Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Pre-Solicitation opportunity from Department Of Veterans Affairs was posted on May 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C222--FY26 NRM | 509-26-105 Electrical Master Planning (VA-26-00013664) Request for SF-330's/NAICS Code 541330

Closed
36C24726R0102Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering various technical and professional services including civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as cathodic protection system design, BIM/3D modeling, and commissioning and startup planning. Additional requirements include utility locating and potholing, geotechnical and geophysical investigations, LIDAR, land surveying, drone services, CPM scheduling, and comprehensive environmental services such as hazardous materials surveys, permitting support, and compliance monitoring. The solicitation specifically targets qualified Disadvantaged Business Enterprises, including MBE, WBE, and OBE firms. Interested bidders must be issued an Invitation to Bid through the Building Connected system and must possess a valid California Contractor license and acceptable insurance. Responsible subcontractors are required to provide bonding for 100 percent of their contract value, with Kiewit agreeing to reimburse the bond premiums. Bidders must also demonstrate the ability to maintain labor harmony, as Kiewit is a signatory to collective bargaining agreements with several trade unions. The bid deadline is September 11, 2026, and inquiries should be directed to Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 14 hours ago

DEADLINE

in 17 days
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending the gravity sewer mainline, installing service laterals for properties currently using onsite septic, and decommissioning existing pump stations, particularly in the Romaine Village area. The scope may also include transportation improvements such as ADA curb ramp and curb design and intersection enhancements at Poplar Street and Ponderosa Street. This initiative is funded by the Clean Water State Revolving Fund through the Oregon Department of Environmental Quality, with a total project budget for design and construction of 3,875,000 dollars. The solicitation, identified as number 27-3214, has a response deadline of September 29, 2026. Parametrix is actively pursuing a good faith effort to include firms with federal, tribal, state, local, or independent DBE certifications, and the project is open to various small business set-asides including WOSB, HUBZone, and SDVOSB. The City of Bend will award the contract based on a scoring system evaluating project understanding, team qualifications, and firm experience, with the goal of advertising for construction services in fall or winter 2027. Submissions must adhere to strict formatting guidelines, including a 12-page limit for primary text sections and the inclusion of signed certifications and assurances.
Parametrix

POSTED

about 14 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The firm selected will conduct a comprehensive electrical master planning effort for the VA Augusta Downtown Division located at 950 15th Street, Augusta, Georgia, evaluating the existing electrical infrastructure to identify deficiencies, code violations, aging equipment, and capacity constraints while ensuring alignment with VA guidelines, NFPA standards, and VHA Directive 1028. The scope includes on-site assessments of power generation, distribution, and emergency systems, analysis of as-built drawings and maintenance records, load forecasting, and integration of renewable energy opportunities where feasible. The deliverables consist of an assessment report, updated single-line diagrams, a detailed electrical master plan with phased implementation strategies, cost estimates, and a prioritized budget overview—all structured as standalone projects not exceeding $16 million in total value. All proposed upgrades must be realistically scoped to enhance system reliability, efficiency, and resilience, with projects ranked by medical center priority and reviewed if near or exceeding the $16 million cap. The solicitation mandates submission of SF 330 forms with specific narrative sections and supporting documentation, emphasizing specialized experience in hospital electrical system design, proven past performance on government projects—particularly VA medical centers—with at least three completed or substantially complete projects, and qualifications of key personnel including licensed professional engineers responsible for design approval and permitting. Offerors must demonstrate capacity to complete the work within the required timeframe, showing availability of key team members and workload projections, and possess specific knowledge of Augusta’s local conditions, labor markets, and regulatory environment. A mandatory certification is required affirming that at least 50% of the work will be performed by a Service-Disabled Veteran-Owned Small Business (SDVOSB), in compliance with 48 CFR 852.219-10, and failure to meet this requirement may significantly reduce the proposal’s rating. Deliverables are due in three incremental submissions—25% at NTP +60 days, 75% at NTP +220 days, and 100% at NTP +320 days—with monthly progress reviews and full stakeholder presentations required. All submissions must adhere to strict page limits for resumes, summaries, and narratives, and include PPQs or CPARS for each referenced project, with failure to provide adequate documentation resulting in a lower rating or non-responsiveness.

General Info

Provide electrical master planning for VA Augusta hospital, ensuring code compliance and phased upgrades under $16 million.

Agency

Department Of Veterans Affairs → 247-NETWORK Contract Office 7 (36C247)View Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

VA Augusta Downtown Division, Augusta, GA, 30901, USA

Set-Aside

SDVOSBC

Documents

(1)

Solicitation 36C24726R0102 Electrical Master Planning VA Augusta

DOCXrfp

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 247-NETWORK Contract Office 7 (36C247)
Contacts1 person available
OfficeAUGUSTA, GA, 30904, USA
Organization / Agency
Department Of Veterans Affairs → 247-NETWORK Contract Office 7 (36C247)
View Agency Profile
Office AddressAUGUSTA, GA, 30904, USA
Contacts
Kenyon E. DulaneyContracting Officer

Full Description

Show more
Electrical Master Planning GENERAL SCOPE OF WORK:
The firm selected shall provide all labor, materials, transportation, and professional engineering services as required to complete a comprehensive electrical survey and master planning for VA Augusta Downtown division located at 950 15th Street Augusta, Georgia 30901. This plan will provide a comprehensive evaluation of the existing electrical infrastructure, identify deficiencies, and propose upgrades necessary to support current and future needs of the hospital. STATEMENT OF PROJECT OBJECTIVES:
It is the intent of the Department of Veterans Affairs to conduct the firm survey, investigate, and document the existing space to gain the knowledge and insight necessary to prepare quality, accurate documents in a professional and competent manner. The project objectives are as follows:
Assess the current state of electrical infrastructure, evaluating code deficiencies or end of life equipment VA will provide the most recent arc flash study Review compliance with VA guidelines, Electrical design manual, NFPA standards, and other relevant codes. Review Facilty Condition Assessment (FCA) Develop a roadmap for upgrades and expansions to meet future hospital demands. Projects shall be realistic and not exceed $16M. Any projects that exceed $16M, shall be specifically discussed during project reviews. Projects shall be rated based on the highest importance to Medical Center To enhance the reliability and efficiency of the hospital s electrical systems
STATEMENT OF TASKS:
This survey shall include, but may not be limited to, the following tasks:
Assessment and Evaluation Conduct on-site assessments of existing electrical systems, including power generation, distribution, and emergency systems. Review as-built drawings, previous electrical studies, and maintenance records. Perform load analysis and evaluate current and future power demands. Identify code compliance issues and areas where the system lacks redundancy or resilience.
Development of the Electrical Master Plan Provide detailed documentation of the existing electrical system. Update single-line diagrams representing the present state of the electrical system. Propose upgrades, replacements, and new installations required to meet current and future demands. Integrate renewable energy sources if applicable. Develop phasing plans and timelines for the implementation of recommended improvements.
Cost Estimation and Budgeting Provide cost estimates for all recommended upgrades and expansions. Develop a prioritized list of projects with associated budgeting and timelines. All projects shall be estimated below $16M total. All projects shall be standalone.
Reporting and Documentation Prepare comprehensive reports detailing the assessment findings, recommendations, and proposed upgrades. Submit drawings, CAD models, and other technical documentation as part of the master plan. Present the final Electrical Master Plan to VA stakeholders.
Deliverables Assessment Report Electrical System Single-Line Diagrams Electrical Master Plan Document Cost Estimates and Budget Overview Implementation Timeline and Phasing Plan
Submission Schedule - Provide a detailed project schedule, including key milestones and deadlines. Total of three (3) submissions 25% - NTP + 60 days 75% - NTP + 220 days 100% - NTP + 320 days Project Updates Meetings and Communication Monthly progress meetings will be scheduled via COR and Contracting Officer. Provide consistent progress reports and address any arising issues promptly.
VA Resources Department of Veterans Affairs standards may be obtained from the Internet at http://www.cfm.va.gov/TIL/. VA Physical Security Design Manual for VA Facilities See the Technical Information Library (http://www.cfm.va.gov/TIL/) for specific design guides. VHA Directive 1028 Facility Electrical Power Systems
END OF STATEMENT OF WORK

SF 330 Supplemental Information Architect/Engineer Evaluation Criteria
Evaluation Criteria are provided below and listed in relative order of importance.
Specialized experience and technical competence in Electrical Design and Electrical Master Planning.
Submission requirements:
SF 330 information shall be provided per the latest format from the GSA Library located at https://www.gsa.gov/forms-library/architect-engineer-qualifications.
Complete using blocks F. and H. of the SF330 form. Complete block F. for each relevant project. Complete block H. summary sheet for the Offeror and each key consultant; each summary sheet shall be not more than one (1) page in length, and no more than ten (10) pages total.
Submit no more than five (5) projects similar to work in the solicitation from the date the solicitation closes to five (5) years prior;
At minimum, three (3) projects must have construction completed or construction substantially (50%+) complete;
Projects may include Federal, State, or local Government, as well as private industry projects. Offerors are responsible for providing project description and applicable information in sufficient detail to permit evaluation of project relevancy versus these minimum requirements.
Basis of Evaluation:
Specialized experience pertains to the types, size, volume, budget, and complexity of work previously or currently being performed by the Offeror that is comparable to the work covered by this solicitation. Specialized experience may also include unique conditions, considerations, or circumstances encountered that are relevant to this solicitation.
Specialized experience does not include overseas offices for projects outside the United States, its territories, or possessions; nor does it include subsidiaries that are not normally subject to management decisions, accounting, and policies, or a holding or parent company or an incorporated subsidiary that operates under a firm name different from the parent company.
Technical competence includes construction and design projects similar in project scope, size, construction features, dollar value, and complexity of that listed in the solicitation. Technical competence also includes experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials.
Similar complexity is considered projects of an operational, construction, or design likeness to the work covered in this solicitation.
Specific emphasis of experience and technical competence shall be geared towards experience in leading or playing a major role in designing/renovating Electrical system in hospital environment.
Offerors unable to demonstrate proven specialized experience and technical competence may be considered non-responsive or scored negatively.
Failure to provide requested data may negatively impact an Offeror's rating.
Past Performance on contracts with Government agencies and private industry in terms of cost control, quality work, and compliance with performance schedules.
Submission requirements:
Complete using block H. of the SF 330 describing the Offeror s past performance. The summary sheet shall be not more than two (2) pages in length.
Provide a Past Performance Questionnaire (PPQ) and/or Contractor Performance Assessment Reporting System (CPARS) for each submitted project under Specialized Experience criteria, above. PPQs and/or CPARS must be incorporated into the submission; PPQs/CPARS will not count towards page limitations.
Data from other projects not included under Specialized Experience criteria are acceptable (such as cost control or schedule delays) in tables or charts.
Basis of Evaluation:
Past performance is a measure of the degree to which an Offeror satisfied its customers needs and requirements and compliance with applicable codes, standards, laws, and regulations. The evaluation of past performance will include but is not limited to:
The customer s assessment of the Offeror's commitment to customer satisfaction;
Timely delivery of quality work;
The Offeror's record of conforming to contract requirements and applicable codes, standards, laws and regulations;
Successful implementation of a quality control plan and quality control procedures;
Adherence to approved schedules; and,
History of timely and professional communication and cooperative behavior.
Provide information supporting favorable cost control, quality of design submissions, and schedule compliance.
Offeror risks receiving a lower rating if fewer than three (3) PPQs/CPARS are provided or if the PPQs were not completed by project point of contact.
Higher ratings may be given for work performed on VA Medical Center campuses.
Failure to provide requested data or to provide an accessible point of contact (POC) may negatively impact an Offeror's rating.
Failure to demonstrate proven competence to perform projects like the requirements of the solicitation may be considered ineligible for award.

Professional qualifications necessary for satisfactory performance of required services.
Submission Requirements:
Complete using block E. of the SF 330. Submit personal resumes and relevant information for key and responsible personnel. Block E. shall be not more than one (1) page in length per individual, and not more than fifteen (15) total pages.
Basis of Evaluation:
Evaluation of professional qualifications will include but is not limited to the subjective assessment of the Offeror's individual resumes.
The Offeror shall have a professional engineer, currently registered in any state or territory of the United States, knowledgeable in their registered design discipline, to be the lead designer responsible for reviewing and approving design submissions.
The Offeror shall have a professional engineer, qualified and knowledgeable of state and local regulations, be the lead designer responsible for reviewing and approving design submissions and facilitating permit documentation (depending on the nature of the design i.e. environmental, stormwater, etc.).
Key personnel to provide qualifications to meet this criterion include Principal(s), Project Manager(s), key consultants, individuals responsible for implementation of the Design QA/QC Plan, and other individuals that are responsible or accountable for design submissions.
Physical Security Subject Matter Experts shall meet the requirements of Section 10.1.5 of the Physical Security & Resiliency Design Manual.
The Offeror shall describe and/or depict which projects and how well key personnel of the design team have worked together.
Higher ratings for this criterion may be given when the Offeror's specific personnel demonstrate relevant credentials, such as involvement and degree of involvement in professional organizations, research/publications, code/standard body involvement, etc.
Offerors unable to demonstrate professional qualifications necessary to perform designs may be considered non-responsive .
Failure to provide sufficient data supporting professional qualifications may negatively impact an Offeror's rating.
Capacity to accomplish the work in the required time.
Submission Requirements:
Complete using block H. of the SF 330. Provide a narrative that describes the Offeror s work capacity. Narrative shall be not more than one (1) page in length.
Basis of Evaluation:
Identify the Offeror s past, present and projected future workload, including VA contracts over the previous 12 months.
Describe the Offeror s capacity to incorporate this solicitation s work while meeting prescribed dates for current workload. Each key team member to include % of available capacity to take on new projects.
Evaluation of this factor will be an assessment of the Offeror s ability to complete design documents within the period of performance and meet solicitation requirements.
Data is acceptable in tables or charts.
Higher ratings may be given for this criterion when information provided exceeds the minimum requirements.
Location in the general geographical area of Augusta, GA, and knowledge of the locality of the Charlie Norwood VA facility:
Submission Requirements:
Complete using block H. of the SF 330. Provide a narrative that describes the Offeror s experience in the Augusta, GA geographical area. Narrative shall be not more than one (1) page in length.
Basis of Evaluation:
Offerors will be subjectively evaluated based on their knowledge (and the knowledge of subcontractors) of unique conditions or variables, such as familiarity of applicable codes, regulations, construction market & labor conditions, geotechnical, seismic, weather, environmental, or other unique considerations found in Augusta, GA, and its surrounding areas.
If prior experience in Augusta, GA is minimal, describe how the design team plans to obtain specific knowledge of local conditions or project features required for a compliant design.
Data from other projects and locations are acceptable to highlight knowledge of the Augusta, GA geographical area or areas of similar nature.
Offerors that submit relevant projects outside of the Augusta, GA geographical area may be given a lower rating than projects within the Augusta, GA geographical area.
The extent to which potential contractors identify and commit to the use of service-disabled Veteran-owned small businesses, Veteran-owned small businesses, and other types of small businesses as subcontractors:
Submission Requirements:
Complete using block H. of the SF 330. Provide a narrative that discusses the Offeror s approach. Narrative shall be not more than one (1) page in length.
Offeror s shall complete and submit the following statement in block H. :
I [signatory authority], of [Offeror Company or Joint Venture] certify that the team proposed to perform under this requirement demonstrates the capability of 50% SDVOSB performance in compliance of 48 CFR 852.219-10 .
Basis of Evaluation:
Offerors shall be evaluated based on their utilization plans for service-disabled Veteran-owned small businesses (SDVOSBs), Veteran-owned small businesses (VOSBs), or other types of small businesses.
Offerors shall be evaluated on the expected amount of work versus key personnel to verify the above signatory statement. If less than 50% of work is estimated to be performed by the prime SDVOSB, the Offeror may be given a lower rating.
Offerors shall submit qualifications for proposed consultants per other criteria in this solicitation.

More opportunities from Department Of Veterans Affairs → 247-NETWORK Contract Office 7 (36C247)

Same awarding agency

NAICS: 621991
New
Federal
VISN 7 Blood and Blood-Related Products
Solicitation # 36C24726Q0911
The Department of Veterans Affairs, VISN 7, has issued a sources sought notice under solicitation number 36C24726Q0911 to conduct market research for the procurement of blood and blood-related products and associated testing and laboratory services. The intended scope covers VA medical facilities across Alabama, Georgia, and South Carolina. The agency plans to establish a five-year, firm-fixed-price Indefinite-Delivery Indefinite-Quantity (IDIQ) contract with an anticipated period of performance from June 1, 2026, through May 31, 2031. This notice is for planning purposes only and is not a formal solicitation for proposals or quotes. Qualified contractors must be capable of providing whole blood and blood components, including allogeneic and autologous types, and performing ABO and Rho(D) typing and transfusion-transmitted disease marker testing. All products and services must strictly adhere to FDA and AABB regulations, with specific requirements for closed-system collection under aseptic conditions and unique FDA-approved donor identification. Delivery requirements include routine orders within 24 hours and emergency services available at all times, with some delivery windows as short as 90 minutes. Interested respondents under NAICS 621991 must provide company details, a SAM.GOV Unique Entity ID, a capability statement, and a relevant experience narrative. Mandatory certifications include FDA registration, CLIA certification, and the employment of personnel with ASCP Board of Certification. Additionally, contractors must hold the necessary licenses to operate in South Carolina, Georgia, and Alabama. Responses must be submitted via email to the primary point of contact by the specified deadline.
Blood and Organ Banks

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 221310
New
Federal
Reverse Osmosis System Preventative Maintenance - Atlanta VA Medical Center
Solicitation # 508-27-1-2043-0008
Solicitation 36C24727Q0027 is a request for quotations for corrective and preventive maintenance services for the Reverse Osmosis/Deionized (RO/DI) water purification system at the Atlanta VA Medical Center in Decatur, Georgia. The contract supports critical pathology laboratory operations, including Hematology, Serology, Microbiology, and Histology. The scope of work requires the vendor to provide all labor, materials, and OEM replacement parts for monthly maintenance, quality filter changes, emergency management, and semi-annual water quality testing. The contractor must ensure compliance with VHA guidelines, Joint Commission, and College of American Pathologist (CAP) standards, while returning equipment to optimum performance per manufacturer specifications. The base period of performance is scheduled from October 15, 2026, to October 14, 2027, with an option for a one-year extension. Award will be based on the most advantageous quotation, considering technical approach, past performance via CPARS, and fair and reasonable pricing. Key administrative requirements include monthly electronic invoicing via EFT and adherence to SDVOSB/VOSB subcontracting limitations, which prohibit paying more than 50 percent of the contract value to non-certified firms. Offerors must provide their Unique Entity Identifier (UEI) and certify compliance with FASCSA and Iran-related sanctions.
Water Supply and Irrigation Systems

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 812930
New
Federal
M1LZ-- Valet Parking Services - Base + 4
Solicitation # 36C24726Q0846
Solicitation 36C24726Q0846 is a request for quotes for valet parking services at the Charlie Norwood VA Medical Center Downtown Division in Augusta, Georgia. This firm-fixed-price contract is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and is categorized under NAICS 812930. The scope of work requires the contractor to provide parking assistance for an estimated 300 to 400 vehicles daily for veterans, patients, family members, and visitors, operating from the South Lot. Services are required Monday through Friday, from 7:00 am to 6:00 pm, excluding federal holidays. The contract structure includes a base year and four one-year option periods, spanning from October 1, 2026, through September 30, 2031. The contractor must provide a full-time supervisor, attendants, and all necessary equipment, including professional parking booths, mobile locking key cabinets, and specific signage. Operational requirements prohibit the use of cell phones while operating vehicles and mandate that all vehicles be parked by staff to maximize space. Award will be based on the best value, determined through a comparative analysis of technical capabilities, past performance, and price. Technical evaluations will focus on the offeror's plan of action and personnel, while past performance requires at least four references from the last three years. Quotes must be submitted on company letterhead by September 17, 2026, at 10:00 AM EST, with technical and price proposals submitted as separate volumes.
Parking Lots and Garages

POSTED

1 day ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS