Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

California High-Speed Rail Project - Los Angeles to Anaheim Project Section

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California High Speed Rail Authority

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

See NOC Attachment, Section 2, pg 1, CA, See NOC At

Set-Aside

NONE

Documents

(106)

LAA EIR-EIS Appendix 3.13-B Land Use Tables

PDFenvironmental-impact-report-appendix

Appendix 3.2-D Horizon Year 2040 Post-Mitigation Level of Service

PDFappendix

v3_LAA-PEPD-Vol3

PDF

v2_LAA_EIR-EIS Appendix 03 Airport Obstructions

PDFenvironmental-impact-report-appendix

v3_LAA-PEPD-Vol3

PDF

Volume 2 Technical Appendices for LAA EIR-EIS

PDFtechnical-appendices

California High-Speed Rail Los Angeles to Anaheim Draft EIR/EIS Volume 1 Preface

PDFeir-eis

California High-Speed Rail Project - Notice of Completion & Environmental Document Transmittal

PDFnotice-of-completion

LAA EIR-EIS Appendix 3.2-C Traffic Counts Validation Memo July 2024

PDFmemo

Los Angeles to Anaheim Project Section Agricultural Farmland EIR-EIS v1

PDFeir-eis

Los Angeles to Anaheim Project Section Noise and Vibration EIR/EIS v1

PDFenvironmental-impact-report

California High-Speed Rail Authority Operations and Service Plan Appendix 2-E

PDFservice-plan

California High-Speed Train Project Vol 3 Preliminary Engineering Plan and Profile

PDFplan

LAA EIR-EIS Appendix 3.12-A Relocation Assistance Benefits

PDFappendix

California High-Speed Rail Project Los Angeles to Anaheim Environmental Document

PDFenvironmental-document

LAA EIR-EIS Acronyms and Abbreviations

PDFother

Metrolink Buena Park Station Relocation Analysis December 2025

PDFenvironmental-impact-report

LAA-PEPD Volume 3.2 General, Aerial Structures & Retaining Walls

PDFpreliminary-engineering-document

LAA EIR-EIS References Document

PDFreferences

California High-Speed Rail Project - Los Angeles to Anaheim Notice of Completion

PDFnotice-of-completion

Appendix 3.12-D Bikeway Maps for LAA EIR-EIS

PDFappendix

LAA-PEPD-Vol3.3A General & State College Grade Separations

PDFsow

LAA EIR-EIS Section 3.8 Hydrology and Water Resources

PDFenvironmental-impact-report

Draft Environmental Impact Report/Environmental Impact Statement Alternatives Chapter for California High-Speed Rail

PDFeir-eis

Preconstruction Electromagnetic Measurement Survey Appendix 3.5-A

PDFappendix

Appendix 2-A: Impact Avoidance and Minimization Features for California High-Speed Rail Los Angeles to Anaheim Project

PDFappendix-impact-avoidance-minimization

Appendix 4-B Cultural Resources Evaluated for Section 4(f) Use

PDFappendix

LAA EIR-EIS Volume 14 Index

PDFother

LAA EIR-EIS Public and Agency Involvement Chapter

PDFenvironmental-report

Caltrans Comments on CA High-Speed Rail EIR/EIS Draft

PDFcomment

California High-Speed Rail Authority Los Angeles to Anaheim Project Section Preferred Alternative

PDFeis

Los Angeles to Anaheim Project Section Draft Environmental Impact Report/Environmental Impact Statement Volume 1

PDFenvironmental-impact-report

Los Angeles to Anaheim Project Section Air Quality and Climate EIR/EIS v1

PDFenvironmental-impact-report

California High-Speed Train Project Volume 3 Preliminary Engineering Plans

PDFspecifications

LAA-PEPD Volume 3.3 General & Grade Separations

PDFsow

LAA EIR-EIS Volume 10 Distribution and Repository Locations

PDFother

LAA EIR-EIS Section 3.9 Geology, Soils, Seismicity, and Paleontological Resources

PDFeir

CDFW Comments on California High-Speed Rail EIR/EIS SCH No. 2007031067

PDFcomment-letter

LAA EIR-EIS Appendix 3.6-A Water Use and Energy Analysis Technical Appendix

PDFtechnical-appendix

California High-Speed Rail Authority Los Angeles to Anaheim Project Section Volume 2 Cover

PDFother

LAA EIR-EIS Glossary of Terms

PDFglossary

LAA EIR-EIS Project Costs and Operations Chapter

PDFcost-estimate-report

LAA EIR-EIS List of Preparers

PDFother

Los Angeles to Anaheim Project Section Draft Environmental Impact Report/Environmental Impact Statement Volume 2

PDFenvironmental-impact-report

LAA EIR-EIS Appendix 3.4-A Noise and Vibration Mitigation Guidelines

PDFappendix

LAA EIR-EIS Section 3.15 Parks, Recreation, and Open Space

PDFenvironmental-impact-report

California High-Speed Rail Los Angeles to Anaheim Draft EIR-EIS December 2025

PDFenvironmental-impact-report

v3_LAA-PEPD-Vol3

PDF

LAA EIR-EIS Appendix 3.12-E Business Displacement Maps

PDFappendix

Los Angeles to Anaheim Project Section Hazardous Materials and Wastes EIR/EIS v1

PDFenvironmental-impact-report

Los Angeles to Anaheim Project Section Draft EIR/EIS Summary

PDFeir-eis-summary

LAA EIR-EIS Cultural Resources Section

PDFenvironmental-impact-report

Appendix 4-A: Park and Recreation Areas Evaluated for Section 4(f) Use

PDFappendix

Appendix 3.11-A Safety and Security Data for LAA EIR-EIS

PDFappendix

LAA NOA 251121 Draft EIR/EIS Public Notice

PDFspecial-notice

LAA EIR-EIS Appendix 6-B PEPD Capital Cost Estimate Report 2025

PDFcost-estimate-report

LAA EIR-EIS Appendix 3.1-B Footprint Mapbook

PDFappendix

Vehicle Miles Traveled Memorandum for California High-Speed Rail

PDFmemorandum

LAA-PEPD Volume 3.8 General & Link Union Station by LA Metro

PDFpepd-design-submittal

Appendix 6-A: High-Speed Rail Operating and Maintenance Cost for EIR/EIS Analysis

PDFsow

LAA-PEPD Volume 3.5 General & Stations Basis of Design Summary

PDFsow

Appendix 3.12-C Public Facility Maps for LAA EIR-EIS

PDFappendix

LAA Project Section Draft EIR/EIS Cumulative Impacts Analysis

PDFenvironmental-impact-report

LAA EIR-EIS Appendix 4-C Coordination Letters

PDFappendix

California High-Speed Rail Project - Los Angeles to Anaheim Summary Form

PDFenvironmental-summary

Los Angeles to Anaheim Project Section Environmental Impact Report/Environmental Impact Statement - Station Planning, Land Use, and Development

PDFeir-eis

LAA EIR-EIS Section 3.6 Public Utilities and Energy

PDFenvironmental-impact-report

Appendix 3.2-B Traffic Mitigation Locations

PDFappendix

Los Angeles to Anaheim Project Section Draft EIR/EIS - Aesthetics and Visual Quality

PDFenvironmental-impact-report

Appendix 9-A: List of Key Public and Agency Meetings

PDFappendix

Appendix 3.13-C Zoning Tables for Resource Study Area

PDFappendix-zoning-tables

Draft Section 4(f) and 6(f) Evaluations for California High-Speed Rail Los Angeles to Anaheim Project

PDFenvironmental-impact-report-section

LAA EIR-EIS Volume 1 Cover Draft Environmental Impact Report December 2025

PDFenvironmental-impact-report

v3_LAA-PEPD-Vol3

PDF

Caltrans Division of Aeronautics Comments on CA High-Speed Rail Project SCH #2007031067

PDFcomment

Appendix 3.12-F Children's Health and Safety Risk Assessment for LA to Anaheim HSR Project

PDFenvironmental-appendix

California High-Speed Rail Authority Los Angeles to Anaheim Project Volume 3 Preliminary Engineering

PDFpreliminary-engineering

LAA EIR-EIS Chapter 7 NEPA/CEQA Considerations

PDFenvironmental-impact-report

Los Angeles to Anaheim Project Section Draft EIR/EIS Biological and Aquatic Resources Section

PDFenvironmental-impact-report

LAA EIR-EIS Community Analysis Section

PDFenvironmental-impact-report-section

California High-Speed Rail System Purpose and Need Document

PDFsow

v3_LAA-PEPD-Vol3

PDF

CPUC Comment on California High-Speed Rail Project Los Angeles to Anaheim Section

PDFcomment

LAA EIR-EIS Section 3.11 Safety and Security

PDFenvironmental-impact-report

LAA EIR-EIS Appendix 1-A Project Benefits

PDFappendix

Appendix 3.18-A RIMS II Modeling Details for LA to Anaheim HSR Project

PDFsow

Draft EIR/EIS Chapter 3 - Affected Environment and Mitigation Measures for LA to Anaheim Project Section

PDFenvironmental-impact-report

Los Angeles to Anaheim Project Section Socioeconomics and Communities EIR/EIS

PDFenvironmental-impact-report

LAA EIR-EIS Appendix 3.19-A: Cumulative Plans and Nontransportation Projects List

PDFappendix

Appendix 3.11-B: Existing and Proposed Railroad Crossings for LA to Anaheim HSR Project

PDFappendix

LAA EIR-EIS Appendix 03 Public Facility Tables

PDFappendix

v3_LAA-PEPD-Vol3

PDF

LAA EIR-EIS Appendix 3.1-A Regional and Local Policy Inventory and Consistency Analysis

PDFenvironmental-appendix

LAA EIR-EIS Section 3.5 Electromagnetic Fields and Interference

PDFenvironmental-impact-report

LAA EIR-EIS Volume 1 Table of Contents

PDFenvironmental-impact-report

Appendix 3.13-A Existing Land Uses and Zoning Figures

PDFsow

v3_LAA-PEPD-Vol3

PDF

LAA EIR-EIS Appendix 2-D Station Access Methodology Report

PDFsow

Los Angeles to Anaheim Project Section Draft EIR/EIS Regional Growth Analysis

PDFenvironmental-impact-report

LAA EIR-EIS Appendix 9-B Inclusive Public Engagement Plan December 2025

PDFsow

LAA EIR-EIS Appendix 03 Potential Environmental Concern Sites

PDFappendix

v3_LAA-PEPD-Vol3

PDF

CEQA Comment Letter for California High-Speed Rail Project - Los Angeles to Anaheim

PDFcomment-letter

LAA EIR-EIS Appendix 02-B Applicable Design Standards

PDFspecifications

Appendix 3.19-B: Cumulative Transportation Projects List for CA High-Speed Rail LA to Anaheim

PDFappendix

Los Angeles to Anaheim Project Section Transportation EIR/EIS v1

PDFenvironmental-impact-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia High Speed Rail Authority
Contacts1 person available
OfficeN/A
Organization / Agency
California High Speed Rail Authority
Office AddressN/A
Contacts
Stefan Galvez-AbadiaDirector of Environmental Services

Full Description

Show more
A Statewide Program (Tier 1) EIR/EIS was completed in November 2005 as the first phase of a tiered environmental review process for the proposed California High-Speed Rail (HSR) System planned to provide a reliable high-speed electric-powered rail system that links the major metropolitan areas of the state and that delivers predictable and consistent travel times. A further objective is to provide an interface with commercial airports, mass transit, and the highway network and to relieve capacity constraints of the existing transportation system as intercity travel demand in California increases, in a manner sensitive to and protective of California’s unique natural resources. The California High-Speed Rail Authority has prepared a Draft EIR/EIS that further examines the Los Angeles to Anaheim Project Section (project section). The approximately 30-mile project section would provide HSR service between LAUS in Los Angeles and ARTIC in Anaheim. New HSR infrastructure at LAUS was already approved as part of the Burbank to Los Angeles Project Section in January 2022 or is studied as part of the Los Angeles County Metropolitan Transportation Authority Link Union Station Project EIS. This project section would connect to the HSR System’s current southern terminus at LAUS. This Draft EIR/EIS evaluates the impacts and benefits of a No Project Alternative and two build alternatives: Shared Passenger Track Alternative A and Shared Passenger Track Alternative B. The Authority’s Preferred Alternative under NEPA, which serves as the proposed project for CEQA, is Shared Passenger Track Alternative A. Shared Passenger Track Alternative A proposes approximately 30 miles of new and upgraded track, overhead contact system, maintenance and traction power facilities (including a light maintenance facility at 26th Street in the City of Vernon), additional freight rail track (including storage track replacement at Hobart Yard), grade separations, drainage improvements, communications towers, security fencing, modifications to passenger train stations, and other necessary facilities to introduce HSR service into the existing Los Angeles – San Diego – San Luis Obispo Rail Corridor from south of LAUS beginning at the northern edge of U.S. Highway 101 to ARTIC. New and upgraded tracks would allow other trains to share tracks with HSR. The Preferred Alternative includes an HSR station at ARTIC. Although not included in the Preferred Alternative, the Draft EIR/EIS also evaluates an option for one intermediate HSR station, which would consist of adding an HSR station platform and station facilities at either the Norwalk/Santa Fe Springs Metrolink Station or the Fullerton Metrolink/Amtrak Station. Consistent with the Authority’s commitment to invest in regionally important early action projects to provide early benefits to transit riders and local communities in Southern California, while laying a solid foundation for implementation of the HSR system, both Shared Passenger Track Alternatives include early action projects (grade separations; freight or passenger rail track infrastructure; and improvements at passenger rail stations), which would improve safety and provide immediate mobility and reliability benefits for existing freight and passenger rail operations. These early action projects may be implemented by the Authority in collaboration with local and regional agencies, or by those other agencies relying on this Los Angeles to Anaheim Project Section EIR/EIS in advance of the HSR system as stand-alone projects. These early action projects may also be the subject of an environmental review process completed earlier than the Los Angeles to Anaheim EIR/EIS process by other implementing entities. Additional infrastructure may be required by third parties to utilize the proposed HSR improvements, and these future improvements will be studied and approved in future environmental documents in accordance with federal and state law.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
45th Ave SW Culvert Replacement and Habitat Restoration
Solicitation # 45th-ave-sw-culvert-replacement-habitat-restoration
The City of Seattle is seeking contractors for the replacement of a culvert along 45th Avenue SW and the associated restoration of surrounding habitat, with the project located in King County, Washington. The solicitation, identified as 2025-017, is open to Minority Business Enterprises certified by NMSDC and Woman Business Enterprises certified by WBENC, reflecting the city’s commitment to inclusive contracting practices. The work involves the removal of the existing infrastructure and installation of a new culvert system designed to improve water flow and structural integrity, while simultaneously restoring natural habitat features to support local ecosystems. The project is classified under NAICS code 237990, indicating it falls under other heavy and civil engineering construction, and the prime contractor is Shimmick Construction Company, Inc., which manages the solicitation process and serves as the point of contact for inquiries. The response deadline is August 12, 2026, with Jamie Miranda listed as the primary contact for all communications, reachable at 707-410-5070 or jmiranda@shimmick.com. While the physical location is in Seattle, no specific street address or zip code is provided in the data, and all performance is expected to occur within the state of Washington.
Shimmick Construction Company, Inc

POSTED

about 11 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
International
City of Calgary - Request for Proposal - RFP 26-1667 For Glenmore RWPS Penstock Crossover Piping and Valve Replacement
Solicitation # AB-2026-05612
The City of Calgary is seeking qualified contractors to perform construction services for the Glenmore Raw Water Pump Station Penstock Crossover Piping and Valve Replacement project, which involves the complete replacement of existing penstock crossover piping and associated valves, demolition of the current standpipe, and lead abatement on existing infrastructure. The scope includes the supply, installation, testing, and commissioning of new crossover and standpipe piping systems, along with all valves, fittings, supports, steelwork, platform structures, grating, and other miscellaneous metalwork required to restore and enhance system functionality. All work must comply with applicable safety and environmental standards, particularly regarding lead abatement procedures. This opportunity is exclusively available to contractors pre-qualified by the City of Calgary and is issued under solicitation number AB-2026-05612, posted on August 8, 2026, with responses due by September 1, 2026. Proposals must be submitted via SAP Ariba, where detailed technical and administrative requirements are outlined in the RFP documents. The project is located in Alberta, and all inquiries should be directed to Waris Khattana, the primary point of contact, via the provided email or phone number. Only firms meeting the City’s pre-qualification criteria will be considered for award.
City of Calgary

POSTED

about 14 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237990
New
SLED
27003-B Solids Removal
Solicitation # PE-65600-NONST-2027-000000250
Fayette County, Georgia is soliciting bids for the dredging and solids removal from lagoons under solicitation number PE-65600-NONST-2027-000000250, titled 27003-B Solids Removal. Interested contractors must submit their proposals by 3:00 p.m. on Tuesday, September 8, 2026, to the Purchasing Department located at 140 Stonewall Avenue West, Suite 204, Fayetteville, GA 30214. The opportunity is open to all qualified bidders without specific set-aside restrictions, and all bids must comply with the detailed requirements outlined in the attached Invitation to Bid document. The work will be performed within Fayette County, Georgia, and the county anticipates selecting a contractor capable of safely and efficiently removing accumulated solids to maintain lagoon functionality and regulatory compliance. All questions regarding the bid should be directed to Colette Cobb, the primary point of contact, via email at ccobb@fayettecountyga.gov or by phone at 770-305-5115. The solicitation was posted on August 7, 2026, and additional information, including full bid documents, can be accessed through the official state procurement portal using the provided UI link. Contractors are responsible for reviewing all documentation thoroughly prior to submission, as failure to meet specifications or deadlines may result in bid rejection. The county reserves the right to accept or reject any or all bids without explanation, and award decisions will be made based on compliance, competitive pricing, and demonstrated technical capability.
Fayette County Board of Commissioners

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Fern Ridge Wildlife Area Coyote Creek Boating Access
Solicitation # S-63500-00017424
The Oregon Department of Fish and Wildlife is soliciting bids for the construction of a boating access facility at Coyote Creek within the Fern Ridge Wildlife Area under solicitation number S-63500-00017424. The project involves a range of civil and infrastructure construction activities including earthwork, driving steel piles, installing a paddle craft launch dock, sheet piling, storm drain piping and conveyance systems, aggregate base placement, concrete curbing and sidewalk construction, and asphalt paving. All work must be completed in accordance with specifications to ensure safe and durable access for recreational boating users. The solicitation is open to qualified contractors with no specific set aside identified and is managed through the state agency’s procurement system. Responses are due by September 3, 2026, at 11:00 PM Pacific Time, with the request publicly posted on August 7, 2026. The contract will be managed by the Oregon Department of Fish and Wildlife based in Salem, Oregon, with Claire Duvall listed as the primary point of contact. The place of performance is located in Salem, Oregon, and all work must be carried out at the designated site within the Fern Ridge Wildlife Area. Contractors are expected to comply with all state and federal regulations governing construction in protected wildlife areas, and full details are accessible through the provided online portal.
ODFW

POSTED

about 19 hours ago

DEADLINE

in 26 days
View Details