicitation 36C24927Q0016 is a request for a single-award, firm-fixed-price purchase order from the Department of Veterans Affairs to provide HVAC services at the Tennessee Valley Healthcare System Nashville Campus. The project involves the removal of an existing condenser and three air handling units and the installation of a new Variable Refrigerant Flow (VRF) system for five office spaces near the boiler office. The scope includes system start-up, testing, commissioning, and balancing of airflow and temperature control. The period of performance is scheduled from November 1, 2026, through December 31, 2026, with specific work hours designated for Friday through Sunday between 1800 and 2400 hours. This requirement is 100% set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 238220. Award decisions will be based on a Best Value comparative evaluation considering technical capability, past performance, and price. The contractor is required to adhere to industry standards, OSHA 29 CFR 1910, and NFPA 70E safety guidelines. Key deliverables include operational verification documentation, daily field inspection reports, and a final written report submitted within ten working days of completion. Invoices must be submitted electronically, and payments will be processed via Electronic Funds Transfer.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS