This Solicitation opportunity from Georgia was posted on January 1, 1970. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Call 020 B3CBA2602590-0

Closed
B3CBA2602590-0State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
ITB # 002-26 Asphalt Road Resurfacing and Milling
Solicitation # PE-62350-NONST-2026-000000015
The City of Fort Oglethorpe is soliciting sealed bids for ITB #002-26, which involves asphalt road resurfacing and milling on various city streets within Fort Oglethorpe, Georgia. The project scope includes traffic control, milling and patching, recycled asphalt concrete leveling, Superpave Type II asphalt, bitumen tack coat, and thermoplastic striping. Work will be performed on specific streets such as Century Station Drive, Outpost Drive, and others, depending on available funding. The project must be completed by June 30, 2027. Bids must be delivered to the City Clerk and Assistant Finance Director by Thursday, December 3, 2026, at 2 p.m. The award will be granted to the lowest responsive and responsible bidder who is a GDOT-approved contractor and adheres to GDOT specifications. A critical requirement is that the awarded company must self-perform at least 70 percent of the work. Bidders must submit a complete package in a specific order, including the Bid Proposal Form, Bid Fee Form, Execution of Bid Form, Exception Sheet, Affidavit of Non-Collusion, Certificate of Insurance, and an E-Verify Compliance Affidavit. Additionally, contractors must provide a Georgia Occupational Tax Certificate and maintain minimum Worker's Compensation and General Liability Insurance. All written inquiries must be submitted by November 20, 2026.
City of Fort Oglethorpe

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix and precast concrete. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Qualified bidders must possess a valid California Contractor license and provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must be certified by recognized agencies such as the SBA, MBDA, or CUCP prior to the bid opening. The deadline for responses is November 18, 2025, at 2:00 p.m., with invitations and instructions managed through the Building Connected system. Primary contact for this solicitation is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The contract covers 4.920 miles of milling, inlay, and plant mix resurfacing along State Route 8, stretching from north of the bridge over the Ronald Reagan Parkway to Lawrenceville Suwanee Road in Gwinnett County, Georgia, under Project No. M006920 and Call Order 020. The work is to be performed in accordance with the 2021 Standard Specifications and the 2024 Supplemental Specifications for Transportation Systems, incorporating detailed requirements for subgrade construction, hot mix asphaltic concrete, rumble strips, temporary barriers, traffic signal installation, traffic control devices, and pavement markings including thermoplastic, polyurea, and preformed plastic systems. The project also requires compliance with numerous referenced standards including the Manual on Uniform Traffic Control Devices, ASTM D4956-13 for retroreflectivity, AASHTO Roadside Design Guide, ADA guidelines for curb ramps and detectable warnings, Georgia Standards 4000W, 4960, 9102, 9106, 9107, and 9121, and materials must be delivered in 50 lb cardboard containers properly labeled with manufacturer details, batch numbers, and dates of manufacture. All hardware and straps must meet MIL-STD-810F for salt atmospheric resistance, and reinforcement steel must be handled and stored to prevent damage and weather exposure. The contract mandates adherence to strict quality controls and inspection protocols, including micropile placement within tight tolerances of location and elevation, proper reinforcement alignment and grout density, and full compliance with mixture control tolerances. Performance is due by July 31, 2027, with work to be conducted under the oversight of the Georgia Department of Transportation, requiring full compliance with bonding requirements including a Proposal Guaranty and a Contract Bond approved by the State Transportation Board to guarantee work completion, material and workmanship quality, and legal compliance. Bidders must demonstrate eligibility by submitting a Request for Eligibility to Bid prior to the deadline, confirm receipt of all amendments, and complete certification requirements including E-Verify registration under the Georgia Security and Immigration Compliance Act, DBE/Non-DBE status disclosure, and annual sexual harassment prevention training. Contractors must maintain a drug-free workplace, indemnify the Department against liability, carry adequate insurance, and submit detailed as-built plans, ITS project documentation, test reports, and training schedules. Payment terms require

General Info

Milling, inlay, and resurfacing 4.92 miles of State Route 8 in Gwinnett County, Georgia, under GDOT oversight.

Place of Performance

Gwinnett, GA, USA

Set-Aside

NONE

Documents

3

B3CBA2602590-0 Amendment No. 02

PDF, High priority: read this firstamendment
High

B3CBA2602590-0 Amendment No. 1

PDF, High priority: read this firstamendment
High

Georgia DOT Proposal B3CBA2602590-0 Call Order 020 Milling and Resurfacing

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → GADOT
ContactsNo contacts available
OfficeGA, USA
Organization / AgencyGeorgia → GADOT
Office AddressGA, USA
ContactsNo contact information available

Full Description

Show more
4.920 MILES OF MILLING, INLAY AND PLANT MIX RESURFACING ON SR 8 BEGINNING NORTH OF BRIDGE OVER RONALD REAGAN PKWY AND EXTENDING TO LAWRENCEVILLE SUWANEE RD.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS