Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

California Aqueduct Reach 4 PG&E Transmission Line Guard Structure Installations

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Water Resources has issued a Notice of Exemption for the California Aqueduct Reach 4 PG&E Transmission Line Guard Structure Installations project located in Fresno County. This project involves the installation of temporary wooden guard structures designed to catch transmission lines that could fall during overhead tower work conducted by PG&E. The work will take place within the Department of Water Resources right of way at two specific locations along the California Aqueduct Reach 4. At milepost 92.40R, two 45-foot-tall wooden poles will be installed approximately 12 to 15 feet apart, while a single 45-foot-tall pole will be installed at milepost 93.05R. Technical requirements include using an auger-mounted digger truck to drill holes approximately two feet in diameter and eight feet deep, followed by backfilling and compacting the area around the poles. The project is exempt from environmental review under California Government Code Section 6103 and qualifies for categorical exemptions due to the nature of the minor alterations to existing facilities. The Department of Water Resources will issue an Encroachment Permit to facilitate the work, which may require PG&E vehicles to drive off established roads to access the sites. Once the transmission tower work is finished, PG&E is responsible for removing the guard structures and backfilling and compacting the resulting holes to match the original grade. This project is managed by Mark McDaniel, Planner/Scheduler/UC Supervisor, and is categorized under NAICS code 237130.

General Info

PG&E will install temporary wooden guard structures along the California Aqueduct in Fresno.

Agency

California Water Resources, Department of

Place of Performance

MP 93.05R, is about 0.32 miles of intersection of W. Nees Ave and First Lift Canal Rd., CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Mark McDanielPlanner Scheduler/UC Supervisor

Full Description

Show more
PG&E will be conducting overhead transmission line work on existing towers. Most of the work will be done in the air using a helicopter, however, PG&E will install temporary guard structures on the ground in the Department of Water Resources right of way. The guard structures are safety features designed to catch transmission lines that could fall to the ground during work and will consist of wooden poles with accessories for catching overhead wires. Two guard structures will be installed within 12 to 15 feet of each other at California Aqueduct milepost (MP) 92.40R; one guard structure will be installed at California Aqueduct MP 93.05R. PG&E vehicles may need to drive off established roads to access the work sites. For both locations, the accessories for catching overhead wires will first be attached to the wooden poles. At MP 92.40R, an auger-mounted digger truck will drill two approximately two-foot diameter by eight-foot-deep holes, and a 45-foot-tall wooden pole, with the attached accessories, will be installed in each hole. At MP 93.05R, one approximately two-foot diameter by eight-foot-deep hole will be drilled, and a 45-foot-tall wooden pole, with the attached accessories, will be installed in the hole. Once the poles are installed, the area around the guard structures will be backfilled and compacted. PG&E will remove the guard structures when the transmission tower work is complete; the holes left by the removed poles will be backfilled and compacted to match the original grade. Work is necessary to protect the public while PG&E conducts overhead transmission tower work.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
Parsons Corporation is soliciting bids for the Construction Cycle 10 project at the William J. Hughes Technical Center in Atlantic City, New Jersey, supporting the FAA Airport Technology Research and Development branch. The scope of work involves the controlled demolition of existing runway test pavement and the construction of new concrete test slabs measuring approximately 310 by 52.5 feet with a thickness of 15.5 inches. Key requirements include providing aggregate subbase, updating the asphalt base course to a stabilized drainable base, and performing minor design adjustments to plans and specifications. The subcontractor is responsible for procuring all materials, managing waste disposal, and providing geotechnical engineering and roadway materials testing services. The project involves rigorous material characterization tests, including California Bearing Ratio and Plate Load tests, with critical operations phased to allow for continuous subgrade adjustments. Work is primarily scheduled for normal business hours, Monday through Friday, though some after-hours and weekend work may be required. This opportunity is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone certified firms.
Parsons Corporation

POSTED

30 minutes ago

DEADLINE

in 3 months
View Details
NAICS: 237130
New
Federal
Electrical Projects – Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Request for Information
Solicitation # MHMV200009-MHMV120009-MHMV08002
The U.S. Air Force 377th Contracting Division is seeking market intelligence via a Request for Information (RFI) for the demolition and construction of electrical substations at Kirtland Air Force Base, New Mexico. The project involves three primary efforts: the repair of Substation 9 and its feeders, the removal of Substation 23 with load connection to Substation 24A Feeder 5, and the demolition of Substation 3 to facilitate the rebuild of a modern 10,000 KVA consolidated Substation 10. The goal is to modernize the base electrical infrastructure with 12.47 kV distribution systems, eliminate single points of failure, and ensure regulatory compliance. The government is evaluating the feasibility of using a Progressive Design-Build (PDB) delivery method under an Other Transaction (OT) Agreement pursuant to 10 U.S.C. 2808a. The scope of work requires a phased design approach, moving from conceptual design to a final 100% stamped construction document set, with a target completion date of May 2027 or sooner. Technical requirements include compliance with IBC, UFC 3-501-01, NFPA 70, and IEEE C2 standards, as well as strict adherence to Department of Defense cybersecurity protocols for electric meters. Contractors must provide a Critical Path Method schedule and engage an independent testing organization for system calibration. Key administrative requirements include the provision of performance bonds, adherence to Davis-Bacon wage rates, and strict environmental controls regarding hazardous materials and ozone-depleting compounds. Interested firms are requested to provide company profiles, relevant experience, and feedback on the proposed PDB-OTA acquisition strategy.
FA9401 377 Msg Pk

POSTED

about 9 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237130
New
Federal
USFK C4I Communication Tower and Facility Maintenance CY27
Solicitation # W91QVN26QXXXX
Solicitation W91QVN27QA007 is a Firm Fixed Price request for quotations to provide non-personnel maintenance and repair services for 21 C4I Communication Tower sites and related facilities supporting the 41st Signal Battalion in South Korea. The scope of work includes structural integrity assessments, physical inspections for rust and damage, bonding and grounding tests, lighting protection maintenance, LED beacon and side marker light replacement, tower painting, and lead abatement. Specific facility repairs are limited to the interior and exterior of the Osan Bucket C4I Communication Shelter. The period of performance is a 12-month base period running from January 1, 2027, to December 31, 2027, across five primary locations: CP Walker, Highpoint, Osan Bucket, Yongsan, and Papyongsan. Award will be made on an all-or-none basis to the responsible offeror submitting the lowest price technically acceptable offer. Technical acceptability is evaluated on a pass/fail basis, requiring a complete technical package and proof of mandatory ROK business licenses, specifically Information and Communication and Electrical Construction licenses. Key personnel requirements include a Contract Manager, a CQCSM/Safety Manager with an associate degree and five years of relevant experience, and a Lead Technical Engineer. All quotes must be submitted in Korean Won via PIEE by November 18, 2026, and must include both a detailed price breakdown and a completed SF 1449 pricing schedule. Performance will be monitored via a Quality Assurance Surveillance Plan and a Performance Requirements Summary to ensure compliance with NETCOM and Army regulations.
0411 Aq Hq Contract Augmented

POSTED

about 9 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237130
New
SLED
80627Y0173-Neighborhood Internet Installation at HPD Bronx Family Living Center
Solicitation # 80627Y0173
The New York City Department of Housing Preservation and Development is soliciting proposals for the Neighborhood Internet pilot project at the Bronx Family Living Center. The project involves installing a hybrid fiber/fixed wireless internet network, which includes retrofitting two neighboring buildings for hotel-style Wi-Fi service and installing rooftop antennas to establish one building as a wireless hub. The selected vendor must provide 1GB+ fiber backhaul service and ongoing network maintenance for a three-year term. Technical requirements specify that the network must be certified for Wi-Fi 6 (802.11ax) or newer and comply with Citywide Privacy Protection Policies and Protocols. This is a M/WBE Noncompetitive Small Purchase, meaning only New York City-Certified M/WBE firms are eligible to apply. The contract is estimated to be valued at or above $200,000, making Local Law 63 applicable. Proposals are evaluated primarily on experience, qualifications, and capacity (75% weight), specifically regarding residential wireless and hybrid fiber/wireless deployments. Subcontracting is limited to 40% of the total contract amount, with non-M/WBE subcontractors capped at 20%, though fiber backhaul providers are exempt from this limit. All submissions, including cost proposals and required affirmations regarding the Iran Divestment Act, Macbride Principles, and tax status, must be completed through the PASSPort system.
Department Of Housing Preservation And Development

POSTED

about 21 hours ago

DEADLINE

in 17 days
View Details
NAICS: 237130
New
SLED
Underground Utility District 38 Overhead-to-Underground Service Conversions
Solicitation # CS 09-26-07
Alameda Municipal Power (AMP) is soliciting bids for the Underground Utility District 38 Overhead-to-Underground Service Conversions project (CS 09-26-07). The primary objective is to safely convert 195 residential electrical services from overhead to underground routing without increasing customer capacity or modernizing existing customer-owned equipment, which will be reused if deemed safe by the City Building Division. The scope includes the installation of approximately 8,389 linear feet of aluminum service conductors across standard and 3-inch lateral locations. The project is expected to start around March 1, 2027, and must be completed within 365 calendar days of the Notice to Proceed. Eligible bidders must possess a valid California C-10 Electrical Contractor license and be registered with the Department of Industrial Relations. A mandatory virtual pre-bid meeting was held on November 5, 2026, and all bids must be submitted via the OpenGov Bid Portal by November 25, 2026. The contract will be awarded to the lowest responsive and responsible bidder based on capacity, experience, and past performance. Required submissions include a 10% bid security, a subcontractor list, and a bid schedule. Once awarded, the contractor must provide performance and payment bonds for 100% of the contract price and adhere to the City of Alameda Project Stabilization Agreement to ensure labor harmony and prevailing wage compliance.
Engineering and Operations

POSTED

about 22 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237130
New
SLED
Pre-Qualification: Overhead Contact System (OCS) Rehabilitation Project Phase 4A – Tasman West/East
Solicitation # C26152F
The Santa Clara Valley Transportation Authority (VTA) is soliciting pre-qualifications for the Overhead Contact System (OCS) Rehabilitation Project Phase 4A – Tasman West/East (Contract C26152F). This project, with an estimated construction cost between 1.7 million and 2.3 million dollars, involves the detailed engineering design, procurement, and installation of new 300 kcmil contact wire, registration insulators, in-span insulators, and surge arresters along Tasman Drive and East Java Drive. Work will be performed in an active light rail operating environment, requiring strict adherence to VTA safety procedures and close coordination to minimize service interruptions, particularly near the agency's only LRV wash facility. To be eligible to submit a sealed bid, firms must be approved through a two-stage pre-qualification process. Applicants must submit a completed qualification questionnaire and a Statement of Qualification Certification Form via the VTA eProcurement portal by December 14, 2026. Minimum requirements include the successful installation of at least 5 miles of OCS for a mainline electrification railroad or urban transit system within the last 10 years, with each contract valued at a minimum of 800,000 dollars. Management and supervisory personnel must also possess equivalent experience. Qualification is determined by a scoring matrix, where scores below 55 result in disqualification, and scores of 72 or higher on two interviews are sufficient for approval. Final contract award will be granted to the lowest responsive and responsible bidder.
Engineering and Program Delivery

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS