Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on June 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

California And Baker Street Reconstruction

Closed
20260625074State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Paving The Way Program Whittier Boulevard Project
Solicitation # CP 889
The City of Montebello is soliciting sealed bids for the Paving The Way Program Whittier Boulevard Project, which involves comprehensive street improvements and traffic striping on Whittier Boulevard from Via Clemente Street to Van Norman Road. The scope of work includes mobilization, traffic control, removal and construction of concrete sidewalks, curbs, gutters, and driveway approaches, as well as the installation of asphalt concrete base courses and ARHM AC Type C2 pavement. The project must be completed within 120 working days from the Notice-to-Proceed, with construction tentatively scheduled to begin in November 2026 and conclude in February 2027, followed by a project close-out in April 2027. The contract will be awarded to the lowest responsible bidder who possesses a California Class A Contractor's License and is registered with the Department of Industrial Relations. Bidders must submit electronic proposals via PlanetBids by 11:00 AM on September 23, 2026, including a proposal guarantee of at least 10 percent of the total bid. Work must adhere to the 2018 Green Book, SPPWC, Caltrans Standard Plans, and the CA-MUTCD, with all temporary and permanent pedestrian crossings complying with ADA standards. Required certifications include non-collusion affidavits, equal employment opportunity compliance, and affirmative action documentation. Performance and payment bonds are required, with the performance bond maintained for one year post-construction.
City of Montebello

POSTED

about 10 hours ago

DEADLINE

in 7 days

General Info

Agency

California → City of CoalingaView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Coalinga, CA, 93210, USA

Set-Aside

NONE

Documents

(4)

PW 26-04 California and Baker Street Reconstruction Plan Holders List

PDFplan-holders-list

STPL-5146(034) California and Baker Street Reconstruction Specifications

PDFspecifications

STPL-5146(034) California and Baker Street Reconstruction Construction Plans

PDFconstruction-plans

STPL-5146(034) California and Baker Reconstruction Notice to Contractors

PDFnotice-to-contractors

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Coalinga
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Coalinga
View Agency Profile
Office AddressN/A
Contacts
The EngineerTri City Engineering, Inc.

Full Description

Show more
Bid #PW 26-04 / STPL-5146(034): The project consists of the reconstruction of California Street (from West Washington Avenue to Cambridge Avenue) and Baker Street (from California Street to Sunset Avenue). The work includes full-depth roadway reconstruction with varying pavement sections (asphalt concrete, aggregate base, and compacted subgrade), demolition and replacement of sidewalk, curb, and gutter, and construction of new concrete valley gutters. Pedestrian improvements include ADA-compliant curb ramps, high-visibility crosswalks, and detectable warning tiles. Site improvements involve adjusting utility structures to grade and installing new pavement markings and striping.

More opportunities from California → City of Coalinga

Same awarding agency

NAICS: 238210
New
SLED
AHSC Pacific Apartments Transportation Related Amenities (TRA)
Solicitation # PW 26-13
The City of Coalinga is soliciting bids for the AHSC Pacific Apartments Transportation Related Amenities project, funded by the Affordable Housing and Sustainable Communities Program. The primary scope of work involves the assembly, installation, and operation of solar-powered street lights, including Gateways and batteries, to enhance pedestrian and vehicular safety. Installation will occur along University Avenue to Cambridge Avenue, between North Joaquin Street and California Street, and from Coolidge Street to East Roosevelt Street, between Hayes Street and North Garfield Street. The project includes site preparation, removal of vegetation and obstructions, and the construction of new foundations for the lighting systems. The contract will be awarded to the lowest responsive and responsible bidder who must possess a valid California Class A Contractor's license and provide three references for similar projects completed within the last five years. Work must commence within 14 calendar days of the Notice to Proceed and be completed within 30 working days. Compliance requirements include adhering to Buy America certifications, paying prevailing wages for Fresno County Area 2, and following strict non-discrimination standards. Bids must be submitted in a sealed envelope to Tri City Engineering by September 29, 2026, at 10:00 A.M. Payment will be processed using AIA Documents G702 and G703.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
SLED
Four Lift Stations Upgrade Project
Solicitation # PW 26-09
The City of Coalinga is soliciting bids for the Four Lift Stations Upgrade Project (PW 26-09), which involves comprehensive improvements to four sewer lift stations located at La Cuesta Avenue and Phelps Avenue, Kimberly Place and North-End Alley, SR-33/Jayne Avenue, and Sandalwood Park. The scope of work includes mobilization, traffic control, shoring, bypass pumping, recoating pipes and valve vault appurtenances, replacing pump guide rails and cables, and installing concrete pads. Electrical and instrumentation upgrades are a primary focus, featuring automated call and text alarm notifications for water levels and pump failures, as well as quick-connect plugs for portable generators. The Sandalwood Lift Station will receive additional specific upgrades, including a new electrical panel, transducer, radar level transmitter, and a 4-inch bypass connection. The project has an engineer's estimate of 445,000 dollars and must be substantially completed within 180 consecutive calendar days from the date of award, with liquidated damages set at 1,000 dollars per day for delays. Bids are due by 2:00 P.M. on September 29, 2026, and must be submitted in a sealed envelope to Tri City Engineering, Inc. in Fresno, California. The contract utilizes a combination of lump sum and unit price pricing and requires a 10 percent bid security, as well as 100 percent performance and labor and materials bonds. Compliance with Caltrans 2026 Standard Specifications, City of Coalinga 2006 Standards, Buy America requirements, and ADA accessibility is mandatory. Bidders must also adhere to prevailing wage requirements for Fresno County Area 2 and provide at least three project references from the last five years.
Water and Sewer Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS