Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

CABLE ASSY,INBOARD

Active
N0010422QFC63Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to the procurement of an Inboard Cable Assembly designated as SPECIAL EMPHASIS material due to its critical role in a shipboard system, where failure could result in catastrophic consequences including loss of life or vessel. The requirement is tied to Naval Sea Systems Command Drawing 7066213 and multiple other referenced drawings and specifications, with strict adherence to material, process, and certification standards mandated. Key materials such as QQ-N-286 alloy components require quantitative chemical and mechanical analysis, with testing restricted to approved laboratories for specialized tests like Slow Strain Rate Tensile Testing. First Article Testing of one complete assembly is mandatory prior to production, and all certifications must be traceable to individual items via unique heat-lot or traceability markings applied permanently in accordance with MIL-STD-792. The contract imposes comprehensive quality assurance controls including ISO-9001 or MIL-I-45208 compliant quality systems, mandatory government source inspection, and 100% verification of certifications and traceability data. Material handling, subcontractor oversight, welding procedures, and thread inspection must conform to detailed technical directives, and any deviation or waiver requires written approval from the Contracting Officer. The contractor must maintain full traceability from raw material through all manufacturing stages to final assembly, with documentation of all tests, inspections, and certifications submitted electronically via ECDS. All deliveries must meet strict compliance criteria, with nonconforming material subject to rejection. Packaging and preservation must comply with MIL-STD-2073. Delivery is set for no later than 400 days after contract award, with FAT reporting due within 180 days of order, and final certification data submitted no later than 20 days prior to delivery. The contract is issued under a Defense Priorities and Allocations System (DPAS) rating, making it a national defense priority item. The solicitation was originally set to close in 2026 but was revised with multiple extensions to adjust submission timelines and clarify quantity requirements, culminating in a final quantity of five units. The contracting officer and point of contact details are specified, with all communications, submissions, and waiver requests routed through designated channels including Jill Sabol’s email and the ECDS portal. Any use of PFAS-containing materials is prohibited, and replacements must meet contractual specifications without reliance on obsolete or discontinued specifications. Mercury and molybdenum disulfide-based lubricants are strictly forbidden, and only approved alternatives such as A-A-59

General Info

Procurement of critical shipboard cable assembly with strict quality, testing, certification, and compliance requirements.

Agency

Department Of Defense → Navsup Weapon Systems Support MechView Agency

NAICS

335931 - Current-Carrying Wiring Device ManufacturingView NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

10 updates
PhaseSolicitation
Posted

Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Amendment 5

Contract was updated

Amendment 6

Contract was updated

Amendment 7

Contract was updated

Amendment 8

Contract was updated

Amendment 9

Contract was updated

Amendment 10

Contract was updated

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Organization / Agency
Department Of Defense → Navsup Weapon Systems Support Mech
View Agency Profile
Office AddressMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more
CONTACT INFORMATION|4|N743.7|WVE|717-605-3875|jill.sabol@navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification section C | INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| TIME OF DELIVERY (JUNE 1997)|20|0001AA|8|500|0001AB|1 lot|see DD 1423||||||||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Material - Invoice & Receiving Report (COMBO) Certifications - Stand-Alone Receiving Report |Material - Inspection & Acceptance at SOURCE Certifications - Inspection at DESTINATION & Acceptance at OTHER| TBD|N00104|TBD|Certifications - N39040; Material -S4306A |N50286|TBD|133.2|N/A|N/A|Certifications - N39040|N/A|N/A|See DD Form 1423|PORT_PTNH_WAWF_Notification@navy.mil| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from the date of delivery |one year from the date of delivery ||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|1|0001AA|7|180|jill.sabol@navy.mil|TBD|0001A|120|x|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2022)|13|335931|500|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| EVALUATION OF FIRST ARTICLE TESTING|3|||x| EVALUATION CRITERIA AND BASIS FOR AWARD-|1|| This amendment is issued to address the following: Reference: (a) Vendor Bid Number JP26067 dated 17 April 2026 1. Reference (a) exception number 9 identifies that all soldering will be per the latest revision of ANSI/J-001 and that obsolete specifications will not be used. In response, the latest revision of ANSI/J-001 is approved for the subject solicitation and subsequent contract, if awarded. 2. Reference (a) identifies that 3M will stop production of Perfluoroalkyl and Polyfluoroalkyl Substances (PFAS) by the end of 2025 and requests that the Navy advise on replacements for MIL-SPEC items that use such substances. In response, NAVSEALOGCEN acknowledges that 3M has ceased manufacturing PFAS as of 2025. After discussion with the NAVSEA technical community, it has been determined that there is adequate supply of required material at present. NAVSEA will engage with Ducommun as applicable to identify suitable replacements as necessary. NAVSEALOGCEN takes no action on this recommendation for the subject solicitation. Should a contract be awarded based on this solicitation, material delivered must meet all requirements of contractually i invoked drawings. For PCO use only (ER-57208) \ This amendment is issued to update the closing date. \ This amendment is issued to extend the closing date. \ This amendment is to extend the closing date. \ This amendment is issued to update the POC and extend the closing date. \ This amendment is issued to correct the QTY listed in amendment 6. Requirement QTY is 5 (five). Closing date extended to 03 Sep 2024. Quantity increased to 25 each and the closing date is extended to 6/11/24. \ Closing date extended. TDP updated \ Quantity required is reduced to 5 each. Closing date extended. \ Closing date extended Quantity increased to eight. Closing date extended to 8/8/23. Required delivery extended. See 52.211-8. \ Small business set aside is removed. Closing date is extended. 1. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 2. Any contract/order awarded as a result of this solicitation will be a "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). See 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use. 3. Vendors submitting quality manuals shall submit them to jill.sabol@navy.mil instead of 0243.QAMANUAL@navy.mil. Per WSSTERMLZ02, offerors are cautioned that this procurement will not be delayed solely for approving additional sources. DD 1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 4. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 5. NAVSUP WSS Mech will be considering past performance in the evaluation of offers. See Clauses DFARS 252.213-7000 and WSSTERMMZ01. 6. If drawings are included in the solicitation, access needs to be requested on the individual solicitation page on Contract Opportunities on the Government's SAM.gov website. After requesting access, send an email to the Primary POC listed on the solicitation. The following delivery schedule will apply: FAT REPORT 180 DAYS AFTER DATE OR ORDER APPROVAL OF FAT REPORT 120 DAYS AFTER RECEIPT Within 180 Days after Contract Award and within 30 days after Test Completion, forward the Test Report to the PCO. The review shall be accomplished within 120 days.Submission of all other form 1423 certification data (CDRLs) will be on or before 20 days prior to delivery. PNSY review/acceptance of CDRLs shall be 6 working days after receipt of CDRLs. Final delivery of material will be on or before 400 days after the effective date of the contract. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.3 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. DRAWING DATA=EB-4707 |96169| A|SP |D|0001 | A|49998|0034417 DRAWING DATA=EB-4707 |96169| A|SP |D|0002 | A|49998|0010228 DRAWING DATA=EB-4707 |96169| A|SP |D|0003 | A|49998|0009688 DRAWING DATA=EB-4707 |96169| A|SP |D|0004 | A|49998|0015196 DRAWING DATA=EB-4707 |96169| A|SP |D|0005 | A|49998|0042460 DRAWING DATA=EB-4707 |96169| A|SP |D|0006 | A|49998|0013600 DRAWING DATA=EB-4707 |96169| A|SP |D|0007 | A|49998|0025918 DRAWING DATA=EB-4707 |96169| A|SP |D|0008 | A|49998|0027475 DRAWING DATA=EB-4707 |96169| A|SP |D|0009 | A|49998|0035849 DRAWING DATA=EB-4707 |96169| A|SP |D|0010 | A|49998|0026286 DRAWING DATA=EB-4707 |96169| A|SP |D|0011 | A|49998|0027109 DRAWING DATA=EB-4707 |96169| A|SP |D|0012 | A|49998|0040703 DRAWING DATA=EB-4707 |96169| A|SP |D|0013 | A|49998|0040998 DRAWING DATA=EB-4707 |96169| A|SP |D|0014 | A|49998|0043207 DRAWING DATA=EB-4707 |96169| A|SP |D|0015 | A|49998|0037818 DRAWING DATA=EB-4707 |96169| A|SP |D|0016 | A|49998|0020883 DRAWING DATA=PSSSN21C-306 |43689|.5|SP |D|0001 |.5|49998|9999999 DRAWING DATA=5613017 |53711| A| |D|0001 | A|49998|0019951 DRAWING DATA=5613018 |53711| A| |D|0001 | A|49998|0020757 DRAWING DATA=5613022 |53711| A| |D|0001 | A|49998|0024067 DRAWING DATA=5615883 |53711| A| |D|0001 | A|49998|0038074 DRAWING DATA=5615884 |53711| A| |D|0001 | A|49998|0184459 DRAWING DATA=7066213 |53711| G| |D|0000.A | G|49998|0027293 DRAWING DATA=7066213 |53711| G| |D|0000.0A | E|49998|0386749 DRAWING DATA=7066213 |53711| G| |D|0001 | G|49998|9999999 DRAWING DATA=7066213 |53711| G| |D|0002 | E|49998|0540066 DRAWING DATA=7066213 |53711| G| |D|0002.1 | G|49998|0045821 DRAWING DATA=7066213 |53711| G| |D|0002.2 | G|49998|0034633 DRAWING DATA=7066213 |53711| G| |D|0003 | C|49998|0264535 DRAWING DATA=7066213 |53711| G| |D|0004.1 | G|49998|0059812 DRAWING DATA=7066213 |53711| G| |D|0004.10 | G|49998|0078310 DRAWING DATA=7066213 |53711| G| |D|0004.11 | G|49998|0082951 DRAWING DATA=7066213 |53711| G| |D|0004.12 | G|49998|0086449 DRAWING DATA=7066213 |53711| G| |D|0004.13 | G|49998|0036956 DRAWING DATA=7066213 |53711| G| |D|0004.2 | G|49998|0068459 DRAWING DATA=7066213 |53711| G| |D|0004.3 | G|49998|0071461 DRAWING DATA=7066213 |53711| G| |D|0004.4 | G|49998|0068557 DRAWING DATA=7066213 |53711| G| |D|0004.5 | G|49998|0061836 DRAWING DATA=7066213 |53711| G| |D|0004.6 | G|49998|0060836 DRAWING DATA=7066213 |53711| G| |D|0004.7 | G|49998|0066673 DRAWING DATA=7066213 |53711| G| |D|0004.8 | G|49998|0069478 DRAWING DATA=7066213 |53711| G| |D|0004.9 | G|49998|0078787 DRAWING DATA=7066213 |53711| G| |D|0005.1 | G|49998|0048454 DRAWING DATA=7066213 |53711| G| |D|0005.2 | G|49998|0046599 DRAWING DATA=7066213 |53711| G| |D|0005.3 | G|49998|0048007 DRAWING DATA=7066213 |53711| G| |D|0005.4 | G|49998|0047993 DRAWING DATA=7066213 |53711| G| |D|0006.1 | G|49998|0060854 DRAWING DATA=7066213 |53711| G| |D|0006.2 | G|49998|0064253 DRAWING DATA=7066213 |53711| G| |D|0006.3 | G|49998|0053616 DRAWING DATA=7066213 |53711| G| |D|0006.4 | G|49998|0043734 DRAWING DATA=7066213 |53711| G| |D|0006.5 | G|49998|0054556 DRAWING DATA=7066213 |53711| G| |D|0006.6 | G|49998|0051176 DRAWING DATA=7066213 |53711| G| |D|0006.7 | G|49998|0059712 DRAWING DATA=7066213 |53711| G| |D|0006.8 | G|49998|0046241 DRAWING DATA=7066213 |53711| G| |D|0007.1 | G|49998|0026452 DRAWING DATA=7066213 |53711| G| |D|0007.10 | G|49998|0045606 DRAWING DATA=7066213 |53711| G| |D|0007.11 | G|49998|0045291 DRAWING DATA=7066213 |53711| G| |D|0007.12 | G|49998|0044279 DRAWING DATA=7066213 |53711| G| |D|0007.13 | G|49998|0044338 DRAWING DATA=7066213 |53711| G| |D|0007.14 | G|49998|0042833 DRAWING DATA=7066213 |53711| G| |D|0007.15 | G|49998|0043556 DRAWING DATA=7066213 |53711| G| |D|0007.16 | G|49998|0044068 DRAWING DATA=7066213 |53711| G| |D|0007.17 | G|49998|0044285 DRAWING DATA=7066213 |53711| G| |D|0007.18 | G|49998|0043993 DRAWING DATA=7066213 |53711| G| |D|0007.19 | G|49998|0043250 DRAWING DATA=7066213 |53711| G| |D|0007.2 | G|49998|0044549 DRAWING DATA=7066213 |53711| G| |D|0007.20 | G|49998|0042219 DRAWING DATA=7066213 |53711| G| |D|0007.21 | G|49998|0045212 DRAWING DATA=7066213 |53711| G| |D|0007.22 | G|49998|0046027 DRAWING DATA=7066213 |53711| G| |D|0007.23 | G|49998|0043602 DRAWING DATA=7066213 |53711| G| |D|0007.24 | G|49998|0042852 DRAWING DATA=7066213 |53711| G| |D|0007.25 | G|49998|0038801 DRAWING DATA=7066213 |53711| G| |D|0007.26 | G|49998|0024962 DRAWING DATA=7066213 |53711| G| |D|0007.3 | G|49998|0045743 DRAWING DATA=7066213 |53711| G| |D|0007.4 | G|49998|0044250 DRAWING DATA=7066213 |53711| G| |D|0007.5 | G|49998|0043828 DRAWING DATA=7066213 |53711| G| |D|0007.6 | G|49998|0046947 DRAWING DATA=7066213 |53711| G| |D|0007.7 | G|49998|0047703 DRAWING DATA=7066213 |53711| G| |D|0007.8 | G|49998|0050956 DRAWING DATA=7066213 |53711| G| |D|0007.9 | G|49998|0045523 DRAWING DATA=7066213 |53711| G| |D|0008.1 | G|49998|0027996 DRAWING DATA=7066213 |53711| G| |D|0008.10 | G|49998|0054893 DRAWING DATA=7066213 |53711| G| |D|0008.11 | G|49998|0055410 DRAWING DATA=7066213 |53711| G| |D|0008.12 | G|49998|0055162 DRAWING DATA=7066213 |53711| G| |D|0008.13 | G|49998|0055061 DRAWING DATA=7066213 |53711| G| |D|0008.14 | G|49998|0054211 DRAWING DATA=7066213 |53711| G| |D|0008.15 | G|49998|0053424 DRAWING DATA=7066213 |53711| G| |D|0008.16 | G|49998|0053356 DRAWING DATA=7066213 |53711| G| |D|0008.17 | G|49998|0056310 DRAWING DATA=7066213 |53711| G| |D|0008.18 | G|49998|0056136 DRAWING DATA=7066213 |53711| G| |D|0008.19 | G|49998|0054113 DRAWING DATA=7066213 |53711| G| |D|0008.2 | G|49998|0053446 DRAWING DATA=7066213 |53711| G| |D|0008.20 | G|49998|0032469 DRAWING DATA=7066213 |53711| G| |D|0008.3 | G|49998|0051555 DRAWING DATA=7066213 |53711| G| |D|0008.4 | G|49998|0052356 DRAWING DATA=7066213 |53711| G| |D|0008.5 | G|49998|0051357 DRAWING DATA=7066213 |53711| G| |D|0008.6 | G|49998|0051958 DRAWING DATA=7066213 |53711| G| |D|0008.7 | G|49998|0054847 DRAWING DATA=7066213 |53711| G| |D|0008.8 | G|49998|0054832 DRAWING DATA=7066213 |53711| G| |D|0008.9 | G|49998|0053989 DRAWING DATA=7066213 |53711| G| |D|0009.1 | G|49998|0062838 DRAWING DATA=7066213 |53711| G| |D|0009.2 | G|49998|0062044 DRAWING DATA=7066213 |53711| G| |D|0009.3 | G|49998|0062475 DRAWING DATA=7066213 |53711| G| |D|0009.4 | G|49998|0064898 DRAWING DATA=7066213 |53711| G| |D|0009.5 | G|49998|0065634 DRAWING DATA=7066213 |53711| G| |D|0009.6 | G|49998|0065095 DRAWING DATA=7066213 |53711| G| |D|0009.7 | G|49998|0064683 DRAWING DATA=7066213 |53711| G| |D|0009.8 | G|49998|0065648 DRAWING DATA=7066213 |53711| G| |D|0009.9 | G|49998|0042105 DRAWING DATA=7066213 |53711| G| |D|0010 | A|49998|0375877 DRAWING DATA=7066213 |53711| G| |D|0011 | G|49998|0092692 DRAWING DATA=7066213 |53711| G| |D|0012 | G|49998|0227173 DRAWING DATA=7066213 |53711| G| |D|0013 | G|49998|0090766 DRAWING DATA=7066213 |53711| G| |D|0014 | G|49998|0102650 DRAWING DATA=7066213 |53711| G| |D|0015 | G|49998|0124935 DRAWING DATA=7066213 |53711| G| |D|0016 | G|49998|0153611 DRAWING DATA=7066213 |53711| G| |D|0017 | G|49998|0136497 DRAWING DATA=7066213 |53711| G| |D|0018 | G|49998|0023482 DRAWING DATA=7491198 |53711| A| |D|0001 | A|49998|0062651 DRAWING DATA=7491200 |53711| -| |D|0001 | -|49998|0204664 DRAWING DATA=7491201 |53711| -| |D|0001 | -|49998|0027720 DRAWING DATA=7491201 |53711| -| |D|0002 | -|49998|0051607 DRAWING DATA=7491201 |53711| -| |D|0003 | -|49998|0043155 DRAWING DATA=7491201 |53711| -| |D|0004 | -|49998|0068050 DRAWING DATA=7491201 |53711| -| |D|0005 | -|49998|0017950 DRAWING DATA=7491201 |53711| -| |D|0006 | -|49998|0069326 DRAWING DATA=7491201 |53711| -| |D|0007 | -|49998|0047752 DRAWING DATA=7491202 |53711| -| |D|0001 | -|49998|0016034 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=MIL-STD-2132 | | |D |080310|F| |01| DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=A-A-59004 | | |B |181118|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 ;The Penetrator Assembly must be in accordance with Naval Sea Systems Command Drawing 7066213 Part Number 025, except as amplified or modified herein.; 3.2 ;General Note 4 on NAVSEA Drawing 5615883 which states "Assemble according to LaBarge Document# 5615879w/ 5613012" and General Note 5 on NAVSEA Drawing 5615883 which states "Inspect and test according to LaBarge Document ITI #574" are not applicable.; 3.3 ;Penetrator wiring must be modified per EB Specification 4707. Hook up of the penetrator conductors to the penetrator header assembly must follow the color code convention of EB Specification 4707. Inboard ends of wires and shields extending from the penetrator header assembly must be marked with the pin number to which they are attached.; 3.4 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.5 ;The FAT sample(s) must not be delivered against the contract quantity.; 3.6 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Body, Part 306/1-001 on drawing PSSSN21C-306; Material - ;QQ-N-286, annealed and Age Hardened (Mechanical properties to be in accordance with PSSSN21C-306 PARA 3.3.2).; Part - ;Nut, Part 306/1-006 on drawing PSSSN21C-306; Material - ;QQ-N-286, Annealed and Age Hardened (Mechanical Properties to be in accordance with PSSSN21C-306 PARA 3.3.2.); Part - ;Inboard cable assembly (header only), Part 306/1-013 on drawing PSSSN21C-306; Material - ;QQ-N-286, Annealed and Age Hardened (Mechanical Properties to be in accordance with PSSSN21C-306 PARA 3.3.2.); Part - ;Washer, Part 306/1-007 on drawing PSSSN21C-306; Material - ;QQ-N-286, Annealed and Age Hardened (Mechanical Properties in accorance with PSSSN21C-306 PARA 3.3.2); 3.7 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below. Test - ;Dye Penetrant Inspection; Item - ;Body, nut, Header, and Washer; Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - Ultrasonic Inspection on Starting Material Item - ;All Items requiring certification made from QQ-N-286 with a diameter or minimum distance between parallel surfaces of 4 inches or greater of the starting material, or when required by a drawing or specification invoked elsewhere in this contract; Performance - T9074-AS-GIB-010/271 or MIL-STD-2132, and QQ-N-286 Acceptance - QQ-N-286 Attribute - Annealing and Age Hardening Item - ;Body, Nut, Washer, and Header; Performance - QQ-N-286 Test - Quality Conformance/Compliance Inspection Item - ;Each Penetrator Assembly; Performance - ;Drawing 7491201 Table 7; Acceptance - ;Drawing 7491201 Table 7; 3.8 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test of QQ-N-286 must be performed by one of the following laboratories: Huntington Alloys, a Special Metals Company Attn: Bill Bolenr 3200 Riverside Drive Huntington, WV 257059 Phone: (304) 526-5889 FAX: (304) 526-5973 Metallurgical Consultants, Inc. Attn: W. M. Buehler 4820 Caroline PO Box 88046 Houston, TX 77288-0046 Phone: (713) 526-6351 FAX: (713) 526-2964 Naval Surface Warfare Center, Carderock Division Attn: Eric Focht Code 614 9500 Macarthur Blvd West Bethesda, MD 20817-5700 Phone: (301) 227-5032 FAX: (301) 227-5576 Teledyne Allvac Attn: Dr. W. D. Cao 2020 Ashcraft Ave. Monroe, NC 28110 Phone: (704) 289-4511 FAX: (704) 289-4269 Westmoreland Mechanical Testing and Research Inc. Attn: Andrew Wisniewski P.O. Box 388 Youngstown, PA 15696-0388 Mannesmann Rohrenwerke Mannesmann Forschungsinstitut (MFI) Attn: Dr. Weiss Postfach 251160 47251 Duisburg Germany Phone: 011-49-0203-9993194 FAX: 011-49-0203-9994415 ThyssenKrupp VDM USA, Inc. Attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 Houston, TX 77065-4939 Phone: (281) 955-6683 3.9 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.9.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.9.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.9.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.10 Thread Lubricant - Thread lubricants containing molybdenum disulfide must not be used on this material. Bacteria in water, especially seawater, causes molybdenum disulfide to break down. The by-products of the breakdown form compounds which attack the fasteners. Anti-galling compound A-A-59004 must be used as a replacement when thread lubricant is required for assembly. 3.11 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.12 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.13 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG/-0PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of thesmallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. 30 minutes / - 0 minutes. above 2500 PSIG, the pressure tolerance must be +2%/-0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be + 60 minutes/- 0 minutes. 3.14 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, (S9074-AQ-GIB-010/248 for brazing) by personnel and procedures qualified under S9074-AQ-GIB-010/248 for all production and repair welding and brazing. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.15 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.15.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. 3.16 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.17 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.17.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.17.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/ 3.17.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.18 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.19 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.20 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.20.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.20.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.20.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.20.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.20.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.21 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.21.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.21.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.22 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.22.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.22.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.22.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.22.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.22.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.23 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.23.1 Visual examination upon receipt to detect damage during transit. 3.23.2 Inspection for completeness and proper type. 3.23.3 Verification of material quality received. 3.23.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.23.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.23.6 Identification and protection from improper use or disposition. 3.23.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.23.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.23.9 Material returned to the contractor must be handled as GFM. 3.24 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.24.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order. 3.25 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.25.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.25.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.25.3 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the assembly identifying the part number, piece number, traceability number, and the location of the permanent mark. 3.25.4 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ; ; 3.26 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply: 3.26.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied. 3.26.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability material and at a minimum contain the information below. TRACEABILITY MARKING ________________________________________________ (marking on finished item) IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO HEAT/LOT NUMBER ______________ AND HEAT TREAT NUMBER _____________________ (when applicable) _________________________________________ DATE _____________________ (name and signature of auth. co. rep.) 3.26.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited. 3.26.4 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.26.5 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.27 Material Handling - The written material control process must include the following: 3.27.1 All raw materials must have traceability markings (except as specified below). 3.27.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. 3.27.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.27.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors. 3.27.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material. 3.27.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.28 Receiving inspection - 3.28.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location. 3.28.2 Receiving Inspection must include as a minimum - Verification that the traceability marking on the material agrees with that on the certification test reports. Verification that certification test reports are legible and complete. Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements. 3.29 Discrepancy reporting - 3.29.1 Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government Quality Assurance Representative (QAR). 3.30 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.30.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.30.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.30.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.30.4 All material requiring traceability must be 100% inspected for traceability marking and that the marking is legible. 3.31 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds. 3.31.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.31.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. ''WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC'.' WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ'') 3.31.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010, S9074-AR-GIB-010A/278,248d the contract. 3.31.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.31.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.31.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted as part of the qualification data. 3.31.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element. 3.31.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.31.9 When production or repair welding is required on titanium materials, theapplicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval. 3.31.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF. 3.31.11 A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following: a) Filler Metal LOT number(s) b) Specification and Type c) A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements. d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption. 3.31.12 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.32 See CDRL DI-NDTI-80809 (First Article Testing) - First Article Test/Inspection (Contractor) - The Contractor must conduct ;non-destructive; First Article Test/Inspection on ;1 (one) complete Penetrator assembly; unit(s) in accordance with requirements ;of drawing 7491201 Table 7 vendor qualification tests; . 3.33 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address and date. 2. The contract/purchase order number (for example: N00104-11-P-FA12) 3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (for example: 1H 4820 012345678 L1) ("N/A" when Not Applicable). 4. Lubricants, sealants, anti-seize, and/or thread locking compounds ("N/A" when Not Applicable). 5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable). 6. Manufacturer's compound number ("N/A" when Not Applicable). 7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance/compliance test performed by name and that it was performed satisfactorily. 9. Contractor's or authorized personnel's signature. 4. QUALITY ASSURANCE 4.1 Notes to DCMA QAR and the Contractor - 4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.2 DCMA QAR and the Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A copy must be given to the local Government representative. A record of these departures, traceable to the applicablepart number and contract number must be submitted to the PCO. 4.1.3 DCMA QAR and the Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements. 4.1.4 DCMA QAR - It is the responsibility of DCMA QAR to review Non-Destructive Testing (NDT) procedures for NAVSUP Contracts/Purchase Orders. 4.1.5 DCMA QAR and the Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at: https://register.nslc.navy.mil/ 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Several definitions of terms that apply to CSI items are listed below. All terms may not apply to every item. 6.1.1 The ECDS (Electronic Contractor Data Submission) system is at: https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD (Contract Support Document) Library within ECDS. 6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the ship, or unacceptable risk of personal injury or loss of life. 6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding, soldering, machining, polishing, cleaning, or assembling) or confirm that a critical characteristic is within drawing or specification compliance (such as, testing, measurement, or non-destructive evaluation). 6.1.4 First Article - Pre-production models, initial product samples, test samples produced to ensure a manufacturer's capability to meet full specification requirements. 6.1.5 First Article Test (FAT) - Contractually required testing and inspection of a supplier's pre-production, production, or "production representative" specimens to evaluate a manufacturer's ability to produce conforming product prior to the Government's commitment to receive subsequent production items. First Article Testing is product specific and does not assess manufacturing process controls nor does it assure the effectiveness of the manufacturer's quality program. 6.1.6 Government Source Inspection (GSI) - GSI is independent oversight performed by a government representative usually a DCMA Quality Assurance Representative (QAR)) to ass

Similar Contracts

Same NAICS industry code

NAICS: 335931
New
Federal
61--FUSE BLK/EMI A11, IN REPAIR/MODIFICATION OFThis contract solicitation, numbered N0010426QDB12, solicits repair services for the FUSE BLK/EMI A11 component under a firm-fixed-price arrangement, with a mandatory Repair Turnaround Time (RTAT) of 78 days measured from the physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility (CAV) system. All repairs must comply with the original manufacturer’s specifications, and the contractor is required to adhere to MIL-STD-130 Rev N for item marking and MIL-STD-2073 for packaging. The Government will conduct mandatory inspections, and the contractor must maintain complete inspection records for 365 days post-delivery. Freight is FOB Origin and managed by the Navy under the CAV Statement of Work; all quotes must include unit and total prices along with the proposed RTAT, and failure to meet the 78-day requirement necessitates disclosure of capacity constraints. Repair performance is subject to a detailed subcontracting plan, Buy American provisions, cybersecurity maturity certification, and compliance with Defense Federal Acquisition Regulation Supplement clauses, including the mandatory use of Workflow Pro and the release of offeror information under Navy protocols. The awardee must hold authorization as an official distributor of the original manufacturer, and proof of authorization must accompany the proposal. The contract includes strict prohibitions against unapproved design, material, or part number substitutions, with any changes requiring written approval from the NAVICP-MECH Contracting Officer and classification under specific Code designations. Pricing must account for all costs related to repairing items in unwhole, damaged, or incomplete condition, and if an item is deemed beyond repair, a negotiated teardown and evaluation fee not to exceed a specified amount may apply. The contract also incorporates clauses on security exclusions, annual representations, cybersecurity readiness, and small business subcontracting obligations. All technical documentation referenced must be obtained through official DoD sources, with distribution restrictions governed by seven defined codes and safeguarding requirements under OPNAVINST 5510.1. Proposals are due by August 18, 2026, and the award will be bilateral, requiring the contractor’s written acceptance before execution. The award will be managed by the Navy Supply Systems Command in Mechanicsburg, Pennsylvania, and all communication must be directed to the designated point of contact.
Navsup Weapon Systems Support Mech

POSTED

about 4 hours ago

DEADLINE

in 20 days
View Details
NAICS: 335931
New
Federal
POWER SUPPLYThe contract pertains to the procurement of a POWER SUPPLY under solicitation SPRMM126QKE41, with a response deadline extended to September 4, 2026. The purchasing office is SPRMM1 DLA Mechanicsburg, located in Mechanicsburg, Pennsylvania, and all inquiries must be directed to Marchaunda Tiller at marchaunda.tiller@dla.mil. The contract requires strict adherence to quality standards including ISO9001 and IPC J-STD-001 Class 3 for soldering, and mandates compliance with MIL-STD-130 Rev N for part marking. Inspection and acceptance must occur at the manufacturer’s facility, with no acceptance allowed at destination. The contractor must provide a Certificate of Conformance when appropriate and ensure traceability of materials. Packaging must comply with MIL-STD-2073, and any packaging performed off-site requires disclosure of the facility’s location and CAGE code. The contract includes mandatory representations and certifications under federal acquisition regulations, including Buy American requirements, Small Business Program representations, and security prohibitions. Only authorized manufacturers or distributors may respond; distributors must provide signed documentation from the original equipment manufacturer attesting to their authorization. Surplus materials are not preferred and if used, must be new surplus with proper certification and justification per DLAD 11.302 and 11.390. Refurbished parts are generally prohibited. Delivery is desired within 90 days ADC, with all freight terms as FOB origin. The CAGE codes for the manufacturer and packaging facility must be provided, and any deviation from the solicited part number requires prior approval and documentation. All quotations must include accurate part numbers, NSNs, and nomenclature, with exceptions to requirements explicitly stated. Records of all inspections must be maintained for 365 days after final delivery. The contract prohibits the use of foreign nationals for access to controlled technical data and requires compliance with OPNAVINST 5510.1 distribution statement codes.
SPRMM1 DLA Mechanicsburg

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335931
New
Federal
ACTUATOR,ELECTRO-METhis contract pertains to the procurement of two critical components for the MK 41 Vertical Launching System: the POWER SUPPLY ASSEMB and the ACTUATOR, ELECTRO-ME, under a Special Emergency Procurement Activity using Emergency Acquisition Flexibilities authority. The solicitation requires strict adherence to military standards including MIL-STD-130 for marking, MIL-STD-2000 for soldering, MIL-STD-129 for packaging and identification, and MIL-STD-973 for configuration control, with all work subject to inspection and acceptance at the source only—destination inspection is prohibited. The contractor must acquire or develop the Stable Base Master Phototools independently, as the government will not provide them, and must ensure traceability, military standard packaging, and compliance with ANSI/ESD S20.20 for electrostatic discharge control. No substitutions or design changes are permitted without prior written authorization, and deviations or waivers must be formally justified with evidence that quality, fit, form, or function will not be compromised. All offers must be submitted by the specified deadline via hardcopy or email to MARCHAUNDA.TILLER@DLA.MIL, with FMS quotes accepted in hardcopy form, and must include proof of being an authorized distributor if applicable. Surplus materials are not preferred; if submitted, they must be new surplus accompanied by a certification and comply with DLAD 11.302 and 11.390, and refurbished materials are explicitly prohibited. Delivery must be completed within 90 days ADC, with FOB origin terms applying, and all documentation including certificates of conformance, compliance with Buy American provisions, Small Business Program representations, and cybersecurity maturity certification must be included. Records of inspection and quality control must be retained for 365 days post-delivery, and the contracting office reserves the right to conduct any inspection necessary to verify conformity. The NAICS code is 335931, and the solicitation is managed by the Department of Defense through the DLA Mechanicsburg office with a designated point of contact for submissions and follow-up.
SPRMM1 DLA Mechanicsburg

POSTED

about 4 hours ago

DEADLINE

in 13 days
View Details

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 333611
New
Federal
CASE,COMPRESSOR,NONThis solicitation, issued under Emergency Acquisition Flexibilities, seeks repair services for the CASE, COMPRESSOR, NON, with a required turnaround time of 202 days from physical receipt of the asset at the contractor’s facility, as recorded in the Commercial Asset Visibility system. Only firm-fixed-price or not-to-exceed quotes for repair are acceptable; test and evaluation pricing alone will not be considered. The contract mandates strict adherence to Item Unique Identification standards under DFARS 252.211-7003, MIL-STD-130 Marking, and MIL-STD-2073 Packaging, with all work performed by an authorized repair source. Contractors must provide a monthly throughput capacity and acknowledge a 365-day induction expiration window after award, beyond which repairs require bilateral agreement. Failure to meet the turnaround time triggers a pre-defined per-unit, per-month price reduction, with no penalty for excusable delays such as government-caused holds, and potential termination for default remains reserved. All submissions must include unit and total repair prices, new unit cost, RTAT, T&E fee caps for BR/BER items, CAGE codes for award, inspection, and shipping facilities, a cost breakdown with profit rate, and an expiration date of at least 90 days. Submission is exclusively via email to KATE.C.HEIDELBERGER.CIV@US.NAVY.MIL, with mandatory compliance with Wide Area Workflow Payment Instructions and mandatory use of Workflow Pro’s Assist Module. The solicitation is a total small business set-aside issued under Deviation 2026-O0037, and the awardee must be an authorized distributor of the original manufacturer’s item, requiring proof of authorization on company letterhead. The contract incorporates military standards for inspection, quality assurance, and documentation retention for 365 days post-final delivery, and requires precise reporting of asset transactions in CAV within five business days of receipt. Distribution of technical data is controlled under OPNAVINST 5510.1 with designated distribution codes, and requests for “NOFORN” or “Official Use Only” documents must be submitted through proper channels. The contracting office is located in Mechanicsburg, PA, with performance tied to Navy CAV or Proxy CAV logistics, and all responses are due by August 28, 2026.
Turbine and Turbine Generator Set Units Manufacturing

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
48--VALVE, GLOBE, REGThis contract pertains to the procurement of a globe control valve under solicitation N0010426REA76, issued by the Naval Supply Systems Command Weapon Systems Support Mechanical division, and is structured as a firm-fixed-price agreement with mandatory compliance to specific military and industry standards. The contractor must adhere to detailed technical and quality assurance requirements outlined in the Individual Repair Part Ordering Data (IRPOD), which takes precedence over other contract documents in case of conflict, with an established order of precedence for resolving discrepancies among cited specifications, drawings, and standards. All technical data, including drawings, STRs, and repair part documentation, must be obtained from the secure logistics website, requiring pre-registration and password access, and contractors are prohibited from combining revisions of documents unless approved by the Contracting Officer. The contractor is required to implement and maintain a government-acceptable inspection system, retain complete inspection records, and comply with packaging specifications under MIL-PRF-23199 and MIL-STD-2073, particularly regarding cleanliness controls and the use of heat-sealed envelopes, while the use of fire retardant packaging is explicitly excluded. The contract requires submission of pre-manufacturing procedure packages and certified test and inspection reports within specified timelines—45 days after award and at contract end date respectively—and mandates separate submission packages for each unique contract, NSN, and item combination. All deliverables must conform to DD Form 1423 data requirements, including correct use of inspection and acceptance codes, distribution statements, and submission frequency indicators, with pricing governed by one of four data groups based on usage and development effort. The government retains the right to impose a stop-work order, and stringent security and cybersecurity maturity certifications apply. Vendor waivers or deviations from technical requirements must be formally submitted with full technical justification and supporting data, and must be reviewed by the Quality Assurance Representative before being forwarded to the Post-Award Contracting Officer. The offeror must submit a complete, signed proposal prior to the August 28, 2026 deadline, and pricing is valid for 60 days post-closing unless otherwise specified. Small business representation is required, mercury is prohibited in materials, and all contractual documents are considered issued upon electronic transmission. Failure to comply with any requirement, including those related to equal opportunity, security prohibitions, or cybersecurity certification, may result in disqualification or contract non-performance.
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 333998
New
Federal
JACKBOX SWITCHThis contract pertains to the manufacture of the JACKBOX SWITCH, identified by part number 62107-0001, under solicitation N0010426QAC19 issued by the Navsup Weapon Systems Support Mech office in Mechanicsburg, PA. The contract mandates strict adherence to military standards for design, marking, and configuration control, requiring compliance with MIL-STD-130 for mechanical parts, MIL-STD-1285 for electrical and electronic components, and MIL-STD-973 for configuration management, including formal submission of engineering change proposals, deviations, and waivers. All items must meet specified material and physical requirements, and the contractor bears full responsibility for quality assurance, including maintaining inspection records for 365 days after final delivery. Government source inspection per FAR 52.246-2 is required, and sampling does not permit submission of defective material. Delivery is mandated within 90 days, and packaging must conform to MIL-STD-2073 as referenced in the schedule. The procurement is subject to a total small business set-aside and includes cybersecurity maturity model certification requirements, priority rating for national defense use, and specific security prohibitions. The contractor must comply with all labeling and marking standards, and sourcing is restricted to vendors listed under OD36190; substitutions require prior government testing and approval. Documentation access for controlled items, including NOFORN and classified materials, must follow specified procedures through designated government offices. Payment instructions are routed through Wide Area Workflow using the provided email, and all contractual documents are considered officially issued upon electronic transmission. The contract incorporates current and applicable government regulations, deviations, and certifications effective through 2026, with the response deadline set for August 17, 2026.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

about 4 hours ago

DEADLINE

in 19 days
View Details
NAICS: 332919
New
Federal
REDUCER,PIPEThis contract, issued under solicitation number N0010426QFG37 by the Naval Supply Systems Command Weapon Systems Support at Mechanicsburg, Pennsylvania, is a combined solicitation for a pipe reducer designated as SPECIAL EMPHASIS material, Level I, due to its critical role in shipboard systems where failure could result in catastrophic loss of life, vessel, or critical systems. The item, a 1-1/2 x 1 inch NPS reducer, must comply strictly with Buships Drawing 803-1385945, Piece 2, and be manufactured from MIL-C-15726, alloy C71500 in Temper 060 or M20-Soft, with mandatory quantitative chemical and mechanical certification traceable to heat or lot numbers. All material must be permanently marked for traceability per MIL-STD-792, with exceptions for small surfaces requiring durable tags, and all certifications must be submitted via WAWF to Portsmouth Naval Shipyard under DODAAC N50286, with inspection and acceptance authority held by N39040 and notification via PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL. No material may be shipped without prior written acceptance. The contractor must maintain an ISO-9001 quality system aligned with ISO-10012 and ISO/IEC 17025 calibration standards, with documented procedures available for government audit, and must permit Government Quality Assurance at source. All welding and brazing, including repair and production, must follow S9074-AQ-GIB-010/248 or S9074-AR-GIB-010A/278, with procedures and welder qualifications submitted for Navy approval prior to any work. Weld filler metal must be certified with lot numbers and conformity statements, and all welds require NDT certification tied to joint and layer. The contract demands 100% verification of material certifications, traceability markings, and NDT reports, with zero-defect acceptance sampling per ANSI/ASQ Z1.4. Waivers and deviations must be formally submitted via email, classified as Critical, Major, or Minor, and approved by the Contracting Officer. The order is DO-rated under the Defense Priorities and Allocations System, subject to Emergency Acquisition Flexibilities, and mandates strict adherence to Buy American and Mercury-Free requirements. The full submission deadline
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
VALVE/ACTUATOR ASSYThis contract pertains to the repair of a VALVE/ACTUATOR ASSY under solicitation N0010426QLC26, issued by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania. The Government requires a Repair Turnaround Time (RTAT) of 180 days, measured from the physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility system, to final Government acceptance. Delivery is FOB Origin, and all freight is managed by Navy CAV or Proxy CAV per NAVSUPWSSFA24 or NAVSUPWSSFA25. The contract mandates Government Source Inspection, and any failure to meet the RTAT without excusable cause will result in a per-unit, per-month price reduction, up to a specified maximum limit, with no limitation on other remedies including termination for default. The offering must include a firm-fixed-price quote with unit and total pricing, along with the proposed RTAT, and if longer than 180 days, an explanation of capacity constraints. The contract incorporates numerous mandatory clauses including Buy American Act requirements, cybersecurity maturity model certification, Small Business Subcontracting Plan, Security Prohibitions and Exclusions, and Mandatory Use of Workflow Pro (WFP) Mod Assist Module. All repairs must adhere to the original manufacturer’s specifications and drawings, and items must be marked in compliance with MIL-STD-130 Rev N. Substitutions of parts require prior written approval from the NAVICP-MECH Contracting Officer, with specific code classifications for changes. The contractor must maintain complete inspection records for 365 days after final delivery and ensure compliance with packaging standards under MIL-STD-2073. Only authorized distributors of the original manufacturer may bid, requiring proof of authorization on company letterhead. The Government reserves the right to exercise an option to increase quantities under the same unit price, and the contract is subject to reconciliation modifications for pricing adjustments due to delays. All technical documents provided are subject to distribution statements controlling accessibility, and NOFORN or Official Use Only documents require special requests through designated Navy channels.
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 4 hours ago

DEADLINE

in about 5 hours
View Details
NAICS: 332919
New
Federal
PARTS KIT,BALL VALVThis contract pertains to the repair and refurbishment of a ball valve parts kit designated as special emphasis material due to its critical role in shipboard systems, where failure could result in catastrophic consequences including loss of life or vessel. All work must comply with stringent quality requirements, including full traceability of materials from raw stock to final assembly, with mandatory certifications for chemical and mechanical properties of components such as the ball (SAE-AMS-6931 or centrifugally cast 6AL-4V titanium) and seats (Torlon 4503, 4203, or 4203L polyamide-imide per Electric Boat Specification 4147). The repair must restore items to "like new" or "A" condition, with strict limitations on rework—specifically, balls may only be reworked to a minimum diameter of 8.359 inches, and any defects exceeding specified tolerances must be dispositioned. All welds, brazing, and surface treatments must adhere to approved procedures, with submission of qualified processes and welder certifications prior to work commencement, and chemical testing required for surface coatings to meet strict iron/nickel content limits. Contractors must maintain a certified quality management system compliant with ISO-9001, ISO-10012, and ISO/IEC 17025, or alternatively MIL-I-45208 with MIL-STD-45662, and are subject to government quality assurance inspections at source. Material traceability is absolute: every component must bear a permanent, legible marking (MIL-STD-792), directly linking it to its certification data submitted via the Wide Area Work Flow (WAWF) system to Portsmouth Naval Shipyard (N50286) for review and approval prior to shipment. Certification data must be submitted at least 20 days prior to delivery and accepted before any material is released, with final delivery constrained to within 365 days of contract effective date. The contract mandates submission of not-to-exceed pricing, a beyond-repair cost estimate, and excludes shipping costs as government transportation is provided. Offers require a demonstrated quality control manual, and past performance is evaluated. All submissions must be electronic and traceable, and any deviations or waivers require formal approval from the Contracting Officer, classified as critical, major, or minor, with detailed justification. This is a Level I repair under a small business set-aside
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 334412
New
Federal
59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OFThis contract pertains to the repair and modification of a CIRCUIT CARD ASSEMBLY under a fixed-price arrangement with strict compliance requirements outlined by Department of Defense standards. The work must adhere to MIL-STD-130 for unique identification and MIL-STD-1686 for electrostatic discharge control, with repairs performed according to the contractor’s approved technical procedures and manufacturer specifications. The item must be marked properly, free of mercury contamination, and any substitution of parts requires prior written approval from the NAVICP-MECH Contracting Officer, with specific code classifications governing the nature of changes. The contractor is responsible for all inspections, must maintain detailed records for one year after final delivery, and ensure packaging complies with MIL-STD-2073. The contract includes a 1-year warranty on supplies, a mandatory requirement to use Workflow Pro (WFP) Mod Assist for payment processing, and compliance with Buy American and small business set-aside provisions. A 180-day option provision allows the government to increase the order quantity without re-solicitation, and pricing for this option must be included in the proposal. Evaluation for award will be based on the lowest aggregated total price including the option. The repair must be completed within an estimated 145-day RTAT period, encompassing both refurbishment and return shipment to the Navy. Additionally, distribution of technical documents is restricted under OPNAVINST 5510.1, with specific codes governing access, and only authorized distributors of the original manufacturer may submit offers. Security, export controls, and subcontractor compliance are tightly regulated, including prohibitions on mercury use and mandates for protective labeling if mercury is an essential component. All contractual documents are deemed issued upon electronic transmission, and failure to meet delivery timelines may result in enforceable penalties unless excused by extenuating circumstances.
Bare Printed Circuit Board Manufacturing

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332510
New
Federal
LOCKPLATE,F-R,2SThe contract pertains to the procurement of a Lockplate, F-R, 2S under solicitation N0010426QEC09, issued by the Naval Supply Systems Command Weapon Systems Support Mechanic, with a response deadline of August 28, 2026. Pricing is valid for 60 days after the closing date unless otherwise specified, and vendors must review the mandatory Individual Repair Part Ordering Data (IRPOD) available via the BPMI website, which requires pre-registration. The contract incorporates a hierarchy of governing documents, with contract amendments taking precedence over the schedule, terms and conditions, and then IRPOD, followed by technical specifications, drawings, and standards. Contractors must use referenced documents in their entirety and obtain prior written approval from the Contracting Officer for any deviations or use of later revisions. Compliance with cleanliness control standards such as MIL-STD-767 and MIL-STD-2041 is required where invoked, with packaging governed by MIL-PRF-23199 and MIL-DTL-24466 green poly bags under specific conditions, while fire-retardant packaging is no longer required. Mercury or mercury-containing compounds are strictly prohibited from contact with supplied hardware. Quality assurance requirements are defined in the IRPOD, and contractors must maintain complete inspection records accessible to the government throughout performance and beyond. All contractual documents are considered issued upon electronic transmission, email, or fax, with acceptance of the proposal forming a bilateral agreement. Technical data packages (TDPs) referenced via DD Form 1423 include detailed instructions on data submission, including delivery frequency, approval codes, distribution restrictions, and pricing groups, with specific codes governing inspection and acceptance authority at source or destination. Contractors must submit certified test and inspection reports per DI-QCIC-8872, in separate packages for each unique NSN and item nomenclature, and obtain PCO authorization prior to shipment. Distribution of technical documents follows DoDI 5230.24 with six defined codes limiting dissemination to U.S. government agencies, DoD contractors, or restricted entities. The contract mandates use of Wide Area Workflow for payment and requires compliance with cybersecurity maturity model certification levels, total small business set-aside provisions, and security exclusions. Transportation by sea and priority rating under national defense programs further apply. Vendor waivers or deviations must include full justification, technical data supporting the proposed change, and evaluation demonstrating no adverse impact on fit, form, or function
Hardware Manufacturing

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 334514
New
Federal
66--VENTURI METER, IN REPAIR/MODIFICATION OFThis contract solicitation, numbered N0010425QDE06, is for the repair and modification of a VENTURI METER under a firm-fixed-price structure, with a required Repair Turnaround Time (RTAT) of 175 days measured from the physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility (CAV) system. The Government mandates strict compliance with MIL-STD-130 for item marking and requires all repairs to adhere to manufacturer specifications, authorized technical orders, and approved repair standards. The CAGE code 53711 and reference number 6128170 identify the specific item to be repaired, and any changes to design, material, or part number must be formally approved via written change order, with specific codes documenting the nature of the modification. Contracting officers will inspect and accept repaired items, and all inspection records must be maintained for 365 days post-delivery. Freight is managed by the Navy, and the contractor must accurately report asset transactions in CAV within five business days. The solicitation includes a clause requiring proof of authorization as a distributor of the original manufacturer’s item, and pricing must encompass all costs associated with repairing potentially unwhole, damaged, or incomplete units. A Teardown & Evaluation fee may be negotiated if the asset is deemed beyond repair, capped at a not-to-exceed amount yet to be specified. The Government reserves the right to exercise an option to increase quantity under the terms of FAR 52.217-6, and all awards will be issued bilaterally, contingent upon the contractor’s written acceptance. Performance is governed by the Clause 52.222-90 inclusion following the FAR overhaul, and the contract aligns with the Buy American Act and Annual Representations and Certifications, with an induction expiration deadline set at 365 days. The response deadline is August 18, 2026, and all proposals must include unit price, total price, and actual RTAT, with deviations from the government's requirement requiring documented capacity constraints. The point of contact is Aryel A. Ryan, with communications directed to the provided Navy email address.
Totalizing Fluid Meter and Counting Device Manufacturing

POSTED

about 4 hours ago

DEADLINE

in 20 days
View Details
NAICS: 334412
New
Federal
CIRCUIT CARD ASSEMBThis contract pertains to the repair of CIRCUIT CARD ASSEMBLY items under an emergency acquisition authority, issued as a solicitation with the number N0010426QQB83 by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania. The requirement mandates that all repairs adhere strictly to the original manufacturer’s technical specifications, drawings, and approved procedures, with compliance governed by MIL-STD-130 for marking and ANSI/ESD S20.20 for electrostatic discharge control. All work must be performed by authorized distributors of the original equipment manufacturer, who must submit proof of authorization with their quote. The contract requires a Firm-Fixed-Price structure, with the contractor responsible for inspection, testing, and documentation throughout the repair process, and all repairs must meet a designated Return to Repair Turnaround Time (RTAT) measured from physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility system. The contract stipulates that freight is FOB Origin and handled by the Navy under the Commercial Asset Visibility Statement of Work, with Government Source Inspection mandatory. Contractors must provide detailed pricing including unit and total costs, RTAT, and justification for any pricing outside historical norms, along with comparisons between repair costs and new purchase prices. If an item is deemed beyond repair, a separate testing and evaluation fee applies, capped at a specified amount. Modifications to part numbers, materials, or design require prior written approval from the contracting officer, classified under specific change codes. All records must be maintained for 365 days post-delivery. The order is issued under and incorporates by reference any existing Basic Ordering Agreement, with BOA terms prevailing in case of conflict. The contract also enforces Buy American requirements, security prohibitions, small business subcontracting obligations, and mandatory use of Workflow Pro for payment and documentation, with all submissions due by August 28, 2026.
Bare Printed Circuit Board Manufacturing

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details