C1DZ--Correct Stormwater Drainage Deficiencies (VA-22-00010130)

Active
36C24621Q1445Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract solicitation seeks architect-engineer (A/E) services to address stormwater drainage deficiencies at the Salem VA Medical Center in Salem, Virginia. The work includes conducting a comprehensive stormwater management study of the 212-acre campus, performing CCTV inspections of stormwater conveyance systems, and designing corrective measures to ensure compliance with Virginia Department of Environmental Quality regulations. The design package is expected to incorporate detailed hydrological and hydraulic analyses, prepare construction documents with specifications, cost estimates, and schedules, and include provisions for minimizing operational disruptions during construction. The estimated base construction cost is approximately $4 million, with an additional 20% in deductive alternates, and the A/E team must utilize BIM-compliant software following VA standards. Eligible firms must be located within 500 miles of the Salem VA Medical Center and demonstrate relevant expertise and capacity through submission of a Standard Form 330, providing detailed examples of similar projects, qualifications of key personnel, and a design quality control plan. Past performance and technical competence will be major factors in evaluation, with firms required to show experience in stormwater studies, SWPPP preparation, construction period services, and knowledge of local conditions. Deliverables include multiple phased design submissions, cost estimates, schedules, and as-builts, all within a total contract duration of 290 calendar days from the notice to proceed. No reimbursement for proposal preparation costs will be provided, and the Government is under no obligation to award a contract.

General Info

Provide A/E stormwater study, design, and construction documents for Salem VA Medical Center within 290 days.

NAICS

541330 - Engineering Services

Place of Performance

VA

Set-Aside

NONE

Documents

2

Amendment 0001 - Solicitation 36C24621Q1445

PDF, High priority: read this first1 page · amendment
High

Correct Stormwater Drainage Deficiencies (36C24621Q1445)

DOCX, High priority: read this first18 pages · rfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
Posted

special-notice

Notice updated

Notice details unchanged. Attachments may have changed.

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 246-NETWORK Contracting Office 6 (36C246)
Contacts1 person available
OfficeHAMPTON, VA, 23667, USA
Office AddressHAMPTON, VA, 23667, USA
Contacts
Bryant GuerrantContract Specialist

Full Description

Show more
PUBLIC ANNOUNCEMENT FOR PROCUREMENT OF ARCHITECT-ENGINEERING (A/E) SERVICES: This is a request for Standard Form 330, Architect-Engineer Qualifications only. A-E Services are being procured in accordance with the Selection of Architects and Engineers Statute (Public Law 92-582), formerly known as the Brooks Act, and implemented in Federal Acquisition Regulation (FAR) subpart 36.6. All submissions will be evaluated in accordance with the below selection criteria. The Government will not pay, nor reimburse, any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. Firms will be selected based on demonstrated competence and qualifications for the required work. Any resulting award for the proposed A/E services will be procured under a negotiated Firm-Fixed Price contract. The NAICS Code for this acquisition is 541330, Engineering Services, and the applicable Small Business Size Standard is $16.5 million annual revenue. During performance, the selected A/E firm will be required to attend meetings in person, on site, at the Salem VA Medical Center, Salem, VA. Therefore, the area of consideration is RESTRICTED to a maximum 500-mile radius of the Salem VA Medical Center, 1970 Roanoke Blvd, Salem, Virginia 24153 in which either the A/E firm s Primary or established Auxiliary/Satellite office must be located. NOTE: The 500-mile radius will be measured by one or more of the nationally recognized commercial free on-line mapping services from the Primary or established Auxiliary/Satellite Office Address to the above VA address (shortest driving distance option). Proximity of the firms assigned office, to the project site, including within the 500-mile radius, is one of the criteria on which selection of the most highly qualified firms will be based. Interested parties shall ensure current licensing to provide real property design services (Engineer Services) in accordance with the State regulations of which the firms assigned office is located, and shall have a current registration in: (1.) the System for Award Management (SAM) database at https://www.sam.gov, (2.) and the Vendor Information Pages database at http://www.va.gov/osdbu, if applicable, and (3.) have submitted the current cycle VETS-4212 Report at http://www.dol.gov/vets/programs/fcp/main.htm (for contracts in the amount of $150,000.00 or more). Failure of a proposed SDVOSB to be certified by the CVE at the time the SF 330 is submitted shall result in elimination from further consideration. DUE DATE FOR SF330 QUALIFICATIONS: November 18, 2021 @ 11:00am EST PROJECT INFORMATION: Project No.: 658-22-102 Project Title: Correct Stormwater Drainage Deficiencies Place of Performance: Salem VA Medical Center (VAMC), 1970 Roanoke Blvd, Salem, Virginia 24153 A/E SCOPE OF WORK PROJECT NO. 658-22-102 Correct Stormwater Drainage Deficiencies VETERANS AFFAIRS MEDICAL CENTER SALEM, VA 24153 1. General Description of Services: Provide professional engineering services to include analysis, investigative surveys and reports, planning, design, consulting, preparation of contract drawings, specifications, cost estimates and construction period services as required for Project 658-22-102 Correct Stormwater Drainage Deficiencies at VAMC Salem, Virginia. 2. Project Description: The intent of this project is to evaluate all aspects of stormwater management at the VAMC and provide a study and design to ensure full compliance with applicable Virginia Department of Environmental Quality (DEQ) regulations for stormwater control. Study shall address a survey of the entire two hundred and twelve acre (212 ac) campus and identify all structures and impervious structures; locations and capacity of all stormwater conveyances to include flow direction; location and capacity of stormwater control measures and Best Management Practices (BMP); location and size of existing surface water bodies to include wetlands; locations and size of stormwater outfalls to include delineation of area for each outfall; and a description of all receiving waters and wetlands. To assist in evaluating and mapping of existing systems, the A&E shall conduct lateral inspection allowing for closed-circuit television (CCTV) inspection of all main lines and laterals. Contractor performing CCTV inspection shall be National Association of Sewer Service Companies (NASSCO) certified. Design package shall address all system deficiencies identified though the stormwater study and provide all drawings and specifications necessary to produce a complete design package. Design shall include all hydrological and hydraulic calculations necessary to ensure compliance and address peak flow rate; runoff volume and velocity; and capacity. Design package shall include NASSCO Pipeline Assessment and Certification Program (PACP) Report, Lateral Assessment Certification Program (LACP), Manhole Assessment Certification Program (MACP) and recommendations for repair and/or replacement phasing based upon the associated Grading System (e.g. PACP Grading System). Design package shall also provide provisions for temporary facilities and/or other necessary provisions to ensure the facilities maintains full operations and impacts to operations are minimized during construction. After developing options, the A/E shall work in conjunction with VAMC Staff and interested Agencies to determine the best option and then design and prepare construction documents for the all applicable components of this Project. 3. Construction Amount: The project is to be designed within an estimated base construction cost of $4,054,000 with at least 3 deduct alternates totaling 20%. If the base bid cost exceeds budget and deduct alternates do not bring the project within the construction budget, the A/E shall redesign or take steps necessary to reduce cost so that budget limitations are not exceeded. 4. Design Standards: The project design shall be completed in accordance with this A/E scope of work and all applicable Department of Veterans Affairs (VA) standards, specifications, and other criteria referenced herein unless otherwise approved by the VA. The A/E shall retrieve all VA design information and standards from the VA Facilities Web Site (http://www.va.gov/facmgt/standard). These documents and all national, state and local codes adopted and used by the VA shall be incorporated into the design of this project. At a minimum, the following references shall be utilized for planning and design purposes. The facility record drawings and AutoCAD files are available for the A/E s use. NOTE: Not all record drawings are available on AutoCAD. Additionally, the A/E is responsible for field verification of all facility record drawings. Design shall meet or exceed the follow guidelines: VA BIM Manual v2.2 VHA Program Guide PG-18-3 VA Master Construction Specifications Structural Design Manual H-18-8 Seismic Design Requirements Sanitary Design Manual for Hospital Projects PG-18-13 Barrier Free Design Handbook Life Safety Codes Electrical Design Manual HVAC Design Manual PG-18-10 Government Record Drawings (A/E shall field verify conditions) PG-18-15 A/E Submission Requirements. Physical Security Design Manual (Final Draft) VADEQ SWPPP Guidelines NASSCO Specification Guidelines 5. BIM Requirements: AE shall use IFC compliant parametric Building Information Modeling (BIM) software for the design of this project design as prescribed in the VA BIM Manual v2.2 for BIM standards. 6. Deductive Alternates: AE shall ensure the project design includes a minimum of 3 and maximum of 5 viable deductive alternates equal to approximately 20 percent of the projects construction cost to ensure construction award within program budget limitations. Deductive alternatives shall be prioritized after evaluation by VAMC Salem. 7. Construction Estimate: AE shall provide an estimate of construction project costs for all work required for the base bid and the bid alternatives. Cost estimates shall be revised for each design submittal. AE shall prepare cost estimate in accordance with the VA s Manual for Preparation of Cost Estimates & Related Documents for VA Facilities. 8. Construction Schedule and Phasing Requirements: The A-E will develop and submit for review a schedule for construction, as a part of each design submittal phase. The schedule shall be task oriented, indicating the number of calendar days, after Notice to Proceed, by which milestones are to be achieved. The critical path Method (CPM) of network calculation shall be used to generate the construction schedule. The schedule will be a network analysis and will be based on the technical and contractual requirements of the contract and estimated construction durations of the project. The schedule will clearly show the critical path for the overall completion of construction. All activities shall have an estimate of the average number of workers per day that are expected to be used during the execution of that activity. AE shall submit a phasing narrative and phasing plan(s) with each design submission as prescribed in Program Guide, PG-18-5, Volume C. 9. Deliverables: Quantities of design review materials for each design submission are provided below. Stormwater Management Study, Schematic Design, Design Development, and Construction Document Submissions: One (1) set design drawings, complete set bound with all disciplines, Arch D (24 x 36) size. One (1) set design drawings, separated and bound by each discipline, Arch D (24 x 36) size. Three (3) sets design drawings, complete set bound with all disciplines, Arch C (18 x 24) size. One (1) hardcopy copy, edited/marked-up VA Master Specifications of each discipline with VA Master Specification Table of Contents. One (1) hardcopy, Cost Estimate One (1) hardcopy copy, AE Preliminary Schedule One (1) hardcopy, design narratives and investigative reports. One (1) Electronic copy on CD, BIM Model and Drawing Files in BIM Software format. One (1) Electronic copy on CD of CCTV color surveillance video recordings One (1) electronic copy of all design deliverables listed above in (pdf format). Final Construction Document Submission: One complete set (1) Arch D (24 x 36) size sets of the design drawings. Three (3) Arch C (18 x 24) size sets of the design drawings. Two (2) sets complete typed reproducible specifications (unbound) plus a copy on CD ROM in Word format. Note: The specification sections shall be one document on the CD ROM, not individual documents. These shall also incorporate Sections edited by the Salem VAMC in Sections 00 and 01. (ADD NOTE for PDF specifications to have sections AND ONLY the sections book marked.) Two (2) copies of typed Final cost and schedule estimates, plus a copy on CD ROM in Excel format. One (1) hardcopy of design narratives and investigative reports. One (1) electronic set of all design deliverables in (pdf format). BIM Model and drawing files in BIM Software format. One (1) copy of the final scope of work and including base bid and all deduct alternates in Microsoft Word Format. Each bid item and deducts shall have the estimated cost and duration included for that item of work based on the final AE cost estimate and preliminary schedule. Two (2) sets of final digital/hardcopy engineering calculations (if applicable). List of sole source items with justification (if applicable). List of Or-equal items with justification (if applicable). 10. Schedule of Deliverables: All deliverables shall be provided as specified in the schedule of deliverables provide below. The total contract duration for this project is 290 calendar days from issuance of NTP. AE shall submit a schedule not to exceed 290 calendar days within 21 calendar days following issuance of NTP. Schedule shall include at a minimum all activates and/or milestones listed in the sample schedule below. The A/E shall provide monthly progress schedule updates throughout the design process. The selected A/E must be able to deliver on this timeline. AE Project Schedule of Deliverables Task Name Duration NTP 0 days Design Charette* 14 days Site Investigation 45 days Schematic Design 30 days VA Review 21 days Schematic Design Review Meeting 1 day Design Development 60 days VA Review 21 days Design Development Review Meeting 1 day Construction Document Development 45 days VA Review 21 days Construction Document Review Meeting 1 day Final Construction Documents 30 days Total Duration 290 days Notes: Durations provided above are shown in calendar days. Design Charrette shall be scheduled within 7 calendar days following receipt of NTP. 11. As-Builts: Upon completion of construction and incorporation of all revisions required to complete the Building Information Model and record drawings, the following items shall be submitted: Two (2) sets, reproducible hard copy as-built plans, Arch E1 (30 X 42 ) One (1) electronic copy on CD-ROM, as-built drawings in AutoCAD format, current release. One (1) electronic copy on CD-ROM, complete Building Information Model. INSTRUCTIONS TO OFFERORS FOR PROPOSAL PREPARATION THIS SECTION IS FOR SOLICITATION PURPOSES ONLY. THIS SECTION WILL BE PHYSICALLY REMOVED FROM ANY RESULTANT AWARD BUT WILL BE DEEMED INCORPORATED BY REFERENCE. (a) GENERAL INSTRUCTIONS: 1. All proposal preparation cost will be the sole responsibility of the Offeror. The Government will not reimburse any firm for their proposal preparation cost. Technical proposals of each offeror will be evaluated independently. All copies shall therefore be labeled with the offerors name, business address, and VA Solicitation Number. To assure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. A firm will not be considered if its SF 330 Part I is not signed, unless the SF 330 Part I is accompanied with a signed cover letter or a current signed SF 330 Part II. If a firm does not submit a SF 330 Part II with its SF 330 Part I, or have one on file, it will not be considered (FAR 36.603(b)). The offer shall consist of two separate parts: Part I - TECHNICAL CAPABILITY Part II PAST PERFORMANCE (b) SPECIFIC INSTRUCTIONS 1. PART I - TECHNICAL PROPOSAL - Submit original and two (2) copies and 1 CD. Professional Qualifications, Design Schedule & Experience shall be limited to no more than 15 pages total. The Design Quality Control plan shall be limited to no more than 10 pages total. Format as follows: TAB A: General Information Cover page with Solicitation Number and Project Title Table of Contents Company information to include: DUNS Number, Cage Code, Tax ID Number, Principle points of contact with addresses, phone numbers and email addresses. TAB B: TECHNICAL CAPABILITY (Evaluation Factor 1) Specialized Experience and Technical Competence Sub Factor 1 Professional Qualifications Sub Factor 2 Capacity - Sub Factor 3 Knowledge of the Locality Sub Factor 4 Design Quality Control Plan Sub Factor 5 Experience in Construction Period Services Sub Factor 6 PART II PAST PERFORMANCE Past Performance Questionnaires: The Government will evaluate the quality and extent of offeror s performance deemed relevant and recent to the requirements of this solicitation. (c) GENERAL INFORMATION Pages exceeding the page limitations set forth will not be evaluated and will be removed from the proposal. Format for proposal Part I & II shall be as follows: A page is defined as one face of an 8 ½ x 11 sheet of paper containing information. Typing shall not be less than 12-point font. The Offeror, separately (but included in the same sealed envelope) shall submit an original, TWO IDENTICAL COPIES (including any colored images, tabs, etc.) of a detailed technical proposal in a format that clearly addresses the technical evaluation factors below. You shall also submit your technical proposal on a CD. Each response shall address each factor in the sequence listed and clearly identify which factor is being addressed. There shall be no mention of costs in the Technical Proposal. Proposals shall be submitted in a sealed envelope and delivered to the address below by or on the set forth due date: Salem VA Medical Center Attn: Bryant Guerrant 1970 Roanoke Boulevard Building 74, Rm 211 Contracting Salem, Virginia 24153 FEDERAL HOLIDAYS: The following Federal Legal Holidays are observed by this Medical Facility: New Year s Day 1 January Martin Luther King s Birthday Third Monday in January Presidents Day Third Monday in February Memorial Day Last Monday in May Juneteenth- 19 June Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December Any other Federal Holiday granted by the President of the United States For the purposes of this document the term Relevant Project is defined as follows: A project, completed within five years of similar dollar value, size, complexity and scope that includes a stormwater management study, design to address deficiencies, preparation and subsequent approval of a Stormwater Pollution Prevention Plan (SWPPP), and construction services; minimum threshold of $2,000,000. Ongoing projects will not be considered as no accurate performance record can exist if work is not yet complete. EVALUATION FACTORS FOR AWARD THIS SECTION IS FOR SOLICITATION PURPOSES ONLY. THIS SECTION WILL BE PHYSICALLY REMOVED FROM ANY RESULTANT AWARD BUT WILL BE DEEMED INCORPORATED BY REFERENCE. The Government will award a contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, and other factors considered. Boards will evaluate firms' qualifications strictly on the basis of the announced selection criteria and their stated order of importance. The criteria will be applied as follows: PART I TECHNICAL CAPABILITY The following criteria will be used to by a selection board to determine the most highly qualified firms in respect to their technical capability. Technical capability will be evaluated based on the following factors: Specialized Experience and Technical Competence (FAR 36.602-1(a)(2)). Offerors will be evaluated based on the specialized experience of a firm on similar projects and the technical capabilities (such as design quality management procedures, CADD/BIM, and equipment resources,) of the prime firm and any subcontractors. Evaluation will be based on the information presented in the Architect-Engineer Qualifications - Standard Form 330 (SF330). A maximum of five (5) example projects may be submitted for consideration under SF330, Part I, Section F. Example projects should be stormwater management study, design to address deficiencies, preparation and subsequent approval of a SWPPP, and construction services completed within six (6) years of solicitation closing date. Professional Qualifications (FAR 36.602-1(a)(1)). A board will evaluate, as appropriate, the education, training, registration, certifications (see paragraph 3-4.d(4)), overall and relevant experience, and longevity with the firm of the key management and technical personnel. This criterion is primarily concerned with the qualifications of the key personnel and not the number of personnel, which is addressed under the capacity criterion. The lead designer in each discipline must be registered as required by FAR 36.609-4 and 52.236-25 but does not have to be registered in the particular state where the project is located. Capacity (FAR 36.602-1(a)(3)). A firm s capacity will be evaluated based on their experience with similar size projects, the available capacity of key disciplines to perform the work in the required time, and a primary design schedule. The volume of work awarded during the previous 12 months, based on data extracted from the Federal Procurement Data System, will be considered when evaluating capacity. Additionally, the full potential value of any current indefinite delivery contracts that a firm has been awarded will be considered when evaluating capacity. Knowledge of the Locality (FAR 36.602-1(a)(5)). Firms will be evaluated on their knowledge of the locality such as knowledge of local historical features, climatic conditions, and local construction methods that are unusual or unique to the area. Design Quality Control Plan. Firms will be evaluated on their approach to ensure technical quality and accuracy of work products. A firm's approach to resolve issues of quality will be analyzed to determine its ability to provide quality design products. Describe and define the processes of the firm's quality control plan and list, by name and position, all key personnel responsible for its execution. Quality control information shall also address safety measures particularly with respect to field work and site investigations. Information describing Quality Management may be presented in SF330, Part I, Section H. A design quality control plan shall be submitted as part of the proposal. Experience in Construction Period Services. Firms will be evaluated on their experience in providing construction period services to include professional field inspections during construction, review of construction submittals, support in answering request for information, and support of construction contract changes to include drafting statements of work and preparing cost estimates. Evaluation will be based on responses provided to the attached questionnaire. PART II PAST PERFORMANCE The following criteria will be used to by a selection board to determine the most highly qualified firms based on a firm s past performance. Past Performance (FAR 36.602-1(a)(4)). The Government will evaluate the quality and extent of offeror s performance deemed relevant and recent to the requirements of this solicitation. PART I TECHNICAL CAPABILITY First, the technical capability of all offers will be evaluated on an adjectival basis. Sub-factors will be weighted equally, and all areas must have at least a satisfactory rating. Evaluators shall assign a rating from the following table based on the minimum requirements stated in each sub-factor section. Adjectival Rating Definitions Exceptional Meets all requirements and exceed majority of requirements. Overall the proposal meets and significantly exceeds, in all aspects, the standards for evaluation: very high probability of success: no significant weaknesses. Very Good Meets all requirements and exceed some requirements. The proposal meets and, in some cases, exceeds the standards for evaluation; high probability of success; no significant weaknesses and only minor correctable deficiencies. Satisfactory The proposal meets the standard for evaluation; good probability of success; only minor weaknesses and correctable deficiencies. Marginal Lacks material information. The proposal fails to meet some of the standards for evaluation; low probability of success; major weaknesses and/or uncorrectable. Unacceptable Lacks material information. The proposal fails to meet some or all of the standards for evaluation; need major revision to a new submission to make if acceptable or may contain uncorrectable deficiencies. Sub-Factor 1 Specialized Experience and Technical Competence CRITERIA: This factor will evaluate the Offeror s technical competence, based on successful completion of projects, in the production of a stormwater management study, design to address deficiencies, preparation and subsequent approval of a SWPPP, and construction services. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard of acceptability is met when the Offeror provides a minimum of three (3) and a maximum of five (5) examples of their choice of completed projects or in progress of similar contracts in size and scope (stormwater management study, design to address deficiencies, preparation and subsequent approval of a SWPPP, and construction services; minimum threshold of $2,000,000). In describing the experience, provide the following information: Project title, location and brief description including the building use (Medical Facility, etc) and contracting method (design build, design bid construct, CM at risk, Turnkey, etc). Project owner and name and telephone number of owner s contact person. Indicate your firm s role as a prime contractor or subcontractor, etc. Project Prime Contractor and Major Subcontractors and name and telephone number of contact person(s). Project Statistics including start and completion dates (original vs. actual) for design; cost (with brief explanation of what is included in the cost); square footage; and any awards (prizes) received. Please use the Corporate Experience Form (Exhibit B) included with the solicitation to provide the requested information for Experience. Sub-Factor 2 Professional Qualifications CRITERIA: This factor evaluates the Offerors specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. MINIMUM STANDARD OF ACCEPTABILITY: The Offeror must provide the resumes for the following Key Personnel purposed for assignment to the project: Project/Design Manager: Must have a minimum of five (5) years experience successfully managing design projects that meet the criteria for similar projects as defined in evaluation factor 3 above. Civil Engineer: Must have a minimum of five (5) years experience performing stormwater management studies, designing stormwater management systems, and SWPPP preparation. Projects shall meet the criteria for similar projects as defined in evaluation factor 3 above. Other Disciplines proposed by the Offeror: Must have a minimum of three (3) years experience successfully designing projects that meet the criteria for similar projects as defined in evaluation factor 3 above. All Resumes must include the following information and may not exceed two (2) pages per Resume, and must explain how the proposed key personnel s experience meets the minimum qualification requirements for this contract, as described above: Name and title Project assignment Name of firm with which associated Sub-Factor 3 Capacity CRITERIA: This factor will evaluate the Offeror s ability to perform the study, design, and construction period services. The Offeror shall demonstrate that is has the capacity to accomplish the work in the required time. Additionally, the Offeror shall show that it can perform the required stormwater management study, site investigations, design services, preparation and subsequent approval of a SWPPP, and construction period services without adversely affecting the project schedule. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard of acceptability is met when the Offeror provides: Offeror must specify the total volume of work awarded to the firm within twelve (12) months of solicitation closing and provide a proposed design schedule not to exceed 365 calendar days. Prepare and submit a practicable design schedule laying out all necessary performance elements needed to complete this project identified in the solicitation in the proposed period of performance. The schedule must be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the performance period. In addition, the schedule must be submitted in the Microsoft Project format. Offerors should only include the work elements necessary to complete the required work. It is the Offeror s responsibility to identify all necessary project/work elements and the proposal adequately identifies acceptable critical path elements. Sub-Factor 4 Knowledge of the Locality CRITERIA: Identify example projects that demonstrate the firm s knowledge of the locality (i.e. Salem VA Medical Center). MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard of acceptability is met when the Offeror provides: Firms shall demonstrate knowledge of localities per example projects. Knowledge of the VA VISN 6 service area will hold much higher weight and evaluated more favorably than projects outside the VISN 6 service area. General understanding of the local conditions, including physical environment, local engineering criteria, and construction methods will be evaluated. The following key personnel resumes shall also be evaluated for knowledge of localities: Project Manager, Civil or Environmental Engineer. The basis of evaluation for this criterion will focus on the information provided in SF330, Part I, Section E (Resume of Key Personnel), Section F (Example Projects), and Section H (Additional Information) that provides additional information describing same/similar qualifications as deemed relevant to performance at the Salem VA Medical Center. Sub-Factor 5 Design Quality Control Plan CRITERIA: The plan shall identify personnel, design review procedures, site investigation/confirmation of existing conditions plan, and forms to be used. A finalized, more detailed Design Quality Control Plan (QCP) will be required to be submitted and approved after contract award. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standards of acceptability are met when the Offeror provides: A description of the quality control system, including a chart showing lines of authority and acknowledgement that the Design Manager shall implement control measures for verification of all design activities. The names, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned as Design Quality Control (QC) manager. Any replacements must have similar qualifications in dealing with projects of similar size and scope. Sub-Factor 6 - Experience in Construction Period Services CRITERIA: Identify example projects that demonstrate the firms experience providing construction period services. Offerors will be evaluated on their experience in providing construction period services to include professional field inspections during construction, review of construction submittals, support in answering request for information, and support of construction contract changes to include drafting statements of work and preparing cost estimates. Evaluation will be based on responses provided to the attached questionnaire. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard of acceptability is met when the Offeror provides a minimum of three (3) and a maximum of five (5) examples of their choice of completed projects of similar contracts in size and scope (stormwater management study, design to address deficiencies, preparation and subsequent approval of a SWPPP, and construction services; minimum threshold of $2,000,000) for which construction period services were provided. The contractor shall send out the enclosed past performance questionnaires to the applicable party for each example project. The Government will evaluate the quality and extent of offeror s performance deemed relevant and recent to the requirements of this solicitation. The references must return the survey directly to the Government Contract Specialist listed on the survey via email. PART II PAST PERFORMANCE Next, the Government will evaluate the offeror s demonstrated past performance of projects in order to determine the offeror s ability to perform the contract successfully and help determine responsibility. As with technical capabilities, the firms will be evaluated with an adjectival rating system. Adjectival Rating Definitions Exceptional Meets all requirements and exceed majority of requirements. Overall,...

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
Engineering And Traffic Surveys Supporting The Town's Speed Limits To Continue Radar Enforcement
Solicitation # 27-004
The Town of Los Gatos, through its Parks and Public Works agency, is soliciting proposals for solicitation number 27-004 to conduct engineering and traffic surveys across 65 designated roadway segments and all existing school zones. The primary objective is to renew the surveys supporting prima facie speed limits to ensure continued legal radar enforcement in compliance with the California Vehicle Code and AB 382. The selected consultant, who must be a California-licensed Professional Engineer qualified in traffic engineering, will perform speed data collection on 31 high-volume segments using radar and 34 low-volume segments using 24-hour mechanical counters. The scope also requires a review of three years of accident history, field checks of each segment, and the delivery of a final engineering report in searchable PDF format containing 85th-percentile speeds and a speed-limit recommendation matrix. The contract is for a one-year term beginning in January 2027 with no option for renewal. Proposers must submit electronic bids by November 27, 2026, and will be evaluated through a two-phase process consisting of a pass/fail responsiveness check followed by a 100-point scoring system based on qualifications, work plan, price, and references. Awardees must maintain significant insurance coverage, including 2 million dollars in general liability, 1 million dollars in automobile liability, and 1 million dollars in professional liability. The agreement includes strict non-discrimination requirements with potential liquidated damages of 100 dollars per day for non-compliance and allows for termination by either party with 15 days written notice. Payment is structured as monthly invoicing with net 30-day terms.
Parks and Public Works

POSTED

about 8 hours ago

DEADLINE

in 29 days
View Details
NAICS: 541330
New
SLED
On-Call Structural and Seismic/Disaster Engineering Services
Solicitation # FAS 2026-037
The City of Seattle Finance and Administrative Services Capital Development division is seeking to establish two on-call contracts for professional structural and seismic/disaster engineering services under solicitation FAS 2026-037. The selected consultants will provide technical expertise on an as-needed basis for small to medium projects throughout the planning, design, procurement, and construction phases, utilizing delivery methods such as Design-Bid-Build, Job Order Contracting, and the Small Works Roster. The scope of work includes structural engineering studies, seismic evaluations, confidence testing, fall protection design, and the preparation of construction documents stamped by a licensed engineer. All deliverables must adhere to specific CAD standards, including software compatibility with AutoCAD 2025.1.3 and AIA/US National CAD Standard V5. Eligible firms must be licensed to practice in Washington State and the City of Seattle, demonstrate experience with current code compliance, and provide three relevant projects completed within the last seven years. The contract features an initial one-year term with up to four optional one-year renewals, for a maximum duration of five years. Evaluation of proposals is based on relevant technical experience (40 percent), approach and methodology (30 percent), and an inclusion plan (15 percent) focusing on women and minority-owned businesses. Responses are due by December 2, 2026, via the OpenGov portal, with a target contract execution date of December 15, 2026. Consultants are required to maintain Commercial General Liability insurance and comply with various local and federal regulations, including ADA and City of Seattle labor ordinances.
Finance and Administrative Services

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Veterans Affairs → 246-NETWORK Contracting Office 6 (36C246)

Same awarding agency

NAICS: 811198
New
Federal
J025--NEW CART MAINTENANCE AND REPAIR
Solicitation # 36C24627Q0057
Solicitation 36C24627Q0057 is a request for quotations from the Department of Veterans Affairs, Network Contracting Office 6, for a base year plus four option year service contract. The contract requires a provider to perform preventive maintenance, inspection, troubleshooting, and repair services for a fleet of 39 government-owned golf carts and utility vehicles at the Hampton VA Medical Center in Virginia. Services may be performed on-site or at the contractor's off-site facility, with routine work conducted during standard business hours. The contractor is responsible for providing all necessary personnel, tools, and diagnostic equipment to ensure the fleet remains safe and reliable in accordance with manufacturer recommendations. This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The government intends to make a single award based on technical acceptability and the lowest total evaluated price. Following Amendment 0002, the response deadline has been extended to October 29, 2026, at 10:00 AM Eastern Time. Quotations must include a signed Standard Form 1449, pricing on company letterhead, and a signed certificate of compliance regarding limitations on subcontracting per VAAR 852.219-75. Performance will be evaluated through service report reviews, vehicle inspections, and the timely completion of scheduled maintenance.
All Other Automotive Repair and Maintenance

POSTED

about 2 hours ago

DEADLINE

in about 22 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS