This Solicitation opportunity from New Jersey was posted on January 1, 1970. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for 193650 UAP Cablevision Utility Work Specifications: Technical specifications and general notes for Cablevision utility relocation work on Route 4 (Eastbound and Westbound) between MP 5.73 and 6.23. The document details allowable lane closure hours, holiday restrictions, traffic control coordination, and specific requirements for the state's contractor and the utility provider.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 193650 UAP Verizon - Route 4 Lane Closure and Utility Notes: Technical specifications and general notes for utility relocation work by Verizon New Jersey, Inc. on Route 4 (Eastbound and Westbound, MP 5.73 - 6.23). The document details coordination requirements between the state's contractor and the utility, pole placement standards, and comprehensive allowable lane closure hours based on seasonal and holiday schedules.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of Hackensack Sewer - Existing Facilities: A technical document detailing existing facilities for the City of Hackensack Sewer project, specifically noting 8-inch sanitary sewer mains, 4-inch sanitary laterals, sewer manholes, and cleanouts.
PDF
PDF, High priority: read this first4 pages · specifications
HighAI Summary for Contract 006023460 - PSE&G Electric Utility Agreement Plan: Utility Agreement Plan dated November 2024 for the rearrangement of PSE&G electric facilities on Route 4 Hackensack River Bridge (MP 5.69 to MP 6.22) in Bergen County, NJ. The document outlines technical specifications for pole and conduit installation, contractor responsibilities for shoring and obstructions, outage notice requirements, and detailed allowable lane closure hours for construction traffic control.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract 006023460 - Route 4 Hackensack River Bridge Addenda: This document contains Addenda 1, 2, and 3 for Contract No. 006023460 (Route 4 Hackensack River Bridge). Key changes include a revised bid date of November 06, 2025, the removal of ESBE subcontracting goals, updated inquiry deadlines, and detailed technical specifications for geotextile installation and embankment requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract 006023460 - Route 4 Hackensack River Bridge Boring Logs: Technical boring logs for the Route 4 Hackensack River Bridge project (Contract ID #006023460) in Bergen County, NJ. Prepared by Michael Baker International for the NJDOT, the document provides detailed subsurface soil descriptions, stratigraphy, and blow counts for boring MB-01, dated March to April 2020.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract 006023460 - Route 4 Hackensack River Bridge Special Provisions: Special Provisions for Contract No. 006023460 regarding grading, paving, and structures for the Route 4 Hackensack River Bridge project in Bergen County. The document outlines the use of 2019 NJDOT Standard Specifications, prevailing wage requirements under Davis-Bacon, funding authorizations for FY 25, and specific bidding qualifications.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Contract 006023460 - Route 4 Hackensack River Bridge Utility Agreement Plan: Utility Agreement Plan for the New Jersey Department of Transportation, Contract No. 006023460. The document details the rearrangement of fiber cable facilities for Century Link Communications, LLC, located on Route 4 Hackensack River Bridge (MP 5.69 to MP 6.22) in Bergen County. Dated November 2024.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Contract 006023460 - Route 4 Hackensack River Bridge Utility Agreement Plan: Utility Agreement Plan for the Route 4 Hackensack River Bridge project (Contract No. 006023460) in Bergen County, NJ. The document provides technical details and requirements regarding an existing 96-inch sewer pipe, including vibration monitoring, stability analysis, and coordination between the State's contractor and the Bergen County Utilities Authority (BCUA) during bridge abutment construction.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Contract 006023460 - Route 4 Hackensack River Bridge Utility Agreement Plan: Utility Agreement Plan (UECA-14-RT-4-Hackensack River Bridge) for the New Jersey Department of Transportation, dated December 2024. The document specifies the rearrangement of fiber cable facilities for Millennium Communication Group, Inc. on Route 4 between MP 5.69 and MP 6.22 in Bergen County.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Contract No. 006023460 - Route 4 Hackensack River Bridge: Notice to Contractors from the New Jersey Department of Transportation for Contract No. 006023460 (DP No: 25128). The project involves grading, paving, and structures for the Route 4 Hackensack River Bridge in Bergen County. Bid proposals are due by 10:00:59 A.M. on 11/06/2025. The document includes detailed quantity lists for roadway and structure work, as well as requirements for SAM registration, prevailing wage compliance, and certifications regarding prohibited activities in Russia or Belarus.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract No. 006023460 - Route 4 Hackensack River Bridge Addenda: This document contains Addenda Nos. 1, 2, and 3 for Contract No. 006023460 (Route 4 Hackensack River Bridge). Key changes include updating the bid date to November 06, 2025, removing the ESBE subcontracting goal, and adding detailed technical specifications for geotextile installation and subgrade stabilization under Section 203 (Embankment). It also modifies the deadline for inquiries and clarifies that bidders should not assume as-built drawings are fully accurate.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract No. 006023460 - Route 4 Hackensack River Bridge Addenda: This document contains Addenda 1, 2, and 3 for Contract No. 006023460 (DP # 25128) regarding Grading, Paving and Structures for the Route 4 Hackensack River Bridge. Key changes include a revised bid date of November 06, 2025, the removal of ESBE subcontracting goals, updated inquiry deadlines, and detailed technical specifications for geotextile installation and subgrade stabilization.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract No. 006023460 - Route 4 Hackensack River Bridge Addenda: This document contains Addenda 1, 2, and 3 for Contract No. 006023460 (Route 4 Hackensack River Bridge). Key changes include updating the bid receipt date to November 06, 2025, removing the ESBE subcontracting goal, and adding detailed technical specifications for embankment and geotextile installation (Section 203) and bidding requirements (Section 102).
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract No. 006023460 - Route 4 Hackensack River Bridge Addenda: This document contains Addenda Nos. 1, 2, and 3 for Contract No. 006023460 (Route 4 Hackensack River Bridge). Key changes include updating the bid receipt date to November 06, 2025, removing the ESBE subcontracting goal, updating inquiry deadlines, and adding detailed technical specifications for geotextile installation and embankment requirements (Section 203).
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract No. 006023460 - Route 4 Hackensack River Bridge Addenda: This document contains Addenda 1, 2, and 3 for Contract No. 006023460 (Route 4 Hackensack River Bridge). Key changes include a revised bid date of November 06, 2025, the removal of ESBE subcontracting goals, updated inquiry deadlines, and detailed technical specifications for geotextile installation and subgrade stabilization under Section 203.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract No. 006023460 - Route 4 Hackensack River Bridge Addenda 1-3: This document contains Addenda 1, 2, and 3 for Contract No. 006023460 (Route 4 Hackensack River Bridge). Key changes include a revised bid date of November 06, 2025, the removal of ESBE subcontracting goals, updated inquiry deadlines, and new technical specifications regarding geotextile installation and subgrade stabilization (Section 203).
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract No. 006023460 - Route 4 Hackensack River Bridge Addenda 1-3: This document contains Addenda 1, 2, and a partial section of Addendum 3 for Contract No. 006023460 (Route 4 Hackensack River Bridge). Key changes include a bid date extension to November 06, 2025, the removal of ESBE subcontracting goals, updated inquiry deadlines, and new technical specifications for geotextile installation and embankment materials (Section 203).
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract No. 006023460 - Route 4 Hackensack River Bridge Addenda 1-3: This document contains Addenda 1, 2, and 3 for Contract No. 006023460 (Route 4 Hackensack River Bridge). Key changes include updating the bid receipt date to November 06, 2025, removing the ESBE subcontracting goal, updating inquiry deadlines, and adding detailed technical specifications for geotextile installation and embankment requirements (Section 203).
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract No. 006023460 - Route 4 Hackensack River Bridge Addenda 1-3: This document contains Addenda 1, 2, and 3 for Contract No. 006023460 (Route 4 Hackensack River Bridge). Key changes include updating the bid receipt date to November 06, 2025, removing the ESBE subcontracting goal, and adding detailed technical specifications for geotextile installation and embankment requirements under Section 203.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Crown Castle Fiber Utility Relocation - Route 4 Lane Closure and General Notes: Technical specifications and general notes for utility relocation work by Crown Castle Fiber, LLC on Route 4 (Eastbound and Westbound MP 5.73 - 6.23). The document details coordination requirements between the state's contractor and the utility, material responsibilities, and comprehensive allowable lane closure hours based on seasonal and holiday schedules.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for DP # 25128 - Route 4 Hackensack River Bridge Addenda: This document contains Addenda 1, 2, and 3 for Contract No. 006023460 (Route 4 Hackensack River Bridge). Key changes include updating the bid date to November 06, 2025, removing the ESBE subcontracting goal, and adding detailed technical specifications for geotextile installation and subgrade stabilization under Section 203.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for DP # 25128 - Route 4 Hackensack River Bridge Addenda 1-3: This document contains Addenda 1, 2, and 3 for Contract No. 006023460 (Route 4 Hackensack River Bridge). Key changes include updating the bid receipt date to November 06, 2025, removing the ESBE subcontracting goal, and adding detailed technical specifications for geotextile installation and subgrade stabilization under Section 203.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for NJDOT Utility Owner Design Authorization - Boldyn Networks (UECA-12-Rt 4): A New Jersey Department of Transportation (NJDOT) Utility Owner Design Authorization checklist for Boldyn Networks Fiber US, LLC regarding the Route 4 Hackensack River Bridge project. The document details specific work items for the installation and relocation of fiber cable facilities (overhead and underground) across Pre-Stage 1 and Stage 1 construction, including specific station locations and coordination between the utility owner and the State's contractor. Signed and dated April 9, 2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for NJDOT Utility Owner Design Authorization - Crown Castle Fiber (UECA-7-Rt 4): A Utility Owner Design Authorization checklist from the New Jersey Department of Transportation (NJDOT) for Crown Castle Fiber, LLC regarding the Route 4 Hackensack River Bridge project. The document details specific work to be performed by both the utility owner and the state's contractor, including the installation and removal of overhead and underground fiber cable facilities, manholes, and PVC ducts. It includes technical stationing, agreement number UECA-7-Rt 4-Hackensack-023460, and design certifications dated April 2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Route 4 Allowable Lane Closure Hours - Teleport Communications America, LLC (AT&T): This document outlines the specific allowable lane closure hours and traffic maintenance requirements for Route 4 Eastbound and Westbound (MP 5.73 - 6.23). It details restrictions for the holiday shopping season versus other times of the year, specifies prohibited closure dates for major holidays, and mandates coordination with NJ Transit, private bus carriers, and Farleigh Dickinson University. It also defines minimum lane widths and requirements for emergency access and utility work.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Route 4 Hackensack River Bridge - City of Hackensack Sewer Design Authorization: A Utility Owner Design Authorization checklist for the Route 4 Hackensack River Bridge project (Agreement No: UECA-11-Rt 4-Hackensack - 023460). The document specifies the installation of 550 feet of 8 inch PVC S-40 sewer main, manholes, and service laterals, as well as the abandonment of existing lines. It outlines technical requirements, inspection mandates by the City of Hackensack Sewer Department, and a 4-week mobilization notice requirement. Final design acceptance was signed between February and April 2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Route 4 Hackensack River Bridge - PSE&G Utility Design Authorization: A Utility Owner Design Authorization checklist from the New Jersey Department of Transportation (NJDOT) for Public Service Electric & Gas (PSE&G). The document details the relocation and installation of overhead electric facilities, including pole placements and service connections for the Route 4 Hackensack River Bridge project (Agreement No. UECA-2-Rt 4-Hackensack-023460). It includes technical stationing data, design certifications, and final design acceptance signatures dated April 2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Route 4 Hackensack River Bridge - Utility Owner Design Authorization: Utility Owner Design Authorization checklists for the Route 4 Hackensack River Bridge project (MP 5.69 to 6.17) in Bergen County. The documents detail requirements for the Bergen County Utilities Authority and City of Hackensack sewer systems, specifically regarding the stability and vibration monitoring of a 96-inch sewer pipe during bridge construction. Includes signatures and approvals dated May 2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for UECA-12-Rt 4 - CenturyLink Design Authorization: Utility Owner Design Authorization checklist for CenturyLink Communications, LLC regarding the Route 4 Hackensack River Bridge project (Agreement No. UECA-12-Rt 4 – Hackensack - 023460). The document details specific work to be performed by both the utility owner and the State's contractor, including the installation and removal of fiber cable facilities, manholes, and PVC ducts across various construction stages. It includes certifications and final design acceptance signatures dated March and April 2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for UECA-13-Rt 4-Hackensack-023460 Utility Owner Design Authorization: NJ Department of Transportation Utility Owner Design Authorization checklist for Teleport Communications America, LLC regarding the Route 4 Hackensack River Bridge project (MP 5.69 to 6.17). The document details specific work to be performed by the utility and the state's contractor, including the installation and removal of overhead and underground fiber cable facilities, manholes, and PVC ducts across various construction stages. Signed by project management and design firms as of April 2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for UECA-14 - Rt 4 Hackensack River Bridge Utility Design Authorization: NJDOT Utility Owner Design Authorization checklist for the Route 4 Hackensack River Bridge project (MP 5.69 to 6.22). The document details the relocation and installation of fiber optic facilities by Bergen County, NJ and Millennium Communications Group, Inc., including specific stationing, temporary and permanent installations, and removal of abandoned facilities. It includes design certifications and approvals dated March and April 2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for UECA-1-Rt 4-Hackensack-023460: Verizon NJ Design Authorization: A Utility Owner Design Authorization checklist for the Route 4 Hackensack River Bridge project (MP 5.69 to MP 6.17) in Bergen County. The document details the removal and installation of aerial and underground telephone facilities by Verizon New Jersey, Inc., including pole installations by PSE&G. It includes specific stationing for facilities, notice requirements (8 weeks), and final design acceptance signatures from the designer (Michael Baker International), Utility Owner, and NJDOT Project Manager dated between January and April 2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for UECA-4-Rt 4-Hackensack-023460 Utility Owner Design Authorization: A New Jersey Department of Transportation (NJDOT) Utility Owner Design Authorization checklist for Cablevision regarding the Route 4 Hackensack River Bridge project. Dated July 10, 2025, the document details the in-kind replacement and relocation of aerial Cable TV facilities, including specific station locations, installation of 800 feet of overhead facilities, and general notes for coordination between the State's Contractor and the utility owner.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for UECA-6-Rt 4 Hackensack - Veolia Water Design Authorization: NJDOT Utility Owner Design Authorization checklist for Veolia Water New Jersey, Inc. regarding the Route 4 Hackensack River Bridge project (Agreement No. UECA-6-023460). The document details technical specifications for the relocation of 8-inch water mains, including installation of ductile iron pipe, valve assemblies, hydrant relocation, and specific pressure testing and chlorination procedures. It includes design certifications signed in June and July 2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Veolia Water New Jersey - Utility Relocation Specifications: Technical specifications and general notes for the relocation of water mains owned by Veolia Water New Jersey, Inc. on Route 4 Eastbound. The document details contractor responsibilities for traffic control, coordination with utility owners, installation standards, and strict allowable lane closure hours and holiday restrictions.
PDF
PDF, Low priorityother
LowAI Summary for 193650_UAP_Boldyn Networks: Unreadable document.
Route 4 Hackensack River Bridge Contract No. 006023460;
Grading, Paving and Structures City Of Hackensack and The
Township of Teaneck Bergen County; Federal Project Number:
0004336 Non-PODI (Delegated)
More opportunities from New Jersey Department of Transportation
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.