Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Call 009 C27033

Open
C27033State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Colorado Department of Transportation is implementing a project to rehabilitate corrugated metal pipes, specifically focusing on non-qualifying and minor culverts across Region 4. The primary objective is to extend the design life of existing infrastructure and increase resiliency on state and federal roadways by utilizing Cured In Place Pipe treatment. An in-house collaboration team will manage the development of preliminary and final design plans, specifications, and estimates, ensuring all work meets Field Inspection Review and Final Office Review milestones. The scope of work includes hydrologic and hydraulic analysis, the acquisition of necessary No Rise certifications, and the development of floodplain development permits and stormwater management plans. Project management will involve monthly progress meetings and weekly technical sessions to coordinate the repair and replacement of specific culverts located across Weld, Washington, and Phillips counties. This contract is not designated as a set-aside.

General Info

CDOT will rehabilitate Region 4 culverts using Cured In Place Pipe treatment.

Place of Performance

Weld, Washington, Phillips, CO, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyColorado Department of Transportation
ContactsNo contacts available
OfficeCO, USA
Office AddressCO, USA
ContactsNo contact information available

Full Description

Show more
CMPs of any size (herein referred to as culverts) have been identified and prioritized by CDOT Staff. CDOT classifies culverts into three categories: non qualifying (less than 48-inches), minor culverts (48 inches or greater), and major structures (20-foot span or greater). This project will have an emphasis on non-qualifying culverts and some minor culverts. The project aims to rehabilitate the identified culverts by lining them with a Cured In Place Pipe (CIPP) treatment. The primary goals of the overall project include (1) adding design life to existing CMPs on state and federal roadways, (2) increasing the resiliency of CDOT infrastructure assets, and (3) utilizing remaining available funds from Phase 1 to repair and or replace as many CMPs as possible across Region 4. An in-house collaboration team from the Design Unit and Hydraulic Residency will develop preliminary and final design plans, specifications and estimates (PS&E) related to the repair and replacement of CMP culverts in Phase 2. Preliminary correlates to the Field Inspection Review (FIR) milestone in CDOT project delivery, and final design is the Final Office Review (FOR) milestone prior to advertisement. All PS&E will include culvert locations and information, culvert repair details and notes, culvert replacement design, initial construction scheduling, and construction phasing as applicable. The same in-house team will also be responsible for hydrologic and hydraulic analysis and design for the repair or replacement of culverts (mainly minor structures and others as directed by Resident Engineers). If needed, the in-house team will obtain any necessary No Rise certifications within regulatory floodplains, obtain floodplain development permits (FDPs) from local agencies, and develop a floodplain memorandum. A comprehensive hydraulic memo or summary matrix will be prepared that includes any culverts requiring a hydrologic or hydraulic analysis; separate reports will not be prepared. A stormwater management plan (SWMP) will be prepared as a template or a few templates similar to Phase 1, and as determined by the Region 4 Environmental team. The PE/PM will hold monthly progress meetings in addition to milestone meetings for the preliminary and final design review. A small team weekly meeting will also be hosted for the Hydraulics and Design team members. Work will take place at the following locations, data is presented in the format: Lining Number, Culvert Name, Highway, Mile Post. L5, CULV26684, 024B, 433.50; L12, 052A031900BL, 052A, 31.90; L13, CULV27768, 052B, 106.50; L15, 059B133660BR, 059B, 133.66; L16, CULV26019, 059B, 150.00; L17, CULV29469, 061A, 3.42; L18, 061A005370BL, 061A, 5.37; L19, CULV21821, 061A, 18.08; L20, 061A025850BL, 061A, 25.85; L32, 144A024540BR, 144A, 24.54; L34, 144A024710BR, 144A, 24.71; L36, CULV32878, 385D, 275.48; L37, CULV33246, 385D, 296.50; L38, CULV25473, 059B, 133.64.

Similar Contracts

Same NAICS industry code

More opportunities from Colorado Department of Transportation

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS