Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

California Vegetation Treatment Program (CalVTP) Update

Forecast
2019012052State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Tuolumne County Resource Conservation District is implementing two primary fuel reduction initiatives in Tuolumne County, California, under the California Vegetation Treatment Program. The Summerville-Tuolumne Vegetation Management Project covers up to 1,067 acres near Tuolumne City and Summerville High School, utilizing a two-phase approach. Phase I involves herbicide application on 136 acres, while Phase II focuses on initial mechanical and manual treatments and pile burning across approximately 930 acres, with maintenance scheduled two to three years later. Simultaneously, the Jamestown Road Fuels Management Project targets approximately 670 acres to create a shaded fuel break using mastication, chipping, hand cutting, and piling and burning, with a target residual tree spacing of 25 to 30 feet for trees under 12 inches dbh. Both projects are managed by District Forester Frank Lewicki and have been approved following environmental reviews that determined no significant environmental effects. Compliance is maintained through the CalVPT Program EIR and the project's Mitigation Monitoring and Reporting Program, adhering to CEQA guidelines. The combined scope of work employs a variety of treatment methods, including mechanical, manual, prescribed burning, herbivory, and herbicide applications to reduce fire risk in the region.

General Info

Tuolumne County RCD fuel reduction projects using mechanical and chemical treatments across 1,737 acres.

Place of Performance

Big Hill Road x Lyons Bald Mountain Road, Sonora, CA, 95370

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Tuolumne County Resource Conservation District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Frank T. LewickiDistrict Forester

Full Description

Show more
The Tuolumne County Resource Conservation District (TCRCD) is proposing the Big Hill-Lyons Fuels Management Project in portions of the Peppermint Creek-Woods Creek, Lower South Fork Stanislaus River, and Sullivan Creek watersheds near the communities along Big Hill Road and adjacent to Sonora, Phoenix Lake, Quail Ridge Ranch, Comstock Ranch and Cedar Ridge in Tuolumne County. Treatment types and activities will occur on up to an eventual 14,856 acres. This acreage includes some areas that may not end up being treated for lack of landowner acceptance and funding and contractor availability or site specific conditions such as steep slopes, economic feasibility or site specific concerns (e.g. cultural sites or sensitive species). Project Description: The goal of the Big Hill-Lyons Fuels Management Project is to reduce the risk of wildland fire to land adjacent to portions of the Phoenix Lake, Quail Ridge Ranch, Comstock Ranch, Cedar Ridge and Big Hill communities, residences along Lyons Bald Mountain Road and the City of Sonora by decreasing the amount and continuity of hazardous fuel loading in the wildland urban interface (WUI) and creating strategic shaded fuel breaks along major ingress and egress routes. These vegetation treatment types and activities are intended to create conditions that will minimize fire behavior and to create a mosaic condition that is more resistant to stand replacing type fires. Of the 14,856 acres in the project area, 14,523 acres are located in the CalVTP Treatable Landscape and 333 acres are outside of, but adjacent to, the mapped Treatable Landscape. The acres outside of the Treatable Landscape have similar topographic, environmental, and vegetative conditions that are essentially the same to those acres within the Treatable Landscape. This project ranges from 2,200 feet to 5,000 feet in elevation and contains varying aspects and topography with slopes ranging from less than 10% to over 60%. The vegetation types in this project would best be described as tree and shrub with overstory species consisting primarily of interior live oak, California gray pine, valley oak, California black oak, blue oak, ponderosa pine and incense cedars and understory species consisting of manzanita, chamise, poison oak, toyon, yerba santa and ceanothus. Initial and Maintenance Treatments The treatment types that may be implemented are shaded fuel breaks and wildland urban interface (WUI) fuel reduction. The shaded fuel breaks were strategically located along roadsides that provide critical ingress and egress routes for residents and emergency personnel and would have a maximum width of 300 feet. WUI fuel reduction areas were determined to be the locations where the proximity of private property and high fuel loads were very close and posed a high likelihood that a fire that started in one location could impact the other. Generally, brush vegetation and smaller trees would be removed and thinned in a mosaic pattern to reduce ladder fuels and canopy connectivity while still maintaining patches of vegetation throughout the project area to enhance habitat quality. Larger trees would be retained to try and shade out shrub regeneration. The proposed treatment activities for both initial and maintenance treatments may consist of mechanical treatment, manual treatment, prescribed herbivory, herbicide application and prescribed burning (broadcast and piles). Mechanical treatment will often be utilized in both initial and maintenance treatment phases based on current vegetation loads, site conditions, economic factors, and different landowner preferences. The entire Big Hill area is covered in dense stands of vegetation and will benefit from the controlled break up of vegetation that mechanical treatments may provide over other methods when in proximity of private property (like in the WUI), along roadways, and near sensitive areas. Mechanical treatment will occur over the primary area of the project (up to 14,447 acres) and consist of uprooting vegetation or masticating and chipping material to a specified maximum length and depth and dozer piling. Masticators, skid steers, dozers, excavators, brush rakes, chippers, and equipment operators will be used during implementation with crew sizes anticipated to be between one and 60 crew members. Up to five crews could be conducting treatments simultaneously across the project area. Slash disposal will be distributed across the landscape or piled for burning. Some biomass removal off site may occur. The project has several areas that are too steep or deemed to be more sensitive (like WLPZs) that preclude the effective use of mechanical treatment. As such, manual treatment may be utilized in order to cut, clear, and prune vegetation. Manual treatment will consist of hand crews thinning or pruning vegetation with chain saws, and either lop and scattering, chipping, or piling (for burning) the material. Manual treatment is expected to occur year round (up to 14,447 acres) weather permitting, unless precluded by a sensitive species. Prescribed burning may consist of pile burning (up to 11,182 acres) or broadcast burning (up to 14,856 acres). This method of vegetation management is intended to manage fuel loading by reducing the amount of cut material left on the landscape after mechanical and manual treatments and allows for fuel removal in areas that are harder to access by other methods (like rock outcrops). Generally, pile burning may be used as a complement to initial mechanical and manual treatments, while broadcast burning would be more of a maintenance option. Broadcast burning reintroduces fire back to the landscape and more closely mimics the natural fire regime of the area. Prescribed burning will generally occur after manual and mechanical treatments have been completed to allow for appropriate fuel loads, time to dry piled material, and favorable weather conditions, likely late fall to early spring. Prescribed herbivory may be used as an initial treatment in areas that preclude the effective use of other methods; however, it is generally proposed as a maintenance treatment expected to occur at least 1 year after initial treatments depending on vegetation regeneration and the availability of funding and contractors. Prescribed herbivory will be used to slow the regeneration of understory shrubs and maintain low fuel loads utilizing goats, cattle, or sheep. It could occur on up to 13,478 acres in the project area during the appropriate window for the species being targeted, unless precluded by a sensitive species or area. Herbicide application may be used as an initial treatment in areas that preclude the effective use of other methods; however, it is generally proposed as a maintenance treatment expected to occur at least 1 year after initial treatments depending on vegetation regeneration and the availability of funding and contractors. Herbicide application may include any of the 10 listed herbicides analyzed in the PEIR depending on the primary species that regrows within the project area.

Similar Contracts

Same NAICS industry code

NAICS: 561730
New
SLED
IFB Tree Trimming, Pruning, & Removal Services, Los Angeles & Ventura Counties
Solicitation # 07A6504
The California Department of Transportation (Caltrans) is soliciting bids for tree trimming, pruning, and removal services within Los Angeles and Ventura Counties. The contractor is responsible for providing all necessary labor, equipment, and materials to perform thinning, skirting, and the removal of shrubs, vines, and trees, including palm trees. Key technical requirements include maintaining a 17-foot vertical clearance over traveled ways and shoulders and ensuring visibility for highway signs and safety devices. While above-ground removal is required, stump grinding or removal is explicitly prohibited. The contract is estimated to run from January 1, 2027, through December 31, 2029, with work assigned via routine requests (5-day response) and non-routine requests (24-hour response). Award will be granted to the lowest responsive and responsible bidder, with specific incentives available for DGS-certified Disabled Veteran Business Enterprises (DVBE), Small Businesses, and Microbusinesses. Compliance with State General Prevailing Wage Rates, SB 1383 organic waste regulations, and OSHA standards for line-clearance trimming is mandatory. Bids must be submitted in physical format by November 24, 2026, and must include all required certifications. Payment is contingent upon the submission of a Payee Data Record and certified payroll records, with all invoices submitted in triplicate to the Camarillo office.
California Department of Transportation

POSTED

about 11 hours ago

DEADLINE

in 17 days
View Details
NAICS: 561730
New
SLED
Athletic Field Turf Renovation and Hydroseeding
Solicitation # 2026-IFB-LM-0581
The City of Pasadena, through the Department of Parks, Recreation and Community Services, is soliciting bids for the renovation and hydroseeding of approximately seven acres of natural turf athletic fields at Victory Park. The project involves a comprehensive scope of work including preconstruction irrigation inspections, gopher mitigation, and soil processing to a minimum depth of eight inches to eliminate compaction. The goal is to establish a safe, durable, and properly graded athletic field. The anticipated start date is November 30, 2026, with a strict requirement that all initial renovation, grading, and hydroseeding be completed within 14 calendar days. The contract will be awarded to the lowest and best bidder, with evaluation factors extending beyond price to include material quality, bidder capability, financial resources, and past performance. To be considered responsive, bidders must provide pricing for every line item and possess a valid California Contractors State License Board C-27 Landscaping Contractor license. Submissions must be made via the City's eProcurement Portal by November 20, 2026. Key compliance requirements include adherence to State of California prevailing wage rates, CAL/OSHA safety standards for confined spaces, and ADA accessibility guidelines. Additionally, the successful bidder must provide a 5% electronic bid bond and maintain an active registration with SAM.gov.
Parks, Recreation and Community Services Department

POSTED

about 12 hours ago

DEADLINE

in 14 days
View Details
NAICS: 561730
New
SLED
Independence Jail Landscaping
Solicitation # ZP 24-020
The Independence Jail Landscaping project, managed by the Inyo County Public Works Department under solicitation ZP 24-020, involves comprehensive landscaping services including excavation, grading, irrigation installation, and planting. The project requires a contractor with at least one year of landscaping experience and a valid CA State License Board number. Key technical requirements include adherence to the Model Water Efficient Landscape Ordinance (MWELO), the provision of a Soil Management Report, and the implementation of an irrigation system with a distribution uniformity low quarter of 0.65 or higher. The contractor is responsible for providing all labor, materials, and equipment, as well as delivering training on planting techniques and ongoing maintenance. All work must comply with the 2010 Americans with Disabilities Act (ADA), Inyo County Public Works Standard Specifications from May 2020, and prevailing wage rates. Bids must be submitted electronically via the OpenGov portal by December 11, 2026. Required submission materials include a bid proposal, vendor certifications, and a proposal guarantee of ten percent of the total bid amount. Upon contract award, the contractor must provide a Faithful Performance Bond and a Labor and Materials Payment Bond, both for 100 percent of the contract amount. The estimated construction cost for the project is 97,140.00. Final acceptance is contingent upon a Certificate of Completion certified by a licensed landscape contractor or architect, supported by as-built drawings, irrigation audit reports, and soil analysis documentation.
Public Works

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 561730
New
SLED
Iredell County Snow Plowing Services
Solicitation # 27-455-RFP-03
Iredell County is soliciting bids for snow plowing services under solicitation number 27-455-RFP-03 to ensure safe public access and operational continuity at various county facilities. The contractor is responsible for providing all labor, equipment, and materials to remove snow and ice, with a requirement that surfaces be clear and safe by 7:45 A.M. on business days. The scope includes standard removal for 2-4 inches of accumulation and alternate removal for 5-8 inches, with a mandatory response time of two hours following notification. Optional services for sidewalk clearing and salt preparation are also available. Performance locations span multiple sites in Statesville, Harmony, and Troutman, including the Government Center, Public Safety, and various EMS bases. Bids must be submitted via the OpenGov Procurement Portal by 3:00 PM on November 20, 2026. Awards will be granted to the lowest responsible, responsive bidder based on a combination of pricing, experience, equipment quality, and the ability to meet response times. Applicants must provide a detailed pricing schedule, a summary of qualifications, a copy of their snow removal policies, and three to five professional references. Required certifications include the Iran Divestment Act eligibility. Contractors must maintain comprehensive insurance, including $2,000,000 in general liability and $1,000,000 in automobile liability, with all policies written on an occurrence basis and insurers maintaining an A.M. Best rating of at least A-.
Facility Services Director

POSTED

about 13 hours ago

DEADLINE

in 13 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS