Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Call 038 2026038

Active
2026038State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project is situated along Brewer Road in Sedona within Coconino County, Arizona, and involves the complete removal of existing concrete sidewalks and driveways, replacing them with new concrete sidewalks, driveways, and decomposed granite pedestrian paths. Additional scope includes the installation of drainage systems, ADA-compliant sidewalk ramps, retaining walls, metal handrails, scuppers, fencing, curb and gutter systems, signage, pavement markings, and necessary utility adjustments or relocations to support the improvements. All work is intended to enhance public access, safety, and infrastructure resilience in the area. The contract is identified as Call 038 2026038 under the Arizona Department of Transportation and was posted for bidding on October 23, 2026, with the same date designated as the response deadline. It falls under a state-level procurement, with the performance location confirmed in Arizona. The solicitation is managed by ADOT and is open to qualified contractors who must submit proposals by the stated deadline, though no specific set-aside provisions or NAICS code are indicated in the provided data.

General Info

Remove old concrete, install new sidewalks, driveways, granite paths, drainage, ADA ramps, walls, rails, and utilities along Brewer Road in Sedona.

Agency

Arizona → ADOTView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Coconino, AZ, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyArizona → ADOT
ContactsNo contacts available
OfficeAZ, US
Organization / Agency
Arizona → ADOT
View Agency Profile
Office AddressAZ, US
ContactsNo contact information available

Full Description

Show more
The proposed project is located in Coconino County along Brewer Road in the City of Sedona. The proposed work consists of removing existing concrete sidewalk and driveways and constructing new concrete sidewalk, driveways, and decomposed granite paths. The work also includes installing drainage improvements, sidewalk ramps, retaining walls, metal handrail, scuppers, fence, curb, curb and gutter, signs, pavement markings, utility adjustments and relocations, and other related work.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Fleet Fast EV Charging - ConstructionThe Port of Seattle’s Aviation Project Management Group is forecasting a construction contract for fleet fast electric vehicle (EV) charging infrastructure, targeting NAICS code 237310, which pertains to commercial and institutional building construction. The solicitation is scheduled to be released in July 2026, with no set-aside preferences indicated, and interested parties should prepare for a competitive procurement process. The project requires the installation and commissioning of high-speed EV charging systems specifically for fleet vehicles operating at Port facilities, with the work expected to occur at locations under the Port’s jurisdiction, though exact sites have not been specified yet. Primary point of contact for the opportunity is Angela Peterson, reachable via email or phone, with Katie Techa serving as the project manager for technical coordination. Although no formal solicitation number or detailed scope has been published, bidders should anticipate requirements related to electrical upgrades, site preparation, equipment procurement, compliance with safety and accessibility standards, and integration with the Port’s existing energy and fleet management systems. Prospective contractors are encouraged to monitor the official portal link for updates as the solicitation nears release, ensuring alignment with anticipated timelines and technical specifications.
Aviation Project Management Group

POSTED

about 17 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry Redevelopment Project will comprehensively upgrade the entry and exit drives along 19th Avenue West, the footprint of the existing Downie Building C-14, and surrounding parking areas. The project includes milling and overlaying deteriorated pavement, replacing and expanding stormwater infrastructure to divert runoff from the combined sewer system to dedicated storm lines, with water quality treatment integrated where qualifying pavement surfaces are replaced. The remaining slab of the C-14 building will be demolished and replaced with a mix of new parking spaces and green areas designed as pollinator habitats, potentially incorporating a stormwater treatment facility. A new irrigation system will support the landscaping, which extends to the median within the entry drive. Electric vehicle charging stations will be installed in the newly configured parking zone. Additional improvements include the installation of a protected two-way bike lane linking the terminal’s entrance to the existing West Wall bike path, enhanced pedestrian connections to the intersection of 21st Avenue West and W Emerson Place, and improved access to the King County Metro bus stop. Lighting will be upgraded throughout the new parking area and along the pedestrian and bicycle routes. Wayfinding signage will be added to guide foot and bicycle traffic. All work is scoped under NAICS code 237310 and managed by the Port of Seattle’s Waterfront Project Management team, with Mike Van Cleve and Terrence Moody serving as primary point of contact and project manager respectively.
Waterfront Project Management

POSTED

about 17 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Asphalt Paving & Striping Portwide Unit Price 2026The contract encompasses a broad range of pavement and infrastructure maintenance activities to be conducted across multiple locations within the Seattle-Tacoma International Airport, Maritime Properties, and adjacent areas. Work includes new asphalt paving and patching, asphalt overlays with fabric, crack sealing, seal coating, profile grinding, disposal of grinding spoils, removal of existing striping, surface preparation for new markings, various stripe painting, saw cutting and coring of non-hazardous concrete and asphalt, installation of concrete wheel stops, curb repair and replacement, lifting and leveling of concrete sidewalks, and upgrades to road water drainage systems, which may require permitting. All tasks are to be performed under a unit price structure for fiscal year 2026, ensuring flexibility in scope based on actual site needs. The contract is managed by the Port of Seattle through its Port Construction Services division, with primary point of contact Heather Bowden and Project Manager Lesley Miles available for coordination. Work will occur across various Port-wide sites, requiring logistical planning and coordination with airport and maritime operations. The NAICS code 237310 confirms the focus on highway, street, and bridge construction services. No solicitation number has been assigned yet, and the contract is currently listed as a forecast, indicating it is a planning notice for future procurement rather than an active bid opportunity. All activities must comply with safety, environmental, and operational standards applicable to airport and maritime facilities.
Port Construction Services

POSTED

about 17 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
VARIOUS PAVING FY26The City of Ringgold is soliciting bids for various paving projects under solicitation number PE-62351-NONST-2026-000000026, with bids due by September 7, 2026. All bidders must be pre-qualified with the Georgia Department of Transportation and subcontractors must also be registered with GDOT. Proposals must be submitted in sealed, opaque envelopes clearly labeled with the company name and the words “Paving Bid,” and any deviation from this labeling will result in the bid being returned unopened. Bids must be typed or written in ink and delivered either by mail to P.O. Box 579, Ringgold, GA 30736, or in person to City Hall at 150 Tennessee St., Ringgold, GA. The award will not necessarily go to the lowest bidder; instead, the City will select the best responsible bidder based on quality of materials, conformity with specifications, suitability to requirements, bidder experience, and delivery terms. Contractors are required to provide all labor, equipment, and materials for the project, including full traffic control, and must submit performance and payment bonds upon contract execution. All contractors must maintain adequate workers’ compensation and general liability insurance and comply with the City’s drug-free workplace policy. The place of performance is within the State of Georgia, though specific job locations are not detailed. No FAR clauses or federal accounting identifiers are referenced, and the procurement operates under local municipal procedures only. No electronic submissions are accepted, and no contract value or detailed performance schedule is provided in the solicitation materials.
City of Ringgold

POSTED

about 17 hours ago

DEADLINE

in about 2 months
View Details