This Government Contract opportunity from Department Of Veterans Affairs was posted on December 26, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C223--Replace Air Handling Units

Awarded
36C24624R0042Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Federal
INDEFINITE DELIVERY/INDEFINITE QUANTITY MULTIPLE AWARD CONTRACT FOR MULTIDISCIPLINE ARCHITECT-ENGINEER SERVICES IN SUPPORT OF CONSTRUCTION PROJECTS LOCATED PRIMARILY IN THE NORFOLK DISTRICT AREA OF RESPONSIBILITY (AOR)
Solicitation # W9123626R1CCA
The U.S. Army Corps of Engineers Norfolk District is soliciting proposals for an unrestricted Indefinite Delivery/Indefinite Quantity Multiple Award Contract (MATOC) to provide multidiscipline Architect-Engineer services. This procurement, conducted under the Brooks Act, aims to establish a pool of approximately six highly qualified firms to support design, planning, and construction phase services for Civil Works and Military Construction projects. While primarily supporting the Norfolk District Area of Responsibility, contract capacity may be extended to the North Atlantic Division and other Department of War Agencies upon approval. The contract features a five-year base ordering period with an estimated start date of June 2027, a total combined fee ceiling of 240 million dollars, and a maximum task order limit of 50 million dollars. Selection is based on a descending order of importance focusing on specialized experience, technical competence, professional qualifications, program management, and past performance, with knowledge of locality also considered. Firms must submit SF 330 forms and proof of professional licensure via the PIEE solicitation module. Awarded large businesses are required to submit comprehensive subcontracting plans with specific goals for various small business categories. All work must adhere to the Norfolk District Design Guide and ADAAG accessibility standards. Contract administration is governed by the RFO, DFARS, AFARS, and USACE Acquisition Instructions, with individual task orders negotiated as firm-fixed price.
W2SD Endist Norfolk

POSTED

about 2 hours ago

DEADLINE

in 14 days
NAICS: 541330
New
Federal
FTSS V Maritime COMS RFP
Solicitation # N6134026R1014
Solicitation N6134026R1014 is a request for proposals issued by the Naval Air Warfare Center Training Systems Division for the FY26 recompete of Maritime Contractor Operation and Maintenance Services (COMS), Training Systems Maintenance (TSM), and Contractor Maintenance Services (CMS). The effort focuses on the operation and maintenance of Naval Aviation Simulators located at NAS Jacksonville, Florida, and NAS Whidbey Island, Washington. This requirement is being awarded under the Field Training Systems Support (FTSS V) contract and is strictly limited to Lot 1 MAC holders. Proposals are due by November 5, 2026, at 8:30 PM. The contract utilizes a Firm Fixed Price arrangement for mobilization and performance tasks, with the potential for a six-month extension per FAR 52.217-8. Award selection will be based on a tradeoff between the Total Evaluated Price and the Technical Factor, with technical superiority rated as significantly more important than price. Additionally, offerors must be rated acceptable in the Small Business Participation Factor to be eligible for award. Contractors are required to adhere to strict cybersecurity and information handling standards, including CMMC compliance, NIST SP 800-171, and the safeguarding of Covered Defense Information. Deliverables are managed via DD Form 1423 and include various performance, funding, and quality reports. Invoicing and payment will be processed through the Wide Area Workflow (WAWF) system, with inspection and acceptance performed by the site COR and Task Order Manager at the destination.
Nawc Training Systems Division

POSTED

about 2 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The Department of Veterans Affairs Network Contracting Office 6 awarded a firm-fixed-price contract to Valhalla Engineering Group, LLC for architect-engineer services at the Salisbury Veterans Administration Medical Center in North Carolina. The contract, valued at 743,230.00 dollars, is 100 percent set aside for Service-Disabled Veteran-Owned Small Businesses. The project involves providing comprehensive design and construction period services for the replacement of air handling units in Building 42 that serve the House, Audiology, Speech, and Community Living services. The scope of work is divided into two phases. Part One requires the firm to provide schematics, design development, construction documents, and technical specifications, including the installation of temporary units to minimize downtime in the working medical facility. Part Two covers construction period services, including responding to requests for information, conducting site visits, and preparing final record drawings. The design must adhere to VA Technical Information Library standards and be completed within a projected 250 calendar day design schedule, supporting a construction phase with an estimated magnitude between 5 million and 10 million dollars.

General Info

Contract Value

$743,230

NAICS

541330 - Engineering Services

Place of Performance

VA, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

1

Award 36C24625C0015 - Replace Air Handling Units

DOCX, Low priorityaward
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Presolicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 246-NETWORK Contracting Office 6 (36C246)
Contacts1 person available
OfficeHAMPTON, VA, 23667, USA
Office AddressHAMPTON, VA, 23667, USA
Contacts
Michael ProctorContract Specialist

Full Description

Show more
Page 2 of 8 This request for A-E firm qualifications packages is 100% set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB) concerns under VAAR 852.219-73, VA Notice of Total Set-Aside for Certified Service-Disabled Veteran-Owned Small Businesses (Jan 2023) (Deviation) THIS IS NOT A REQUEST FOR PROPOSAL. THIS IS A REQUEST FOR SF 330'S ARCHITECT- ENGINEER QUALIFICATION PACKAGES ONLY. PUBLIC ANNOUNCEMENT FOR PROCUREMENT OF ARCHITECT-ENGINEERING (A-E) SERVICES: This is a request for Standard Form 330, Architect-Engineer Qualifications only. A-E Services are being procured in accordance with the Selection of Architects and Engineers Statute (Public Law 92-582), formerly known as the Brooks Act, and implemented in Federal Acquisition Regulation (FAR) subpart 36.6. All submissions will be evaluated in accordance with the below selection criteria. The Government will not pay, nor reimburse, any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. Firms will be selected based on demonstrated competence and qualifications for the required work. Any resulting award for the proposed A-E services will be procured under a negotiated Firm-Fixed Price contract. GENERAL INFORMATION: The Department of Veterans Affairs, Salisbury Veterans Administration Medical Center (VAMC), is seeking sources and intends to award a firm fixed-price contract for Architect-Engineering (A-E) firm to provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-Built Documentation, and all other related information for Project # 659-24-902, Replace Air Handling Units located at 1601 Brenner Avenue, Salisbury, North Carolina 28144. The A-E Services listed herein is being procured in accordance with the Federal Acquisition Regulation (FAR) 36.6 and VAAR 836.6. Potential contractors must be registered in SAM (www.sam.gov) and visible/certified in the SBA certification database at https://veterans.certify.sba.gov/ at time of submission of their qualifications in order to be considered for an award. As a prospective offeror for this Service-Disabled Veteran-Owned Small Business (SDVOSB) set aside, you are verifying your company meets the status requirements of a SDVOSB concern as established by VAAR 852.219-73. Pursuant to 38 U.S.C. 8127(l)(2), all interested firms are required to submit the certification at VAAR 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction (Jan 2023) (Deviation) with their qualification package. The Government will not consider submissions from firms that do not provide the signed certification, and all such responses will be deemed ineligible for evaluation and award. The Salisbury VA Medical Center is a working facility and phasing plans for minimizing downtime, and provisions for continuation of service during outages is critical to this project. Point of Contact: Michael Proctor, Contract Specialist Email: michael.proctor2@va.gov PROJECT INFORMATION: Project No. 659-24-902 Project Title: A-E: Replace Air Handling Units Salisbury VA Medical Center 1601 Brenner Avenue Salisbury, North Carolina 28144 The NAICS Code for this procurement is 541330, Engineering Services, and the applicable Small Business Size Standard is $22.5 million annual revenue. The projected award date for the anticipated A-E contract is on or before July 08, 2024. The NAICS code for the anticipated Construction project is projected to be 236220 and magnitude of construction is predicted to be between $5,000,000 and $10,000,000. The anticipated award date of the construction phase of the project is to be determined (TBD). An Architect & Engineer (A-E) contract will be negotiated for the development of complete construction documents which include working drawings, specifications, reports, and construction period services. The A-E will be given written information; participate in project planning meetings, pre-proposal meeting, and pre-construction meeting as required; communicate with VA personnel via telephone or e-mail; and is expected to coordinate so that the final documents include all requirements in accordance with industry standard practices, VA standards, VA design manuals, and review comments. STATEMENT OF TASK/SCOPE OF WORK: 1. GENERAL INTENT: The Contractor (herein referred to as A/E ) shall provide Architect/Engineer (A/E) services to design a construction project at the W.G. (Bill) Hefner VAMC, Salisbury in accordance with this design scope of work. 2. STATEMENT OF WORK: A/E Part One Services (also known as Design Phase) for this design project includes site visits, field investigation, studies and user interviews to prepare drawings, specifications and cost estimates for all facets of work and disciplines/trades to facilitate a construction project of replacing and/or rebuilding existing Air Handling Units (AHU) in Building 42. The scope of this project includes but not limited to the following infrastructure improvements: Installation of temporary AHU units with full controls at the chiller plant during replacement and/or rebuilding in place of ten AHUs that serve Building Houses, Audiology, Speech, and Community Living services. Refer to VA Technical Information Library (TIL) (www.cfm.va.gov/TIL ) which provides standards for all VA planning, design, and construction projects. A/E Part Two Services of this design project (also known as Construction Period Services) includes responding to construction contractor Requests For Information (RFIs) during the solicitation (solicitation support) and construction phases of the construction project, attendance at pre-bid, post-award and commissioning kick off construction project conferences, review of construction material submittals and shop drawings, approximately 4 site visits per month during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications, preparation of site visit reports, coordination with project commissioning requirements, review of any construction project modifications for cost and technical acceptability, attendance and participation during the final acceptance inspection, preparation of the punch list and preparation of record drawings of the completed construction project based on the construction contractor s as-built drawings. The A/E shall prepare a submittal log to be utilized by the VA during construction period services, maintain RFI log and provide meeting minutes for weekly construction meetings throughout the duration of construction. The above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for design of this project. The A/E shall initiate detailed inspection of the project site to determine the needs and conditions for the design of this project. Copies of W.G. (Bill) Hefner VAMC, Salisbury record drawings and A/E will verify the validity of the record drawings prior to the start of design work and conduct site investigations as necessary throughout the design. The A/E shall be solely responsible for the management, including all associated labor, equipment, materials, mailing costs, and inspection, to meet the requirements of the design project. The A/E shall further provide meeting minutes for all meetings held under this design project. 3. DESIGN WITHIN FUNDING LIMITATIONS: The design shall be prepared by the A/E to permit the award of a construction contract, using Federal Acquisition Regulation procedures for the construction of the facilities, at a cost that does not exceed the project s estimated construction contract price of $6,797,000. 4. DESIGN INDEPENDENCE, FURNITURE AND EQUIPMENT: Designs for construction must produce a complete and usable facility or improvement when constructed. VA policy (VHA Office of Capital Assets Management, Engineering and Support memo Updated Construction Guidance and Expectations dated Sep 12, 2016) requires the A/E to certify that their design (including all bid alternates/bid deducts) is independent of any future construction project. In addition, the A/E must certify that it has produced a design that does not include furniture and equipment that will be procured separately. Equipment that can be part of the design in the includes those items to meet code requirements for building occupancy, items covered in the VA s Master Construction Specifications (PG-18-1) Divisions 1 through 10, 13 through 26 or 28 through 48, non-IT equipment items covered by Division 27 and items covered by Division Numbers 12 31 00, 12 32 00, 12 34 00 and 12 36 00. The A/E shall submit as part of the Final Bid Documents submittal a signed letter on company letterhead stating the design s independence. 5. DESIGN CRITERIA: The VA Technical Information Library (TIL) available at http://www.cfm.va.gov/til/index.asp is managed by the VA Office of Construction and Facility Management and is the master repository for all VA Numbered Standards for Construction to include design and construction specifications, procedures, standard details, building information modeling (BIM)/computer-aided design (CAD) standards, equipment guides, space planning and design guides. The documents of the TIL shall be the minimum design criteria for all VA projects performed in the construction of new facilities and the modernization, alteration, addition, or improvement of its real property. All design documents shall be developed in accordance with the VA TIL, including (but not limited to) the following listed Department of Veterans Affairs References: PG-18-1 Master Construction Specifications SOW Attachment 01 VHA Required Division 01 Specification Section List PG-18-3 Design and Construction Procedures [Including but not limited to: Codes, Standards, and Executive Orders] PG-18-4 Standard Details and CAD Standards PG-18-5 Equipment Guide List H-18-8 Seismic Design Handbook PG-18-9 Space Planning Criteria PG-18-10 Design Manuals (by discipline) [Including but not limited to: Guiding Principles checklists as indicated for Minor Projects in Sustainable Design Manual, Life Cycle Cost Analysis] PG-18-12 Design Guides (graphical, by function) PG-18-13 Barrier Free Design Guides PG-18-14 Room Finishes, Door, and Hardware Schedules PG-18-15 Minimum Requirements for A/E Submissions PG-18-17 Environmental Compliance Manual H-7545 VA Cultural Resource Management Procedures OIT Infrastructure Standard for Telecommunications Spaces v3.0 (21 August 2020) The following references should also be used to complete the design documents: American National Standards Institute (ANSI) American Society for Testing Materials (ASTM) Building Industry Consulting Service International (BICSI) Federal Communications Commission (FCC), all Regulations, Procedures and Standards for Two-Way Radio Equipment, Systems and Operation Illuminating Engineering Society of North America (IESNA) Institute of Electrical and Electronic Engineers (IEEE) International Organization for Standardization (ISO), Standards for Protocols and Interfaces that include Open System Interconnections (OSI) Joint Commission on Accreditation of Healthcare Organizations (JACHO), Environment of Care Guidelines and Standards Facilities Guidelines Institute (FGI): 2010 , or most current issue, Guidelines for the Design and Construction of Health Care Facilities U.S. Green Building Council (USGBC) LEED Program & Sustainable Building Design Council The Green Building Initiative (GBI), Green Globes Environmental Assessment and rating System The American Institute of Architects (AIA) and National Society of Professional Engineers(NSPE) recent additions to their professional codes of ethics encouraging environmentally responsible design National Fire Protection Association (NFPA): A/E shall pay particular attention to the following publications: NFPA 20 Standard for the Installation of Stationary Pumps for Fire Protection NFPA 70 National Electrical Code NFPA 70 E Standard for Electrical Safety Requirements for Employee Workplaces NFPA 72 National Fire Alarm Code NFPA 75 Standard for the Protection of Electronic Computer/Data Processing Equipment NFPA 77 Recommended Practice on Static Electricity NFPA 80 Standard for Fire Doors and Fire Windows NFPA92A Recommended Practice for Smoke-Control Systems Page 2 -11 Architectural Design Manual August 1, 2014 CHAPTER 2: GENERAL REQUIREMENTS NFPA92B Guide for Smoke Management Systems in Malls, Atria, and Large Areas NFPA 99 Standard for Healthcare Facilities NFPA99B Standard for Hypobaric Facilities o NFPA 101 Life Safety Code NFPA 110 Standard for Emergency and Standby Power Systems o NFPA 780 Standard for the Installation of Lightning Protection Systems National Electrical Manufacturers Association (NEMA) Underwriters' Laboratories, Inc. (UL) Where conflicts exist between VA adopted codes and standards and the documents on the TIL, the A/E shall bring this to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure consistency department wide. 6. DESIGN COLLABORATION: The A/E during this design project shall collaborate with the VHA Office of Healthcare Environment and Facilities Programs Special Engineering Program (HEFP/SEP) staff, VISN 6 and the Independent Life Safety Review Agent (LS Agent) for the project. Design submittal comments from these contractors, if concurred with by VA, shall be incorporated into the design. HEPF/SEP and/or VISN deliverables shall be coordinated with the A/E s design submittals to ensure compliance with all requirements are met. The A/E is required to ensure all elements of the design adhere to the Life Safety Code, including recommendations for temporary construction barriers, prior to the Independent Life Safety review. 7. INDEPENDENT LIFE SAFETY REVIEW: It is VHA policy that independent third-party fire protection code reviews will be provided for delegated construction projects by qualified fire protection engineers, and that qualified fire protection engineers will be part of the design team for selected projects, in accordance with the requirements of VHA Directive 7712. 8. ENVIRONMENTAL PROTECTION: The A/E shall assist the VA with completion of a National Environmental Policy Act (NEPA) assessment as required by the W.G. (Bill) Hefner VAMC, Salisbury, NC. If the NEPA assessment results in potential environmental impacts, the A/E shall be responsible for completing any auxiliary documentation required per PG-18-17 NEPA Interim Guidance for Projects located on the TIL (http://www.cfm.va.gov/til/etc/NEPAGuidance.pdf). Additional requirements may include, but are not limited to, Environmental Assessment, Environmental Impact Statement, and Record of Decision. The NEPA analysis and concluding documentation must be completed by the Final Bid Documents submittal. 9. PHYSICAL SECURITY: The A/E must include a certified physical security specialist. The specialists must be involved with the design beginning with the concept phase and the qualifications must be submitted to the Contracting Officer Representative (COR) for review and approval prior to the concept/basis of design phase. The specialists shall meet the specific requirements listed in the Physical Security Design Manual for Mission Critical Facilities located on the TIL (https://www.cfm.va.gov/til/PhysicalSecurity/dmPhySec.pdf ). The A/E shall ensure that all aspects of the applicable VA Physical Security Design Manual (either Life-Safety Protected or Mission Critical Facilities; both will be applicable depending on the area the work is taking place) are incorporated into the design and shall prepare a written report acknowledging compliance as required by the VAMC. The A/E must inform the COR of any physical security items that will be difficult to achieve during the concept/basis of design phase of the design and assist the VA with waiver requests as necessary. 10. HVAC DESIGN: In accordance with HVAC DESIGN MANUAL, November 2007, Rev August 1, 2023. (https://www.cfm.va.gov/til/dManual/dmHVAC.pdf) 11. SUBMITTAL REQUIREMENTS: Design submittals shall follow the requirements of Program Guide, PG-18-15, Volume C - A/E Submission Instructions for Minor and NRM Construction Program dated November 2008. Submittal documents shall be prominently marked For Official Use Only (FOUO) if they contain qualifying data as defined in Veterans Health Administration (VHA) Memorandum 2019-11-13 Sensitive Infrastructure Data Classification For Official Use Only (FOUO). The A/E shall deliver design submittal documents that follow the iterative phase breakdown for design work in PG-18-15 and as additionally specified below. Specific requirements for each discipline/work product listed under each phase can be found in PG-18-15; it is expected for the phase of design that each of the checked items in the SD/DD/CD columns will be completed for the submittal. The A/E shall attend a review meeting following each design submittal as indicated under the Project Schedule section of this Scope of Work. Each new submittal will incorporate all VA comments from the previous submittal. The Asbestos Abatement requirements in PG-18-15 are applicable at W.G. (Bill) Hefner VAMC, Salisbury due to the age of the campus (construction began in 1950 s). The following submittals will be required for this project: Quality Assurance/Quality Control (QA/QC) Plan Basis of Design (BD) - 10% - In addition to the requirements in PG-18-15, a Basis of Design is required. Basis of Design is a narrative presentation of facts, sufficiently complete, to demonstrate that the project concept is fully understood, and that subsequent design details, and their ultimate presentation in the final drawings and specifications, will be based on sound architectural and engineering decisions. Conceptual drawings of the planned design and the initial cost estimate will additionally be included. Schematic Design (SD)- 35% Design Development One (DD) 65% Construction Documents (CD)- 95% Final Bid Documents (Bid) 100% 12. DRAWING FORMAT: All drawings shall adhere to VA project software requirements for [Building Information Modeling (BIM) OR Computer Aided Design (CAD)] available at http://www.cfm.va.gov/til/projReq.asp. BIM software shall be Revit/CAD 2019 or the latest version available to W.G. (Bill) Hefner VAMC, Salisbury. The A/E shall provide a computer 3D model and prepare various 3D renderings to present to VA throughout the design phase to adequately represent architectural, mechanical/electrical/plumbing (MEP), site conditions and other items in the design to aide with facility visualization and contractor coordination. The project BIM model minimum requirements shall be developed to include the systems described below as they would be built, the processes of installing them and to reflect record drawing conditions (possibly incorporating into the W.G. (Bill) Hefner VAMC, Salisbury Master Record Drawing pending facility expertise). The deliverable model at the SD, DD and CD design phases shall be developed to include as many of the systems described below (but not limited to) as are necessary and appropriate at that design phase. Architectural/Interior Design Square Footage/Volume Room Names and Numbers Architectural Schedules Architectural Specialties and Woodwork Doors Windows Louvers Roof Floors Ceilings Vertical Circulation Walls/Curtain Wall Sizes, Shapes, & Material Data General Signage Schedules Furniture Equipment Structural Foundations Shafts and Pits Mechanical HVAC Plumbing Electrical/Telecommunications Power and Lighting Steam Distribution Other Engineering Data as Required Exterior Building Information Nurse Call System Asbestos/Hazardous Material Info Security System Information (Access Control, Security Cameras, Panic Alarms, Overhead Paging) Life Safety Information (Fire Extinguishers, Wall Ratings, Door Ratings, Fire Protection/Alarms) Departmental Ownership (By Common Name, Capital Asset Inventory Department Definition and Strategic Capital Investment Program Department Definition) 13. SUBMITTAL FORMATS: Submittals shall be submitted in electronic format and hard copy formats as listed below. Portable Document Format (.pdf), Microsoft Office Suite formats (.doc, .xls, and .ppt), Microsoft Project (.mpp) and Autodesk Revit Project (.rvt) files are acceptable. Submittals shall additionally be compliant with Section 508 of the Rehabilitation Act (29 U.S.C. '794 d); information on the requirements for accessible media can be found at http://www.section508.gov/. The A/E shall be responsible for providing: Meeting/Conference Minutes Meeting minutes for all formal meetings and conferences held with the VA; including weekly construction meetings. Meeting minutes shall be submitted within seven (7) calendar days of the meeting or conference. All documents in any of the electronic formats listed above. Minimum meeting minutes requirements Project name, number, meeting host, Meeting Name Date, Time, meeting ID, call in number, Duration, and consecutive number of total related meetings Participant list (Name, Title, Phone number (office and Mobile), Email, Attended Meeting (yes/no Check box) Meeting purpose, Roll call, COVID-19, and Additional Items Agenda items (Decisions, action items, and fixes or next steps) Next meeting date and time Detailed attachment list Construction Cost Estimates Construction cost estimates shall comply with Manual for Preparation of Cost Estimates & Related Documents for VA Facilities dated March 8, 2011. This document is available on the TIL at http://www.cfm.va.gov/cost/index.asp. All estimates in any of the electronic formats listed above. Quality Assurance/Quality Control (QA/QC) Plan All documents in any of the electronic formats listed above. Basis of Design (BD) All documents in any of the electronic formats listed above. Two (2) half-size paper bond sets of drawings 2 to VA Schematic Design (SD) All documents in any of the electronic formats listed above. Two (2) half-size paper bond sets of drawings 2 to VA Two (2) paper bond sets of specifications 2 to VA Two (2) paper bond sets of investigation reports, design calculations, space planning data and cost estimate - 2 to VA Design Development (DD), and Construction Documents (CD) All documents in any of the electronic formats listed above. Memo annotating what was not upgraded and corresponding justifications. One (1) full size paper bond sets of drawings - 1 to VA Two (2) half-size paper bond sets of drawings 2 to VA Two (2) paper bond sets of specifications 2 to VA Two (2) paper bond sets of investigation reports, design calculations, space planning data, construction schedule, construction statement of work (SOW) and cost estimate - 2 to VA Final Bid Documents (Bid) PDF files of drawings, specifications, and any miscellaneous design analysis documents such as submittal log and physical security compliance report. Certified memo annotating what areas/times were not upgraded and the corresponding justifications. Certified memo that the A/E design is independent of future projects and includes all equipment required for the project to be activated/full functional. Word files of specifications. Revit and AutoCAD files of drawings. One (1) full size paper bond sets of drawings - 1 to VA Two (2) half-size paper bond sets of drawings 2 to VA Two (2) paper bond sets of specifications 2 to VA One (1) paper bond sets of investigation reports, design calculations, space planning data, construction schedule, construction SOW and cost estimate - 1 to VA Construction Period Services (CPS) Requests for Information (RFI) Requests for Information shall be submitted within three (3) calendar days of submittal to the A/E. Submittal Reviews Submittal reviews shall be submitted within seven (7) calendar days of submittal to the A/E. Site Visit Reports Site visit reports shall be submitted within seven (7) calendar days of the visit. All documents in any of the electronic formats listed above. Modification/Change Order Requests Modification requests shall be submitted within seven (7) calendar days of submittal to the A/E. This includes the review of the contractor s change order/modification proposal for construction change orders, as well as the formulation of an IGCE for the modification, as requested. The A/E's reply regarding his/her review of cost proposals and his/her recommendations shall include an independent breakdown of costs in detail, quantities, and unit prices and shall cover both additions and deductions of labor, materials, and equipment. The A/E shall also supply cost estimates as requested by the COR for Request for Proposals for anticipated changes. All documents in any of the electronic formats listed above. Note - If major modification, VA will provide additional time and document format guidance. Punch List Punch list shall be submitted within seven (7) calendar days of the final acceptance inspection. All documents in any of the electronic formats listed above. Record Drawings Record drawings shall be delivered to the VA within thirty (30) calendar days after VA acceptance of the construction project. Autodesk Revit Project (.rvt) format and AutoCAD (.dwg) format. 14. PROJECT SCHEDULE/PERIOD OF PERFORMANCE: The A/E shall perform Part One Services/Design Phase work according to the schedule shown below. The A/E is also responsible for following specification Section 01 32 16.10 Architectural And Engineering CPM Schedules, which is located in SOW Attachment 05 - 01 32 16.01 EHRM Architectural and Engineering CPM Schedule. If a due date on the timeline below falls on a Holiday or Weekend, the submittal shall be due the following business day. The remaining timeline will not be shifted to accommodate Holidays or Weekends. Administrative Time 15 calendar days after receipt of Issuance of Award QA/QC Submittal & Basis of Design (BD) 10% Submittal 10 calendar days after end of Administrative Time QA/QC and BD 10% Submittal Review Meeting 15 calendar days after VA receipt of QA/QC & BD 10% Submittals 35% SD Submittal 30 calendar days after acceptance of QA/QC & BD 10% Submittals 35% SD Review Meeting 20 calendar days after VA receipt of 35% SD Submittal 65% DD Submittal 40 calendar days after VA acceptance of 35% SD Submittal 65% DD Review Meeting 20 calendar days after VA receipt of 65% DD Submittal 95% CD Submittal 60 calendar days after VA acceptance of 65% DD Submittal 95% CD Review Meeting 20 calendar days after VA receipt of 95% CD Submittal Final Bid Documents Submittal 10 calendar days after VA acceptance of 95% CD Submittal Final Bid Documents Acceptance Meeting 10 calendar days after VA receipt of Final Bid Documents Submittal Total Part One Services/Design Phase Schedule 250 calendar days *Note: 180 Calendar days for Contracting Total Part Two Services/Construction Phase Schedule 365 Calendar Days for Construction The 250 calendar days listed in part one project schedule may fluctuate based on when 95% CD submittal meets all VA guidelines and acceptance is issued. If 95% CD submittal is not accepted due to insufficient design requirements throughout the design period and additional time is deemed necessary. It is the responsibility of the AE firm to cover all costs associated with such delays. Part Two Services/Construction Period Services shall be performed during construction period. 15. CONTRACT OVERSIGHT: All contracts for this project shall be awarded MCP 6-VA Healthcare network. (NCO6); only a warranted VA Contracting Officer shall have authority to change the terms and conditions of a contract. These changes may involve the contract award amount, contract period of performance, issuance of stop work orders and changes to the statement of work. PCAC shall designate a Contracting Officer s Representative (COR) to monitor and manage the A/E s performance under the design project contract. The COR shall be a representative of the W.G. (Bill) Hefner VAMC, Salisbury Engineering Service Project Section and have the technical knowledge required to monitor and oversee the project. A COR from the W.G. (Bill) Hefner VAMC, Salisbury Engineering Service Project Section shall also be designated for the construction project contract to monitor and manage the construction contractor s performance under the construction project contract. This designation under the construction contract shall be considered equivalent to the industry standard of Owner s Representative and does not supersede or eliminate the A/E s responsibility for Part Two Services/Construction Period Services. The A/E ultimately shall be responsible for any errors and omissions with the design discovered during and after the construction phase. 16. REPORTING REQUIREMENTS: The Contractor shall be required to report to Building 15 to their respective COR to be badge for working hours and as well as after normal working hours. This check-in is mandatory. When the service is completed, the Contractor shall document services rendered on a legible field service report. The Contractor shall return to the same service and building to submit the field service report to the COR for signature during normal working hours or leave the service ticket in/at the room/mail/box location as directed by the COR. 19. SOW and ATTACHMENTS: The following list of documents are attached to this SOW for A/E use and incorporation into the project documents: Salisbury VAMC Design and Construction Manual Dec 19 (Attachment 001) Design shall comply with VA guidelines and specifications. Design manuals and specifications can be found at http://www.cfm.va.gov/TIL/. Design shall also meet all applicable codes and standards. Proposed work is located at Salisbury VA Medical Center; Building 42. A-E SELECTION PROCESS: The agency has convened an evaluation board for the evaluation of responses to this notice. Responses will be evaluated in accordance with the Selection of Architects and Engineers Statute (Public Law 92-582), formerly known as the Brooks Act, and implemented in Federal Acquisition Regulation (FAR) 36.6. Specifically, SF 330 submissions will be evaluated to identify the most highly qualified firms, using the selection criteria identified below. Discussions will be held with at least three (3) of the most highly qualified firms, in accordance with FAR 36.602-3(c). The processes at FAR 36.602-4 and FAR 36.606 will then be followed. Selected firms will be notified by telephone or email of selection and provided further instructions. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, and publicly available sources. Failure to provide requested data, accessible points of contact or valid phone numbers could result in a firm being considered less qualified. All projects provided in the SF330 must be completed by the office/branch/individual team member performing the work under this contract. SELECTION CRITERIA: Evaluation and selection of firms will be based on submissions and direct responses to the following criteria which are numbered in descending order of importance: 1. Specialized experience and technical competence (sections F and H) in the design of project includes but not limited to the following infrastructure improvements: Replacement of nine AHUs that serve Building Houses, Audiology, Speech, and Community Living services. The evaluation may consider other elements such as project phasing to maintain hospital operations during construction, quality control procedures and familiarity with VA Design Guides/Manuals, Master Specifications, and other applicable standards. Additionally, prior experience of the prime and key subcontractors working together on relevant projects, as indicated i...

More opportunities from Department Of Veterans Affairs → 246-NETWORK Contracting Office 6 (36C246)

Same awarding agency

NAICS: 562111
New
Federal
S205--Solid Waste Disposal Services Salem VAMC
Solicitation # 36C24627Q0046
The Department of Veterans Affairs, Network Contracting Office 6, is soliciting quotes for solid waste and recyclable materials removal services at the Salem VA Medical Center in Salem, Virginia. This is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under NAICS code 562111. The contract structure consists of a base year plus four one-year options. The scope of work requires the contractor to provide fire-retardant storage containers of various sizes, ranging from 2 to 40 cubic yards, and perform regular waste removal and pick-up services across multiple building locations. Key requirements include the assignment of a non-delegable onsite representative to conduct initial and quarterly waste assessments, strict adherence to OSHA and EPA regulations, and monthly steam-cleaning of metal compactor containers. Award will be based on the best value offer, evaluating technical and management approach, past performance within the last three years, and total price including all option years. Offerors must be registered in the System for Award Management (SAM) and certify compliance with limitations on subcontracting, ensuring no more than 50 percent of the contract value is paid to non-SDVOSB or non-VOSB firms. Performance will be monitored via a Quality Assurance Plan involving random inspections by the COR, with monthly reviews to ensure quality standards are met. Invoices must be submitted electronically through the VA's Electronic Invoice Presentment and Payment System.
Solid Waste Collection

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details
NAICS: 238220
New
Federal
4120--RENTAL OF TWO CHILLERS FOR ONE YEAR
Solicitation # 36C24627Q0086
The Department of Veterans Affairs, Network Contracting Office 6, is soliciting a firm-fixed-price contract for the rental of two 400-ton low-temperature air-cooled chillers to provide uninterrupted cooling services at the Charles George VA Medical Center in Asheville, North Carolina. The period of performance is scheduled from December 11, 2026, to December 10, 2027. These temporary units are required to maintain appropriate temperatures in Building 15 and Building 47 while permanent repairs and replacements are executed. The contractor is responsible for the delivery, installation, and regular maintenance of the equipment, including the submission of monthly maintenance reports and the immediate resolution of any malfunctions. This procurement is a total set-aside for verified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 238220. Award evaluation is based on technical capability, past performance within the last three years, and price. Technical evaluations focus on the contractor's ability to comply with HIPAA, VA criteria, NFPA, OSHA, and local building codes, as well as the quality of their contingency plans. Quotes must be submitted via email to the contracting officer by October 30, 2026, and must include a signed SF 1449, a pricing schedule, and a completed VAAR 852.219-76 certificate of compliance. Payment will be processed monthly in arrears through the VA Financial Services Center via electronic funds transfer.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 237110
New
Federal
Z2NZ-- 658-23-108 Correct Stormwater Drainage
Solicitation # 36C24626B0031
Project 658-23-108 is a sealed bidding construction project for the Department of Veterans Affairs to correct stormwater drainage at the Salem VA Medical Center in Salem, Virginia. The scope of work includes providing all labor, materials, equipment, and supervision to install outside storm sewer systems and underground water distribution for domestic and fire supply systems, including piping and structures. The estimated magnitude of construction is between $10,000,000 and $20,000,000, with a performance period of 450 calendar days from the issuance of the Notice to Proceed. This contract is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 237110. The prime contractor must be a certified SDVOSB and is required to perform at least 15% of the construction work. Key personnel requirements include a dedicated full-time Superintendent, a CQC System Manager, and an SSHO. Bidders must have completed three projects of similar complexity and value within the last three years and must not have serious EPA or OSHA asbestos violations in that same timeframe. The procurement follows FAR Part 14 Sealed Bidding procedures. Bidders must be registered in the System for Award Management (SAM) and provide a bid guarantee of at least 20% of the bid price, capped at $3,000,000. Technical requirements include compliance with the 2010 MEP Correction Code, ADA accessibility standards, and EPA quality standards. Final acceptance is contingent upon a formal inspection, and the contractor must submit a Quality Control Plan at least two business days prior to the coordination meeting.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 20 days
View Details
NAICS: 623220
New
Federal
Q402--Medical Respite Transitional Housing
Solicitation # 36C24627Q0019
The Department of Veterans Affairs Network Contracting Office 6 is soliciting quotes for a firm fixed price Indefinite Delivery Indefinite Quantity contract to provide off-site Medical Respite Transitional Housing for homeless Veterans within the Salisbury VA Health Care System region. The program serves Veterans who require recuperative care and medical respite but do not need hospital-level care, providing a safe environment for those for whom typical emergency housing is unsuitable. The facility must be located within 50 miles of the Salisbury VA Medical Center or 25 miles of a Community Based Outpatient Clinic or Health Care Center. The contract includes a base period from January 1, 2027, to December 31, 2027, with four subsequent option years, with a final delivery date not exceeding December 31, 2031. The facility is expected to serve between 3 and 10 Veterans per day. Required services include 24/7 accessible accommodations meeting ADA standards, three nutritionally adequate meals daily, case management, individualized care plans, and medication monitoring. The contractor must implement strict security and privacy protocols, including HIPAA compliance and the secure storage of personal health information. Performance is monitored via a Quality Assurance Surveillance Plan, with a specific focus on critical incident reporting within 24 hours and monthly safety plan reviews for high suicide risk Veterans. This is a total small business set-aside under NAICS 623220. Award will be based on best value, evaluating technical capability, a multidisciplinary facility inspection, past performance, and price.
Residential Mental Health and Substance Abuse Facilities

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 562111
New
Federal
J045--SOLID WASTE REMOVAL
Solicitation # 36C24626Q0898
The Department of Veterans Affairs Network Contracting Office 6 is soliciting quotes for comprehensive solid waste, garbage, and recycling collection and disposal services at the Richmond Central Virginia VA Health Care System. This is a firm-fixed-price IDIQ contract set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The period of performance consists of a base year ending September 30, 2027, with three subsequent one-year options, potentially extending through September 30, 2030. The scope includes the scheduled removal of waste from various containers, including 42 CY and 35 CY compactors, as well as the management of universal waste such as batteries and lamps. The contract specifically excludes hazardous chemical and radioactive waste, and regulated medical waste is handled under a separate agreement. The contractor is responsible for providing clean, serviceable containers and managing the collection of mixed recyclable metals and miscellaneous yard waste. While the VA maintains ownership and responsibility for the repair of the Sani-Pak compactor and baler, the contractor is responsible for hauling and emptying the receivers. Award will be based on a best-value determination, where technical approach and past performance combined may be weighted more heavily than price. Key requirements include compliance with SDVOSB subcontracting limitations, maintaining minimum general liability insurance of 500,000 dollars, and adhering to strict packaging and labeling standards for universal waste. Total estimated tonnage for the requirement is 1,800 tons.
Solid Waste Collection

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 621511
New
Federal
Q501--STAT CLINICAL LAB TESTING AND AUTOPSIES
Solicitation # 36C24627Q0076
The Department of Veterans Affairs, Network Contracting Office 6, is conducting market research through a Sources Sought Notice to identify qualified businesses capable of providing comprehensive referral laboratory testing, specimen transportation, and autopsy services. The primary service area includes the Hunter Holmes McGuire VA Medical Center and associated Central Virginia VA Health Care System locations. The scope of work encompasses clinical and anatomic pathology requirements, including analytical testing, the processing and maintenance of specimen integrity, STAT testing, and medical autopsy services involving gross and microscopic examinations. The contractor will also be responsible for providing secure specimen transportation, consultative services for test selection and interpretation, and electronic access to patient results. This opportunity is open to various small business concerns, including SDVOSBs, VOSBs, 8(a), HUBZone, WOSB, and EDWOSB entities, under NAICS code 621511 with a size standard of 45.5 million dollars. Providers must maintain strict compliance with HIPAA regulations and hold essential certifications, such as CLIA and CMS-deemed status through organizations like the College of American Pathologists or The Joint Commission. Interested parties must submit a capability statement not exceeding five pages to Gordon Burns by October 27, 2026, at 1:00 p.m. ET. This notice is for acquisition planning purposes only and does not constitute a formal solicitation or a guarantee of a future contract award.
Medical Laboratories

POSTED

2 days ago

DEADLINE

in 6 days
View Details
NAICS: 811198
New
Federal
Golf Cart Maintenance
Solicitation # 36C24627Q0057
Solicitation 36C24627Q0057 is a request for quotations from the Department of Veterans Affairs, Network Contracting Office 6, for a base year plus four option year service contract. The contract requires the provision of all personnel, tools, diagnostic equipment, and transportation necessary to perform preventive maintenance, inspection, troubleshooting, and repair services for a fleet of 39 government-owned golf carts and utility vehicles at the Hampton VA Medical Center in Hampton, Virginia. Services may be performed on-site or at the contractor's off-site facility, with the contractor responsible for the pickup and return of vehicles. Key deliverables include adhering to manufacturer-recommended maintenance schedules, acknowledging service calls within one business day, and submitting complete service reports for all work performed. This procurement is designated as a Service-Disabled Veteran-Owned Small Business set-aside, and the contractor must comply with limitations on subcontracting by not paying more than 50 percent of the government-paid amount to firms that are not VIP-listed SDVOSBs or VOSBs. The government intends to make a single award based on technical acceptability and the lowest total evaluated price, which will include the base requirement and all option years. Per Amendment 0001, the response deadline has been extended to October 22, 2026, at 10:00 AM ET. Quotations must include a signed Standard Form 1449, pricing on company letterhead, active SAM registration, and a signed certificate of compliance regarding subcontracting limitations.
All Other Automotive Repair and Maintenance

POSTED

2 days ago

DEADLINE

in about 24 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS