Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Veterans Affairs was posted on March 22, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C1DZ--502-21-1-5725-0001 - A/E Construction to replace roof

Awarded
36C25621R0031Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541310
New
SLED
Architect-Engineering Services for the FL 6th District Court of Appeal – New Courthouse
Solicitation # RFQ REDM2627-01
The Florida Department of Management Services, Division of Real Estate Development and Management, is soliciting Request for Qualifications RFQ REDM2627-01 for architectural and engineering services to design and construct the new State of Florida Sixth District Court of Appeal courthouse. Located on a 5.30-acre state-owned parcel at 4165 Lakeland Hills Boulevard in Lakeland, Florida, the project scope includes the development of an appellate courtroom, judicial chambers, staff offices, a Clerk's Office, a Marshal's Office, secured and public circulation, technology and security systems, and approximately 120 parking spaces. The project has an estimated construction budget of 53.5 million dollars, which excludes the compensation of the selected Architect-Engineer. The procurement utilizes a two-stage qualifications-based selection process in accordance with section 287.055, Florida Statutes. Stage one involves a preliminary screening based on the firm's proximity to the project, relevant design experience, and ability to perform contract delivery. Firms advancing to stage two will be evaluated through interviews and presentations focusing on past performance, understanding of program requirements, and approach and methodology. The anticipated contract start date is March 2, 2027. Respondents must be legally registered in Florida and authorized to practice architecture, engineering, and landscape architecture under applicable state statutes. Mandatory submission requirements include a letter of interest, a Professional Qualifications Supplement, a project listing of relevant experience, current Florida licenses, and a completed Federal GSA Standard Form 330. All responses must be submitted in Adobe PDF format on a thumb drive to the Procurement Liaison, who serves as the sole point of contact. Selected firms must adhere to strict confidentiality requirements regarding building plans under Florida Sunshine laws and comply with all state building codes and fire safety standards.
Department of Management Services

POSTED

about 15 hours ago

DEADLINE

in 5 months
NAICS: 541310
New
SLED
Hillcrest Center Project Architectural Tenant Improvement And Renovation Services
Solicitation # 20261019042
The Conejo Recreation & Park District is soliciting architectural services for the Hillcrest Center Improvement Project located at 401 West Hillcrest Drive in Thousand Oaks, California. The primary scope of work involves preparing interior tenant improvement and renovation documents to create a multipurpose room, a public event center, and a therapeutic recreation space, as well as renovating adjacent outdoor areas with new decks and patio seating. An alternative scope of work is also available for the conceptual master plan development of undeveloped portions of the 61-acre property, including pedestrian trails and shaded gathering spaces. The selected consultant will be responsible for design development, working construction drawings, and cost estimates, ensuring all work complies with federal, state, and local regulations and is coordinated with the City of Thousand Oaks. Proposals are due by December 10, 2026, and must include a master original and three copies, a non-collusion affidavit, and a certified list of at least three references from the last three years. Award will be based on the most advantageous proposal, evaluating factors such as the proposed approach, qualifications of key personnel, experience with similar projects, and cost reasonableness. The contract requires comprehensive insurance coverage, including professional errors and omissions, general liability of at least 2 million dollars per claimant, and property damage limits of 5 million dollars. Payments are processed on a monthly basis within 30 days of acceptance by the District. The consultant must provide proof of insurance within 10 days of the award as a precondition to contract execution.
Conejo Recreation & Park District

POSTED

1 day ago

DEADLINE

in about 2 months
NAICS: 541310
New
SLED
Community Center & Town Hall Architectural Services
Solicitation # 2140054
The Town of Volney is soliciting architectural services for the development of a new Community Center and Town Hall located at 1445 County Route 6, Fulton, New York. The project scope encompasses five primary phases: schematic design, design development, preparation of construction documents, bidding and award assistance, and construction administration through closeout. The selected firm will be responsible for coordinating all architectural, engineering, technology, security, and interior design services, providing final deliverables in electronic PDF and editable CAD or Revit formats. The estimated total project budget is approximately 5,850,000 dollars, funded by a 4,674,320 dollar NY BRICKS grant and Town reserves. The contract term is three years, with the possibility of two one-year extensions. The selection process is based on a qualifications-based evaluation where fees are not reviewed initially. Firms are evaluated on public work experience, experience with NYS BRICKS or other grant agencies, project team qualifications, approach, and references. Once the highest-ranked firm is identified, the Town will open the sealed fee proposal to negotiate the scope and schedule. Applicants must submit their qualifications and a separately sealed fee proposal, including a signed non-collusion certification, by 3:00 p.m. on November 12, 2026. Requirements include compliance with New York prevailing wage laws, specific general liability insurance coverage of 1,000,000 dollars per occurrence, and a commitment to equal opportunity and nondiscrimination, with encouraged participation from certified MWBE and SDVOB firms.
Town of Volney

POSTED

1 day ago

DEADLINE

in 22 days
NAICS: 541310
New
International
Design and Contract Administration Services for New Vaughan Animal Services Facility
Solicitation # RFP26-309
The City of Vaughan is soliciting proposals for a multi-disciplinary consulting team, led by an Architectural Prime Consultant, to provide design and contract administration services for a new Animal Services Facility. Located at the Maple Nature Reserve site (10401 Dufferin Street) within the Oak Ridges Moraine Conservation Plan, the project consists of a two-storey building between 25,000 and 30,000 square feet. The facility will include public reception and education spaces as well as a public-facing spay/neuter clinic, with an estimated construction budget of 40 million dollars. The project will be delivered using a design-bid-build approach under a stipulated sum form of contract, and the successful consultant must adhere to the City of Vaughan Inclusive Design Standards. The selection process utilizes a cumulative scoring system based on technical and financial evaluations. Technical scoring includes key personnel, firm experience, work plans, and sustainable objectives, with a minimum 75 percent score required in the initial technical stage to advance to a mandatory interview and presentation. Financial proposals will only be opened for proponents who are within five points of the highest-ranked technical proponent. The resulting agreement will be based on the RAIC Canadian Standard Form of Contract for Architectural Services, Document Six, 2018 Edition. All submissions must be made electronically via the City's online bidding system by the deadline of November 18, 2026.
City of Vaughan

POSTED

1 day ago

DEADLINE

in 29 days

AI Contract Overview

Show more

Contract 36C25621R0031 is a negotiated firm-fixed-price agreement awarded to Ballard CLC, Inc. for architectural and engineering services to replace the roof and gutters of Building 2 at the Alexandria VA Health Care System in Louisiana. The project involves the removal of existing flat and clay tile roofing, the salvage and reuse of undamaged tiles, and the installation of TPO roofing on flat sections and copper gutters and flashing per State Historic Preservation Officer guidelines. Because Building 2 is on the Historic Register, all work must comply with the National Historic Preservation Act. The total award amount is 248,856.52 dollars, with a construction magnitude estimated between 2,000,000 and 5,000,000 dollars. The scope of work includes complete site investigation, structural analysis, and the preparation of full construction documents through a phased design process consisting of 35, 65, 95, and 100 percent submissions. The selected firm is responsible for coordinating asbestos and hazardous material surveys, ensuring compliance with Life Safety Code and NFPA standards via a registered Fire Protection Engineer, and adhering to ADA and UFAS accessibility standards. The period of performance is 240 days from the notice to proceed. This procurement was a 100 percent set-aside for Service-Disabled Veteran-Owned Small Businesses under NAICS code 541310.

General Info

Contract Value

$248,856.52

NAICS

541310 - Architectural Services

Place of Performance

MS, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

1

Award Notice - 36C25621C0051 (Ballard CLC, Inc.)

DOCX, Low priority1 page · award
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 256-NETWORK Contract Office 16 (36C256)
Contacts1 person available
OfficeRIDGELAND, MS, 39157, USA
Office AddressRIDGELAND, MS, 39157, USA
Contacts
Gina L. RoachContracting Officer

Full Description

Show more
36C25621R0031 CONTRACT INFORMATION: General. A-E Services are being procured in accordance with the Selection of Architects and Engineers Statute (Public Law 92-582), formerly known as the Brooks Act, and implement in Federal Acquisition Regulation (FAR) 36.6. All submissions will be evaluated in accordance with the evaluation criteria. The Government will not pay, nor reimburse, any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. Firms will be selected based on demonstrated competence and qualifications for the required work. The NAICS Code for this acquisition is 541310 and the applicable Small Business Size Standard is $7.5M. Contract Award Procedure: The proposed A/E services will be obtained by a Negotiated Firm-Fixed Price Contract. Interested parties shall ensure current Licensing and have a current registration in the System for Award Management (SAM) database at https://www.sam.gov and the Vendor Information Pages database at http://www.va.gov/osdbu well as have submitted the current cycle VETS-4212 Report http://www.dol.gov/vets/programs/fcp/main.htm (for contracts in the amount of $150,000 or more). The SAM clause at FAR 52.204-7 changed effective (Oct 2018) and now requires that offerors be registered in the SAM database at the time an offer is submitted and at the time of contract award. According to FAR 52.204-7, registered means, among other things, that the record in SAM be marked as Active . Therefore, failure of a proposed SDVOSB to be registered at the time the SF 330 is submitted and at the time of contract award shall result in elimination from consideration as a proposed contractor. SDVOSB Requirements: In accordance with VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside, a service disabled veteran-owned small business concern agrees that, in the performance of the contract, at least 50 percent of the cost of personnel for contract performance will be spent for employees of the concern or employees of other service-disabled veteran-owned small business concerns. c. Design Costs: All offerors are advised that in accordance with VAAR 836.606-73 the total cost of the architect or engineer services contracted for must not exceed 6 percent of the estimated cost of the construction project plus any fees for related services and activities. Additionally, FAR 52.236-22 Design Within Funding Limitations, will be applicable to this procurement action. Design limitation costs will be provided to the most highly rated AE firm selected to complete the design. The magnitude for construction (not design) of this project is between $2,000,000 and $5,000,000. SELECTION CRITERIA: The selection criteria for this acquisition will be in accordance with FAR 36.602-1 and VAAM M836.602-1 and are listed below in descending order of importance. The completed SF 330 will be evaluated by the Alexandria Health Care System Evaluation Board in accordance with FAR 36.602-5(a) and the selection report shall serve as the final selection list, which will be provided directly to the Contracting Officer. Professional qualifications necessary for the satisfactory performance of required services; (FAR 36.602-1 (a)(1)) provide key personnel, it is expected that the individuals identified as key personnel will be performing tasks under the resulting contract. Include resumes for key personnel of proposed sub-consultants for all engineering disciplines: electrical, data communication, mechanical, civil, structural, environmental, interior design, LEED, commissioning and cost estimating. Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials; (FAR 36.602-1 (a)(2)) Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates (VAAM M836.602-1 (6)(ii)) Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules; (FAR 36.602-1 (a)(4)) be sure to include all past performance Department of Veterans' Affairs (include knowledge of VA design standards, technical manuals, and specifications)(provide no more than five (5) recent projects); Capacity to accomplish the work in the required time; maintaining project schedules and project budgets. Cost control effectiveness and estimating accuracy. (FAR 36.602-1 (a)(3)) Location in the general geographical area of the project and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project; (FAR 36.602-1 (a)(5)) The extent to which potential contractors identify and commit to the use of service-disabled Veteran-owned small businesses, Veteran-owned small businesses, and other types of small businesses as subcontractors. (VAAM M836.602-1 (6)(i)(A)) SUBMITTAL REQUIREMENT: This project is a 100% set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB) concerns under VAAR 852.219-10, VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside (Dec 2009). All original Standard Form (SF) 330 packages shall be submitted to: Alexandria VA Health Care System Network Contracting Office (NCO 16) ATTN: Gina Roach, CO 2495 Shreveport Highway, 71 Room 212A Pineville, LA 71360 (a) All SF 330 submissions shall be clearly marked with the subject line displaying the Solicitation Number 36C25621R0031. The SF 330 form may be downloaded from www.gsa.gov/forms. Completed SF 330 s shall include the primary firms, subcontractor firms, and any consultants expected to be used on the project. (b) Firms that meet the requirements listed in this announcement are invited to submit four (4) copies of the completed SF 330 including Parts I and II as described herein and one CD-ROM of the SF 330 submittal as a single pdf file, to the above address no later than 10:00 A.M. (CST) on Tuesday, DECEMBER 29, 2020. FAX AND/OR E-MAIL SUBMISSIONS WILL NOT BE ACCEPTED. Late proposal rules found in FAR 15.208 will be followed for late submittals. (c) Interested firms shall address each of the seven (7) Selection Criteria in their SF 330 s and additional documents/submittals. THIS IS NOT A REQUEST FOR PROPOSAL. THERE ARE NO SOLICITATION DOCUMENTS AVAILABLE. This is a request for SF 330 s Architect/Engineer Qualifications packages only. Any requests for a solicitation will not receive a response. This requirement is subject to Availability of Funds. PROJECT INFORMATION: A/E Design Scope of Work Replace Roof Building 2 Project #502-21-105 VA Health Care System Alexandria, LA 71360 Definition and Acronyms: Pre-Construction Risk Assessment (PCRA), Interim Life Safety Measures (ILSM), Request for Proposal (RFP), Certified Independent Third-Party Safety Professional (CITP) National Fire Protection Association (NFPA), The Joint Commission (TJC), Facilities Condition Assessment (FCA). Competent Person (CP), Contracting Officer s Representative (COR),Central Energy Plant (CEP) GENERAL REQUIREMENTS: The Architectural/Engineering Consultant (A/E) shall provide all architectural and engineering services necessary to prepare complete contract documents consisting of specifications, drawings, and any other documents for bidding purpose and A/E construction period services for preparation of construction documents, cost estimates and other items as indicated to accomplish the replacement of the roof and gutters for Building 2. AE must consider that the replacement of the roof and gutters may result in revisions to supporting structural components. Work shall include, but is not limited to, the above detailed requirements which are to be considered a basic part/minimum requirement of this project and shall be fully developed by the A/E, discussed and resolved with Alexandria VA Health Care System staff. The A/E shall schedule and conduct an initial pre-design meeting and field visit with the VA personnel consisting of: Engineering personnel, Safety Officer and other VA personnel as necessary. The purpose of this meeting/field visit is for all parties involved to fully define and understand the Scope of Work necessary for the A/E to design and prepare contract documents consisting of plans and VA specifications for the replacement of the building 2 roof and gutters. At least two additional site visits are necessary during the design phase. The existing roof will be removed in its entirety. The roof has 3 large sections: two flat roof sections and one clay tile section. Existing clay tile that is undamaged will be salvaged for reuse both from the roof and the sides of the dormers. The gutters will be replaced and downspouts added where necessary connecting to the existing rainwater collection system. New windows/louvers will be added to the dormers as needed. The corridors to building one (1) will be reroofed as part of this project The corridors to building three (3) will not be included in this project. The A/E shall perform any other necessary investigative work, i.e, meet with or communicate with VA staff regarding design layout. The design and resulting construction must, as a minimum, be in accordance with all applicable codes, (NFPA, JCAHO, NEC, UPC, UMC, ASME, ASHRAE, EPA), Controlled Environment Testing Association (CETA) and Department of Veterans Affairs (VA) publications, Master Construction Specifications, Construction Standards, Design Guides and Standards. All design and work will conform to the current edition of the VA Master Specifications and VA Design Standards as published at the following site: www.cfm.va.gov; ASME, ASHRAE, OSHA, IBC 2009, IPC 2009, IMC 2009, NFPA, ABA, ABAAS, ADAAG and NEC building codes and standards. Building 2 is on the Historic Register. All considerations must be given to the impact design will have on the historic structure. All work must be done in accordance with the National Historic Preservation Act. The Louisiana State Historic Preservation Officer (LA SHPO) is to be consulted to ensure compliance with the Act. Survey report will be generated 2 weeks after NTP. INVESTIGATIVE WORK: The A/E, with the aid of VA staff is to perform all necessary testing and investigative work required to adequately design the project. Utilizing as-built drawings provided by the VA and design staff site visits, the A/E will investigate scope of required new construction. The A/E shall develop, execute and demonstrate that the project plans and specifications have gone through a rigorous review and coordination effort. The A/E shall provide an outline of the actions that the firm will take during the design process to ensure a quality finished design is achieved. DESIGN CONSIDERATION: Design shall include, but is not limited to, the following: VA specification guidelines. Construction drawings Construction cost estimate ASHREA design considerations Other necessary design considerations. Historic preservation considerations. DESIGN Requirements: The Architectural/Engineering Consultant (A/E) shall provide all Architectural and Engineering Services necessary to prepare complete contract documents consisting of specifications, drawings, and any other documents for bidding purposes and A/E construction period services to include but not limited to the following: Replace the building 2 roof and gutters at VAMC, Alexandria, La. The project includes general re-design and removal of existing roof and gutters. Tiles will be salvaged and reused where possible on the clay tile roofing areas The roof has three main areas and a connector between buildings that will be re-roofed. These include the clay tile portion and two flat portions (one south and one north). Please see attached drawing. All drains inside from roof to floor. Reseal any penetrations or cracks Expansion joints, seals, leaks, abuttment joints, etc. Any points for water infiltration Gutters/flashing to be copper per SHPO guidelines Flashing replacement, decking, water and ice shields, etc. Survey report 2 weeks after NTP Flat roof areas will be replaced with TPO roofing All work must adhere to SHPO guidelines Bldg 2 was built in 1929, and has approximately 59,000 gross Sq. Ft. The design will include removal of the existing roof, replacement of roofing materials and of the roof shingles. Currently there are terracotta clay roofing tiles. Replacement with anything other than clay tiles will require the approval of SHPO. SHPO must be notified prior to any work. This is an occupied office and medical building; this project will require phasing the construction to minimize the disruptions to the VA Medical Center. The A/E will evaluate the entire project and make recommendations how to phase the roof replacement. This contract will provide for complete site investigation, design (construction documents), construction period services (CPS) and construction site visits. A/E will identify the construction time periods for shutdowns and lengths on the phasing drawings. Also, identify construction that will be required to occur outside of normal operational hours (Monday -Friday, 8:00 a.m.-4:30 p.m.). Schedule and conduct an initial pre-design meeting and field visit with the VA personnel consisting of: Engineering personnel, Safety Officer, Maintenance and Operations, and other VA personnel as necessary. The purpose of this meeting/field visit is for all parties involved to fully define and understand the Scope of Work necessary for the A/E to design and prepare contract documents consisting of plans and VA specifications to replace the building 2 roof. Design for roof replacement shall include a structural analysis of the existing structural components that will support the new roof. PERIOD OF PERFORMANCE The delivery date for this contract shall be 240 days from Notice to Proceed. QUALITY ASSURANCE/QUALITY CONTROL (QA/QC) The Design Offeror or A/E shall develop, execute and demonstrate that the project plans and specifications have gone through a rigorous review and coordination effort. The A/E shall provide an outline of the actions that the firm will take during the design process to ensure a quality finished design is achieved. COST ESTIMATE A detailed estimate of construction cost (using RS Means, Cost Works) and Market Study/Survey shall be provided with each design submission. DRAWINGS This project will utilize AutoCad, version 2019. All VA design guides and requirements can be found online at: http://www.cfm.va.gov/TIL/. Where conflicts occur between VA standards and model codes, the most stringent requirement shall govern. All drawings must be bundled using the e-transmit function. UTILITY SURVEY During the design phase, the A/E will coordinate with VA Staff to obtain utility information to facilitate the design. Otherwise, what is not obtained shall be surveyed to extent necessary by the A/E. A/E shall procure any services (to include, but not limited to any applicable utilities for Building 2 roof replace) required to adequately test and determine the capacity of the existing utility system. ASBESTOS The A/E shall investigate the construction site to verify any asbestos containing materials. If asbestos is encountered, it is the A/E and their subcontractor s responsibility to adhere to all VA, OSHA, Federal, and State regulations of ACM procedures. Submittal packages for the Asbestos & Indoor Air Quality (IAQ) qualifications shall be provided to the VA. The Industrial Hygienist (IH) shall perform duties as necessary by monitoring, inspecting and testing inside / outside the work area in accordance with OSHA requirements. Asbestos survey for this building is available upon request but may not be fully inclusive. Note: Some site investigation work may be in asbestos contaminated areas, and will require the A/E to have their personnel trained for Class 3 Asbestos Work (Maintenance & Operations within Asbestos Contaminated areas). SCHEMATIC DESIGN Investigate and survey project site. Verify any VA provided data. AE is responsible for collecting all data required for the design. The A/E is responsible for measuring and collecting actual field data that may be required. This schematic design phase is an iterative process and requires close coordination with the VA staff. The preliminary schematic design/layout will most likely require tweaking until a final plan/layout is officially approved by the hospital. Dimensions, slopes, etc will need to be indicated on the drawings. AE shall work with the VA staff until an acceptable PROJECT SPECIFIC plan has been developed and approved in writing by the VA. ASBESTOS ABATEMENT SURVEY During the design phase, the A/E will coordinate with VA Staff to perform an asbestos abatement survey to facilitate the design.� The AE shall survey the areas of conflict in question to incorporate into the design documents accordingly. HAZARDOUS MATERIAL ABATEMENT SURVEY During the design phase, the A/E will coordinate with Alexandria VA Health Care System Staff to perform a hazardous material abatement survey to facilitate the design. The A/E shall survey the areas of conflict in question to incorporate into the design documents accordingly. The A&E shall be responsible for surveying the areas of work for hazardous material and include the abatement of the hazardous material in the design documents. There may be other non-related local utilities that need to be relocated or modified to facilitate renovation. The A&E shall design plans that will expedite the construction process. Proper construction phasing of work with time limitations shall be included. Also, the replacements shall be done without interrupting hospital operations throughout the entire replacement process. A report of the hazardous material finding will be submitted with the 50% design submission. FIRE PROTECTION ENGINEER REVIEW & CERTIFICATION The A/E shall have the design plans and specifications reviewed by a registered Fire Protection Engineer (FPE) to ensure the design proceeds in accordance with Life Safety Code (LSC) and applicable National Fire Protection Association (NFPA) codes. The FPE s review comments shall be provided along with each design submittal starting with the 65% Design Development drawings. With the Final 100% Construction Documents submittal, provide a FINAL certification letter from a registered FPE stating that the FINAL plans and specifications are in compliance with the current LSC and NFPA codes. PHYSICAL SECURITY & BLAST DESIGN The design shall be in accordance with the latest edition of the Physical Security Design Manual for VA Facilities, Life-Safety Protected/Mission Critical Facilities as applicable. HANDICAP ACCESSIBILITY The design will be required to comply with the Uniform Federal Accessibility Standards (UFAS), ABAAS (Architectural Barriers Act Accessibility Standards) and PG-18-13 (Barrier Free Design Guide) in all areas. COMMISSIONING The construction and intended use does require commissioning. The A/E shall incorporate the VA s commissioning specification into the design and complete set of construction documents as applicable. The Construction contractor shall procure the 3rd party Commissioning Agent to oversee and execute the contract required commissioning activities during Construction. GOVERNMENT FURNISHED INFORMATION The following is a list of government furnished information found on the VA s Technical Information Library website (http://www.cfm.va.gov/TIL/) to be used for this project, as applicable: PG-18-1 Master Construction Specifications PG-18-3 Design and Construction Procedures PG-18-4 Standard Details and CAD Standards PG-18-10 Design Manuals (by discipline) PG-18-12 Design Guides (graphical, by function) PG-18-13 Barrier Free Design Guides Uniform Federal Accessibility Standards (UFAS) ABAAS (Architectural Barriers Act Accessibility Standards) Physical Security Design Manual for VA Facilities, Life-Safety Protected NOTE: Utilize the latest version of guidance at time of design award. SUBMISSION OF DOCUMENTS: The VA staff shall have a minimum number of calendar days to review and coordinate each A/E design submissions broken down as follows: 35% - fifteen days (15), 65% - thirty days (30), 95% - twenty days (20), 100% - twenty days (20). If the VA workload does not allow for a thorough review within this timeframe, the A/E shall not proceed to the next design phase until comments have been received from the VA. The AE will be entitled to a time only contract extension for the number of VA review days beyond what is specified above. The following specifies the documents, etc., required to be submitted by the consultant to the Contracting Officer for distribution for each scheduled review and the due dates for each submission. Dates indicated must be strictly adhered to. Working Drawings: General The Architect/Engineer shall design and estimate so that all applicable codes are met. The A/E and their design teams will be required to attend a 0% pre-design meeting with the Alexandria VA Health Care System personnel to outline the scope of the design project. The A/E should be prepared to walk through the work site, take pictures, ask questions, take measurements, review as built drawings and VA specifications and gather any other pertinent information necessary to fully understand the scope of the design task. The A/E will also be required to make a formal presentation at the 65% and 100% reviews in person. The A/E shall take written minutes of the pre-design meeting and all design reviews, in which he is in attendance, and provide the Alexandria VA Health Care System with them within two (2) working days. The A/E shall establish a construction schedule. The A/E shall prepare a list of equipment and material submittals required by this project as separate specification section in the contract package. In each submission, the A/E shall incorporate all materials, procedures, etc., specified and all revisions according to comments made by either the Health Care System, Regional Safety & Fire Protection Engineer or VA Central Office where applicable. 35% 35% design submission required within sixty (60) calendar days after conclusion of the 0% design meeting. Submittal Letter Consultant shall provide a submittal letter addressed to the Contracting Officer stating documents submitted for 35% Review. Specifications Consultant shall provide (2) sets of edited, assembled and technical Project Specifications to the Project Engineer to be used on this project. Marked up standard specifications are acceptable. The most current VA Master Specifications shall be used on this project and are available on internet: http://www.cfm.va.gov/TIL/spec.asp Drawings Consultant shall provide a (2) full set of project drawings showing the Basic Plan for each discipline involved. This shall include: All drawings developed for the previous reviews shall be detailed showing all utilities, services and sizes as well as other required construction detail. Show complete plan views, elevation views, photographs, legends and other schedule information. Also show complete details, notes, sections and locations. Cost Estimate Consultant shall provide a cost estimate to both the Contracting Officer and the COR/engineer and ensure that the following items are included: Certification that the quantities have been checked and found to be correct. All estimates shall be based on the most up-to-date working drawings available and shall be current as of the date of submission. Materials are priced at the contractor s buying level. Sales taxes, when applicable, will be added into material costs. Cost totals should reflect labor and materials separately and should be formatted as follows: Totals Labor and materials for all branches of work. Contingencies None. Overhead and Profit A nominal percentage to reflect variation of trades, project size, competition, etc. Total Estimated Cost. This submission will be reviewed and one (1) copy of the plans and specifications returned to the Consultant. This design will be reviewed for functional purposes only. Technical accuracy and detail will be the responsibility of the A/E firm. 65% 65% Design is required within sixty (60) calendar days after notice to continue from the 35% is issued by Contracting Officer or the COR. Submittal Letter Consultant shall provide a submittal letter addressed to the Contracting Officer stating documents submitted for 65% Review. Specifications Consultant shall provide (2) sets of edited, assembled and technical Project Specifications to the Project Engineer to be used on this project. Marked up standard specifications are acceptable. The most current VA Master Specifications shall be used on this project and are available on internet: http://www.cfm.va.gov/TIL/spec.asp Drawings Consultant shall provide a (2) full set of project drawings showing the Basic Plan for each discipline involved. This shall include: All drawings developed for the previous reviews shall be detailed showing all utilities, services and sizes as well as other required construction detail. Show complete plan views, elevation views, photographs, legends and other schedule information. Also show complete details, notes, sections and locations. 95% 95% Design is required within sixty (60) calendar days after notice to continue from the 65% is issued by Contracting Officer or the COR. Submittal Letter Consultant shall provide a submittal letter addressed to the Contracting Officer stating documents submitted for 75% Review. Specifications Consultant shall provide (2) sets of edited, assembled and technical Project Specifications to the Project Engineer to be used on this project. Marked up standard specifications are acceptable. The most current VA Master Specifications shall be used on this project and are available on internet: http://www.cfm.va.gov/TIL/spec.asp Drawings Consultant shall provide a (2) full set of project drawings showing the Basic Plan for each discipline involved. This shall include: All drawings developed for the previous reviews shall be detailed showing all utilities, services and sizes as well as other required construction detail. Show complete plan views, elevation views, photographs, legends and other schedule information. Also show complete details, notes, sections and locations. Cost Estimate Consultant shall provide a cost estimate to both the Contracting Officer and the COR/engineer and ensure that the following items are included: Certification that the quantities have been checked and found to be correct. All estimates shall be based on the most up-to-date working drawings available and shall be current as of the date of submission. Materials are priced at the contractor s buying level. Sales taxes, when applicable, will be added into material costs. Cost totals should reflect labor and materials separately and should be formatted as follows: Totals Labor and materials for all branches of work. Contingencies None. Overhead and Profit A nominal percentage to reflect variation of trades, project size, competition, etc. Total Estimated Cost. This submission will be reviewed and one (1) copy returned to the Consultant. This design will be reviewed for functional purposes only. Technical accuracy and detail will be the responsibility of the A/E firm. 100% 100% Design two (2) sets of specifications, drawings and cost estimates are required within forty (40) calendar days after notice to continue is issued by Contracting Officer or the COR. Submittal Letter Consultant shall provide a submittal letter addressed to the Contracting Officer stating documents submitted for 100% Review. Specifications Consultant shall provide (2) sets of edited, assembled and technical Project Specifications to the Project Engineer to be used on this project. Marked up standard specifications are acceptable. The most current VA Master Specifications shall be used on this project and are available on internet: http://www.cfm.va.gov/TIL/spec.asp Drawings Consultant shall provide a (2) full set of project drawings showing the Basic Plan for each discipline involved. This shall include: All drawings developed for the previous reviews shall be detailed showing all utilities, services and sizes as well as other required construction detail. Show complete plan views, elevation views, photographs, legends and other schedule information. Also show complete details, notes, sections and locations. Cost Estimate Consultant shall provide a cost estimate to both the Contracting Officer and the COR/engineer and ensure that the following items are included: Certification that the quantities have been checked and found to be correct. All estimates shall be based on the most up-to-date working drawings available and shall be current as of the date of submission. Materials are priced at the contractor s buying level. Sales taxes, when applicable, will be added into material costs. Cost totals should reflect labor and materials separately and should be formatted as follows: Totals Labor and materials for all branches of work. Contingencies None. Overhead and Profit A nominal percentage to reflect variation of trades, project size, competition, etc. Total Estimated Cost. This submission will be reviewed and one (1) copy of the plans and specifications returned to the Consultant. This design will be reviewed for functional purposes only. Technical accuracy and detail will be the responsibility of the A/E firm. In accordance with the previous review requirements, with all review Specification consultant shall provide to the COR/engineer specifications, complete comments accounted for and ready for use as final contract documents. Specifications shall include scope of work and phasing schedule requirements assembled with the general construction sections. Final submission after completion of all the 100% review comments and corrections, the final contact documents shall be prepared, and submitted within twenty (20) calendar days after notice to continue is issued by Contracting Officer or the COR. Submittal letter consultant shall provide a submittal letter stating that the changes and corrections noted on the previous review have all been evaluated and incorporated in the documents submitted for the final submission. List these documents: Provide as a minimum a 700mb recordable disk containing digital drawings and technical specifications and two hard copies. Drawings to be in AutoCAD and PDF format The Combined Specifications to be in Word and PDF Format The most current VA Master Specifications shall be used on this final documentation submission and are available on internet: http://www.cfm.va.gov/TIL/spec.asp A final cost estimate based on revisions made at 100% review and cost estimate of bid items if required. Totals Labor and materials for all branches of work. Contingencies None. Overhead and Profit A nominal percentage to reflect variation of trades, project size, competition, etc. Total Estimated Cost. A final set of design calculations (where applicable). A&E Design and AS-BUILTS only: The CD case shall have the full name of the firm, address, contact phone numbers, Project number (station number, year, the number of the project) and Set 1 of CDs if more the one CD is required, on the inside of the CD case only there shall be an index of drawings with page numbers and drawing numbers. The CD face shall contain the same information as the CD case except the index . The CD shall not have anything to unbalance it. All information sha...

More opportunities from Department Of Veterans Affairs → 256-NETWORK Contract Office 16 (36C256)

Same awarding agency

NAICS: 236220
New
Federal
Source Sought 36C25627Q0020_564-610 NIPMHB Nurses Call, Boilers, and Rigid Vinyl Sheet
Solicitation # 36C25627Q0020
The Department of Veterans Affairs, through Network Contract Office 16, is conducting market research via a Request for Information to identify qualified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and Veteran-Owned Small Businesses (VOSB) for a construction project at the Veterans Health Care System of the Ozarks in Fayetteville, Arkansas. The project, identified as Project 564-610, involves repairs and installations at the New Inpatient Mental Health Building (Building 49). The scope of work includes the installation of two electric backup boilers with associated piping, pumps, and electrical work, the application of Inpro Palladium Rigid Vinyl Sheet, and the installation of 3/8 inch interior tempered safety glazing for nurse station partitions. The government anticipates awarding a single, firm-fixed-price contract with an estimated magnitude between 250,000 and 500,000 dollars. The period of performance is 210 calendar days from the Notice to Proceed. All work must be performed without disrupting medical center operations and must adhere to the latest NEC, NFPA, and OSHA standards, including the development of an Infection Control Risk Assessment. Personnel are required to have a negative TB test within 90 days of starting work and a minimum OSHA 10 certification. Interested firms under NAICS code 236220 must provide a capability statement, proof of ability to obtain performance and payment bonds up to 500,000 dollars, and details of three relevant recent projects. Responses must be submitted to the Contracting Officer by November 3, 2026.
Commercial and Institutional Building Construction

POSTED

about 18 hours ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS