This Solicitation opportunity from New Jersey was posted on January 1, 1970. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Contract 001153750 - RT 30 Resurfacing Special Provisions: Special Provisions for Contract No. 001153750 regarding the resurfacing of Route 30 from Cooper Street to Grove Street across multiple municipalities in Camden County, NJ (Federal Project No. NHP-0030(373)). The document outlines the 2019 NJDOT Standard Specifications, wage requirements (Davis-Bacon and State), funding authorizations for the 2025 Capital Program, and specific project attachments including DBE and EEO requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract 16: Route 30 Traffic Signal PS&E As-built Plans: As-built bridge and traffic signal plans for New Jersey Department of Transportation Contract No. 16. The document includes an index of bridge sheets (B1-B45) covering estimates of quantities, key plans of structures, general plans, elevations, foundation details, and electrical specifications for VMS and camera standards.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Contract No. 001153750 - Route 30 Resurfacing: Notice to Contractors from the New Jersey Department of Transportation for Contract No. 001153750. The project involves resurfacing Route 30 from Cooper Street to Grove Street in Camden County. Bids are due by 10:00:59 A.M. on 10/23/2025. The document outlines principal items of work including stone matrix asphalt, concrete sidewalks, vertical curbs, and ITS conduit, along with various state compliance requirements regarding labor laws, SAM registration, and the Diane B. Allen Equal Pay Act.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract No. 0011537570 - RT. 30 Resurfacing (DP# 25136): This document contains Addendum No. 1 and No. 2, along with a revised Notice to Contractors for the Route 30 resurfacing project (Contract No. 0011537570). Key changes include the removal of the DBE subcontracting goal and clarification that the bid date is 10/23/2025. It also outlines principal items of work, such as Stone Matrix Asphalt and concrete sidewalks, and specifies compliance requirements for the NJ Department of Labor and SAM registration.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for DP# 25136 - RT. 30 Resurfacing Addenda 1 & 2: This document contains Addendum No. 1 and No. 2 for Contract No. 0011537570 (DP# 25136), regarding resurfacing on Route 30 in Camden County. Key changes include the removal of the DBE subcontracting goal and the clarification of the bid date as 10/23/2025. It also includes a revised Notice to Contractors detailing project scope, including stone matrix asphalt, concrete sidewalk, and curb installation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project Route 30 & 130 Section 1H As-Built Plans: As-built itemization and quantity table for Project Route 30 & 130 Section 1H. The document contains a detailed list of pay items, contract quantities, and final as-built quantities for construction activities including milling, excavation, and paving.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for PS&E As-built Plans Route 30 & Route 130 Section 1k (1992): As-built plans and technical specifications for Route 30 and Route 130 Section 1k, dated 1992. The document includes engineering drawings and traffic control signage specifications for 4 and 6 lane divided highways.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for PS&E As-Built Plans Route 30 Section 13b (1967): As-built plans and specifications for Route 30 Section 13b, dated 1967. This document contains technical engineering drawings and site specifications used for procurement and infrastructure maintenance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for PS&E As-built Plans Route 30 Sections 1a & 2b: As-built plans and technical specifications for Route 30, Sections 1a and 2b. This document contains critical engineering and construction data used for procurement and project verification.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for PS&E As-built Plans Route 3 Section 8 (1922): This document consists of as-built plans and specifications for Route 3 Section 8, dated 1922. It provides the final technical record of the construction as completed.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Route 25 Sections 2E & 3E - PS&E As-built Plans: Construction details and technical specifications for the New Jersey State Highway Department regarding Route 25 (Entrance Road, Sections 2E & 3E) and Route 45 (Section 23). The document includes detailed specifications for bridge approaches at Baird Boulevard, reflecting white concrete vertical curbs, reinforcement requirements, and specific technical standards for dowels and tubing.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Route 30 Sec 3 - Plan & Profile of Delaware River Bridge Approaches: Technical engineering plans and profiles for the New Jersey State Highway Department, specifically covering the Delaware River Bridge Approaches Connecting Road - South - Section 3, from Station 35 to Station 44.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Route 30 Section 1f & Route 130 Section 7 J As-built Plans (1975): As-built plans and specifications from May 1975 for the New Jersey Department of Transportation regarding resurfacing projects on Route U.S. 130 (Section 7 J) and Route U.S. 30 & 130 (Section 1 F) in Camden County. The document includes a key map, traffic data, an index of sheets (estimates, construction plans, and electrical details), and references the Standard Highway Specifications of 1961.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Route U.S. 30 & 130 Section 1C As-built Plans: As-built plans and estimate of quantities for the widening and jughandle project on Route U.S. 30 & 130, Section 1C, in Pennsauken, NJ. Dated December 29, 1969, the document includes an index of sheets (plan/profile, electrical, grading), design traffic data, and a detailed itemized list of contract quantities for roadway excavation, paving, and drainage.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Route U.S. 30 Section 14B As-Built Plans (1965): As-built plans for Route U.S. 30 Section 14B, Ramp Connection at Baird Boulevard in Camden, New Jersey, dated November 1965. The document includes public utility information, traffic design data, and project length (0.186 miles), noting that the Standard Highway Specifications of 1961 govern the project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Route U.S. 30 Section 14E - As-Built Plans (1975): As-built construction plans and specifications from March 1975 for the New Jersey Department of Transportation regarding ramp construction at Baird Boulevard on Route U.S. 30 (Section 14E). The document includes an index of sheets covering quantities, profiles, electrical plans, and construction details, as well as specific material requirements for sign faces, supports, and fastening.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Route U.S. 30 Section 14K - PS&E As-built Plans: As-built plans and technical specifications for the Route U.S. 30 Median Replacement (Section 14K), including traffic control and staging plans, detour signage, and detailed material specifications for junction boxes and covers (ASTM standards).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RT 25 Entrance Road Secs 2D & 3D As-Built Plans: As-built plans and construction details for the New Jersey State Highway Department project on Route 25 Entrance Road (Sections 2D & 3D), spanning from Cooper River to Kaighn Avenue Traffic Circle. The document includes layout maps, typical cross sections, and detailed technical specifications for dowels, joint filler supporting brackets, and reflecting panels, governed by the Standard Highway Specifications of 1941.
PDF
PDF, Low priority1 page · other
LowAI Summary for NoBoringLogs Project Statement: This document titled 'NoBoringLogs' states that there are no boring logs for the project. It contains no additional technical or procurement information.
PDF
PDF, Low priorityspecifications
LowAI Summary for PS&E As-built Plans Route 25 Section 1F (1947): As-built plans and specifications for Route 25 Section 1F, dated 1947. The document provides technical engineering drawings and records of the completed construction for this specific road section.
PDF
PDF, Low priorityspecifications
LowAI Summary for PS&E As-built Plans Route 30 Section 13a (1962): As-built plans and specifications for Route 30 Section 13a, dated 1962. The document contains technical engineering drawings and project records for a completed infrastructure project.
PDF
PDF, Low priorityspecifications
LowAI Summary for Route 25 Sec 1b 2b & 3b As-built Plans (1928): Historical as-built plans and estimate of quantities from August 1928 for the New Jersey State Highway Dept, covering Delaware River Bridge Approaches Entrance Road (Sections 1B, 2B, 3B) and Connecting Roads North and South (Section 3B).
Rt. 30, Cooper Street to Grove St. Contract No. 001153750;
Resurfacing Pennsauken Township, Haddon Township;
Collingswood Borough, Oaklyn Borough, Audobon Borough,
Haddon Heights Borough; City of Camden, Camden County
More opportunities from New Jersey Department of Transportation
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.