Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Connecticut was posted on January 14, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cabin Rd Colchester Treatment Plant updates

Closed
RFP-RFQ 2024 -15AState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

Place of Performance

CT, USA

Set-Aside

NONE

Documents

2

RFP-RFQ 2024-15A: Cabin Rd Colchester Treatment Plant updates

PDF, High priority: read this firstrfp
High

RFP-RFQ 2024-15A: Cabin Rd Colchester Treatment Plant updates

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Jan 24, 2025 to Jan 21, 2025.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → Town of Colchester
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Cabin Road Treatment Plant Upgrades Scope of Work Summary: Selective demolition work as indicated below or shown on the Drawings. 1. For Existing Filters 1 and 2- (Presently off-line) a. Remove and dispose of the concrete ballast in the lower portion of the vessels. b. Remove and dispose of existing PVC underdrain system inside the vessels. c. Remove filter face process piping only as indicated on drawings. d. Construct new flanged piping connections as indicated on drawings. e. Provide interior and exterior coating system on filters (See Section 09-901) f. Pressure test filter vessels. f. Other items as shown on the Drawings. 2. For Existing Filters 3, 4 and 5- (Presently On-line) a. Once work on Filters 1 and 2 have been completed, and are back on-line, schedule taking off-line one at a time filters 3, 4 and 5 for improvements including existing media removal, modifications to underdrains, installation of new air distribution piping and new filter media replacement.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS