Cal Poly Master Plan 2035

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Cal Poly Master Plan 2035 encompasses two primary development initiatives at the San Luis Obispo campus. The first is a modified Student Housing Project, which transitioned to a modular building system to improve cost and schedule efficiencies. This redesign reduces the total number of residence halls from nine to eight, with building heights increased up to 10 stories to maintain the original student bed capacity. This project was approved on August 17, 2026, and is subject to environmental mitigation measures and a Statement of Overriding Consideration under CEQA. The second initiative is the construction of the Student Success Center, a 69 million dollar project involving a three-story, 36,000-square-foot facility on a 1.3-acre site previously used for parking. This center will provide career advising, first-generation student services, and multi-purpose rooms. Associated site improvements include a new Mustang Shuttle stop, secure bike and scooter parking, two cart charging stations, ADA-compliant parking spaces, and enhanced sidewalks with new crosswalks and curb ramps. Both projects are aligned with the Campus Master Plan and require strict adherence to environmental and accessibility standards.

General Info

Cal Poly 2035 plan includes modular student housing and a Student Success Center.

Agency

California State Polytechnic University, San Luis Obispo

Place of Performance

Village Drive and North Perimeter, CA, 93407

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed.

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia State Polytechnic University, San Luis Obispo
Contacts1 person available
OfficeN/A
Organization / Agency
California State Polytechnic University, San Luis Obispo
Office AddressN/A
Contacts
Scott BloomCampus Planner

Full Description

Show more
The Campus Master Plan previously identified the construction of a new student center addition (Building 19A) located adjacent to Building 19 (Dining Commons) within the Academic Core of the Master Plan Area. The project would relocate Building 19A from its previously envisioned location adjacent to Building 19 to a new location adjacent to Building 15 (Cal Poly Corporation Administration), still within the Academic Core, to allow for the development of the Student Success Center (SSC) on the existing H4F surface parking lot. The project site is currently occupied by the H4F parking lot and landscaped medians bounded by Truckee Road, Village Drive, North Perimeter Road, and Building 15. The removal of the existing H4F surface parking lot was envisioned in the Campus Master Plan as this site has been designated for redevelopment with student housing as part of a collection of residence halls extending to the north. The project involves the construction and operation of a three-story, approximately 36,000-square-foot SSC building. The SSC would house student services including career advising and first-generation student services, as well as multi-purpose rooms. Entry would be provided via the first floor on the northern, southern, and western elevations of the building. In addition to the proposed SSC building, the project would also involve the development of surrounding outdoor program space for formal events and informal student use, similar to areas in the adjacent Student Housing Program residential neighborhood. A series of garden spaces would provide adaptable venues with integrated seating, open hardscape, and shaded areas for both formal and informal events. Additional site improvements include an additional Mustang Shuttle stop along Village Drive (also serving as a tram stop for the Disability Resource Center), secure bike/scooter parking, and two cart charging stations. Existing parking stalls (15 parallel parking stalls) along Truckee Road would be maintained to serve the proposed SSC building. The existing sidewalk along North Perimeter Road would be improved to include two new crosswalks with associated curb ramps to increase campus connectivity and pedestrian safety. Adequate emergency access would be provided at multiple access points to the site from North Perimeter Road, Truckee Road, and Village Drive. Implementation of the project would result in the removal of approximately 90 surface parking spaces associated with the existing H4F surface parking lot. Consistent with the Master Plan’s Implementation Program, campus is actively and adaptively managing parking on campus to reduce the need for on-campus parking. As a result, the project would continue to utilize parking spaces on Truckee Road and only add two Americans with Disabilities Act (ADA) compliant spaces on Village Drive, lowering the total number of parking spaces on the project site. However, a 2023 parking analysis demonstrated a surplus of 1,000 parking spaces across the campus, which would offset the elimination of the 90 parking spaces with project implementation

Similar Contracts

Same NAICS industry code

NAICS: 541360
SLED
City of Norco 2050 General Plan Update Project
Solicitation # 2024110840
The City of Norco is undertaking the 2050 General Plan Update Project to establish a long-term vision for land use, development patterns, infrastructure planning, and resource conservation within the city's incorporated limits. The project focuses on preserving the rural, equestrian-oriented atmosphere of residential agricultural neighborhoods, supporting local businesses, and creating a prominent downtown identity. To comply with State Planning and Zoning Law, the update includes six mandatory elements: Land Use and Community Character, Circulation, Infrastructure and Facilities, Open Space and Conservation, Safety, and Noise. The plan incorporates goals and policies developed through community outreach to enhance public facilities, parks, and transportation safety. The project is managed by the Community Development Director, Colby Cataldi, with support from Meridian Consultants. A Program Environmental Impact Report has been developed to ensure compliance with CEQA guidelines, identifying a significant environmental impact regarding paleontological resources that requires specific mitigation. The project also mandates adherence to the Americans with Disabilities Act for pedestrian infrastructure and requires strict confidentiality regarding tribal cultural resources. Additionally, any construction activities involving soil disturbance must comply with NPDES General Permit requirements, including the development of a Stormwater Pollution Prevention Plan. The public review period for the draft environmental documents was scheduled from August 14, 2026, to September 28, 2026.
City of Norco

POSTED

8 days ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS