Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on July 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CABLE ASSY,AIRCRAFT

Awarded
SPRPA125QES37Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332710
New
Federal
59--CHASSIS,ELECTRICAL-, IN REPAIR/MODIFICATION OF
Solicitation # N0010426QYAFE
Solicitation NO0014-26-Q-YAFE, issued by NAVSUP Weapon Systems Support, seeks quotations for the teardown, evaluation, repair, and potential modification of electrical chassis (NSN 7HH 5975-01-689-3871). The objective is to restore Government Furnished Property to an operable condition, defined as functioning and performing as a new unit. The requested Repair Turn Around Time (RTAT) is 39 days, and the government reserves the right to exercise an option for increased quantity up to 100 percent of the initial requirement within 365 days of award. The closing date for submissions is October 23, 2026, at 4:30 PM local time. Offerors must provide an estimated repair price for the full effort and include the cost of new items for evaluation purposes. Following the receipt of carcasses, vendors have 90 days to complete a teardown and evaluation before submitting a firm-fixed-price quote. If the offeror is not the Original Equipment Manufacturer, they must provide the OEM's name, CAGE code, and a signed letter of authorization. Technical requirements include strict adherence to MIL-STD-130 for marking, MIL-STD-2073-1 for packaging, and a total prohibition of metallic mercury. Award evaluations will consider price, capacity constraints, and risk assessments via the Supplier Performance Risk System. All payments will be processed electronically through the Wide Area Workflow system.
Navsup Weapon Systems Support Mech

POSTED

about 14 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This contract pertains to the repair and overhaul of the Aircraft Cable Assembly (CABLE ASSY,AIRCRAFT; NSN 4920-014974067; Part Number 3654AS5180-1) for DLA Aviation in Philadelphia under solicitation number SPRPA125QES37. It requires the contractor to repair, test, inspect, and return the item to a Ready for Issue (RFI) condition, adhering strictly to current technical drawings and specifications. All repairs must follow approved manuals and written procedures, with any deviations requiring prior authorization through formal government channels. The contractor is responsible for providing all required parts, materials, labor, tooling, and facilities, as the government will not furnish equipment or property unless specifically stated. The contract also sets forth detailed procedures for handling items determined Beyond Economical Repair (BER), Missing on Induction (MOI), or those requiring Over and Above Repair (OAR), all requiring written government concurrence before further action. Eligibility to bid requires offerors to demonstrate the capability to perform all required repairs according to the NAVAIR-controlled specifications and maintain a quality system compliant with ISO 9001/SAE AS9100, as well as a suitable calibration system. The evaluation for award will consider price, delivery timeframe, and past performance, with non-price factors collectively weighted approximately equal to price. The proposal submission deadline is extended until July 30, 2025, and all correspondence and submissions must be directed to the specified DLA point of contact, Shantell Lawrence. The contract incorporates clauses ensuring compliance with equal opportunity, Buy American requirements, and warranty terms, and is issued under emergency acquisition rules, waiving the usual public synopsis due to urgency. Packaging, storage, and marking requirements are defined to ensure proper handling and protection of the repaired items.

General Info

Repair and overhaul Aircraft Cable Assembly, meet specs, ISO 9001/AS9100, deadline July 30, 2025.

Contract Value

$126,168.3

NAICS

332710 - Machine Shops

Place of Performance

PA, USA

Set-Aside

NONE

Awardee

ATEC INC

Award Issued Date

Documents

3

SPRPA125QES370001.pdf

PDF

SPRPA125QES370002.pdf

PDF

SPRPA125QES37.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseAwarded
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 12, 2025 to Jul 30, 2025. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Pa DLA Aviation At Philadelphia
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|.||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|.|| TIME OF DELIVERY (JUNE 1997)|20| | | | | | ||||||||||||||| DESIRED AND REQUIRED TIME OF DELIVERY (JUNE 1997)|29|0001|1|90|0002|1|90|||||||||||||||||||||||| VALUE ENGINEERING (JUN 2020)|3|.||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|.| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4|.|||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS|45 DAYS AFTER DISCOVERY OF DEFECT||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|.|| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|.||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|.||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|.||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|.| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|336413|1250||||||||||| INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (NOV 2021)|2|.|| FACSIMILE PROPOSALS (OCT 1997)|1|IN LIEU OF FAX, EMAIL ELECTRONIC VERSION TO Shantell.Lawrence@contact@example.gov| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2| |X| This amendment modifies the referenced solicitation. The sole purpose of this amendment is to extend the proposal submission deadline to 30 JUL 2025. Except as specifically modified herein, all other clauses, requirements, terms, conditions, and provisions of the original solicitation, and any prior amendments thereto, remain unchanged and in full force and effect. Inquiries concerning this amendment should be directed to Shantell Lawrence at contact@example.gov. The official system of record for this solicitation is the NECO system. \ The following is included in section M of this solicitation: The Government will consider all responsible offerors/quoters for the award. The Government will evaluate offerors/quoters based on price, delivery timeframe, and past performance. All evaluation factors other than cost or price, when combined, are approximately equal to cost or price. Please email copy of proposal to contact@example.gov This solicitation is being issued under Emergency Acquisition Flexibilities (EAAuthority formally known as Special Emergency Procurement Authority (SEPA). Synopsis is waived based on urgency (FAR 5.202(a)(2)). \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: CABLE ASSY,AIRCRAFT ;4920-014974067; NSN , ;3654AS5180-1; Part Number, Shall be performed IAW: CABLE ASSY,AIRCRAFT ;Latest drawings; Publication (s). 1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS Potential sources must ensure they are able to repair or procure all parts listed on the NAVAIR spec controlled drawing to be in consideration as an approved source of repair for this item. 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: CABLE ASSY,AIRCRAFT ;3654AS5180-1; P/N, ;4920-014974067; NSN, ;Latest drawings; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. CABLE ASSY,AIRCRAFT ;TBD; Company Name , ;TBD; Address , ;TBD; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

More opportunities from Department Of Defense → Pa DLA Aviation At Philadelphia

Same awarding agency

NAICS: 336413
New
Federal
16--CYLINDER,SHOCK STRU
Solicitation # SPRPA126QUC16
DLA Aviation at Philadelphia is soliciting quotations for the procurement of six new, unused shock strut cylinders (NSN 1680-01-600-3327 V2) under a fixed-price, small business set-aside contract. This acquisition is conducted as a commercial item procurement, requiring offerors to provide documentation supporting the commerciality of the components. A critical requirement for award is that all parts must be newly manufactured spares; refurbished, remanufactured, or repaired materials are strictly prohibited. All delivered components must be accompanied by a properly executed FAA Form 8130-3 Authorized Release Certificate to ensure airworthiness and traceability from the original manufacturer. The contract mandates strict quality and technical standards, requiring contractors to maintain a quality control system compliant with AS/EN/JISQ 9100 or equivalent standards such as ISO 9001. Evaluation for award will prioritize past performance over price, utilizing the DoD Supplier Performance Risk System (SPRS) to assess item, price, and supplier risk. Delivery is required within 90 days FOB Destination, with packaging and marking adhering to MIL-STD-129 and MIL-STD-2073. Administrative requirements include the use of Wide Area Workflow (WAWF) for invoicing and receiving reports, and compliance with Buy American and cybersecurity regulations.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 14 hours ago

DEADLINE

in 6 days
View Details
NAICS: 334417
New
Federal
59--HEAT SINK,ELECTRICA
Solicitation # SPRPA126RZB27
The solicitation invites offers for a 59–Heat Sink, Electrical under solicitation number SPRPA126RZB27, issued by the Department of Defense’s DLA Aviation office in Philadelphia, with a response deadline of August 17, 2026. The contract incorporates numerous clauses related to quality assurance, including compliance with ISO 9001 or equivalent, warranty of supplies for one year post-delivery with a 45-day defect discovery window, and mandatory use of Workflow Pro’s Assist Module for invoice processing. Acquisition procedures require adherence to Buy American Act provisions, including certification requirements, and apply restrictions on recovered material content for EPA-designated products. The contractor must comply with small business subcontracting plans, equal opportunity requirements for veterans and workers with disabilities, and prohibitions tied to security classifications. The government may conduct a reverse auction as part of the evaluation process, and offers will be assessed primarily on price, delivery timeframe, and past performance, with non-cost factors weighted equally to price. The NAICS code is 334417 with a size standard of 1,000 employees, and no drawings are provided. Payment and invoice submission must follow Wide Area Workflow instructions using a combined invoice and receiving report. The contract includes provisions for stop-work orders, limitation of liability for high-value items, and mandatory representations and certifications under new federal deviations effective February 2026. All bids must be submitted through SAM.gov, with the point of contact being Jonathan M. Rivera of the DLA Aviation office in Philadelphia.
Electronic Connector Manufacturing

POSTED

about 14 hours ago

DEADLINE

in 21 days
View Details
NAICS: 336413
New
Federal
WINCH,CARGO P47
Solicitation # SPRPA126QZB62
Solicitation SPRPA1-26-Q-ZB62 is a fixed-price request for quotations issued by DLA Aviation at Philadelphia for the procurement of a Cargo Winch P47, identified by NSN 1680-01-653-3300 V2. The requirement is issued under emergency acquisition flexibilities with a response deadline of September 18, 2026. Delivery is required within 90 days, FOB Destination. To be considered technically acceptable, offerors must be government-approved sources of supply or provide an authorized distributor letter on the manufacturer's letterhead. The part must be acquired from manufacturing sources specified on a source control or selected item drawing per DoD-STD-100. The government intends to make a single award based on the most advantageous offer, prioritizing past performance over price. Evaluation will utilize the DoD Supplier Performance Risk System for quality and risk assessments. The contract mandates strict adherence to MIL-STD-2073 for packaging and MIL-STD-129 for marking, including specific DLR label requirements. Invoicing must be processed electronically via the Wide Area Workflow system using a 2:1 combo report. Key regulatory compliance includes the Buy American Act, NIST SP 800-171 cybersecurity requirements, and various FAR and DFARS clauses regarding labor disputes, child labor, and prohibitions on Chinese military companies. Inspection and acceptance will occur at the origin.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 14 hours ago

DEADLINE

in 6 days
View Details
NAICS: 333914
New
Federal
PUMP,RECIPROCATING
Solicitation # SPRPA126QYD35
Solicitation SPRPA126QYD35, issued by DLA Aviation at Philadelphia, is a small business set-aside for the procurement of newly manufactured reciprocating pumps. This item is designated as critical material because it is used in shipboard systems for aircraft launch and recovery, where failure could lead to serious injury or loss of life. Consequently, the government requires that all supplies be newly manufactured, as refurbished or repaired materials are ineligible for award. Offerors must be government-approved sources of supply, and distributors must provide an authorized distributor letter on the source's letterhead at the time of proposal submission. The contract is a fixed-price agreement requiring adherence to AS/EN/JISQ 9100 quality standards and NAWCAD Lakehurst drawing 80020 / 653D326-1. Delivery is required within 90 days, with inspection and acceptance occurring at the origin. Packaging must comply with MIL-STD-2073-1 and MIL-STD-129 marking requirements. Award will be made to a single responsible offeror based on the most advantageous combination of price and past performance, with past performance weighted as more important. Evaluation will include risk assessments via the Supplier Performance Risk System regarding item, price, and supplier risk. Invoicing and receiving reports must be processed through Wide Area Workflow.
Measuring, Dispensing, and Other Pumping Equipment Manufacturing

POSTED

about 14 hours ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS