This Solicitation opportunity from Department Of Defense was posted on July 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Call for Solutions for Advanced Manufacturing Metal Printer Capability
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The U.S. Army Aviation and Missile Command, through the Army Contracting Command – Redstone Arsenal, is seeking innovative solutions for the integration of an Advanced Manufacturing Laser Powder Bed Fusion metal printer at the Corpus Christi Army Depot in Texas to address supply chain challenges and enhance readiness by rapidly fabricating OEM-quality parts, tools, jigs, fixtures, and ground support equipment. This effort is issued under the Army Open Solicitation W9128Z-25-S-A002 via a Commercial Solutions Opening (CSO) procedure under DFARS subpart 212.70 and is governed by FAR Part 12 as a Firm-Fixed-Price contract, though awards may also be made using non-FAR mechanisms such as Other Transactions. The required system must feature a 245 x 245 x 325 mm build envelope, a 400W to 1kW dual-laser system with full overlap, and the capability to print Ti6Al4v ELI Grade 23 titanium alloy. The full solution includes ancillary equipment such as wet separators, sieve stations, build plates, re-coater blades, transformers, UPS systems, and electrical lifting trolleys, along with comprehensive professional services: shipping, onsite installation, Site Acceptance Testing, operator training for up to four personnel, and a total four-year warranty (one standard year plus a required three-year extension). On-demand technical support must be available Monday through Friday with a first-line on-site response no later than 48 hours. Proposals must be submitted in three phases: a five-page Solution Brief due by July 14, 2026, followed by optional Pitch and detailed Solution Proposal phases for selected respondents. Evaluation is based on Technical Merit and Relevance, Innovation and Uniqueness, Company Viability, and Price and Affordability, with non-cost factors being significantly more important than price. Offerors must be registered in SAM.gov with a valid UEI and CAGE code, be determined responsible, and not be suspended or debarred. A detailed Organizational Conflict of Interest analysis must be submitted and incorporated into any resulting contract alongside an OCI Mitigation Plan if conflicts are identified. Compliance with FAR clause 52.204-9 for personal identity verification is mandatory, and all personnel must complete AT Level I Awareness and iWATCH Army training within specified timeframes. Contractors must coordinate facility modifications via a detailed installation plan and bill of materials due
General Info
Agency
NAICS
Place of Performance
Corpus Christi, TX, 78419, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
*****Updates*****
-The Solution Briefs Due Date has been extended to July 14, 2026 at 12:00pm CDT.
-The deadline to submit any questions for Phase 1 is July 10, 2026 at 12:00pm CDT.
-The information within the Solutions Brief remains the same. The only information that has been updated is the Solutions Brief date and the deadline to submit questions.
*************************************
This Call for Solution is issued under the Army Open Solicitation W9128Z-25-S-A002.
The Army Contracting Command – Redstone Arsenal, on behalf of the office of the U.S. Army Aviation and Missile Command (AMCOM), is seeking innovative solutions for Advanced Manufacturing Metal Printer Capability.
The U.S. Army Aviation and Missile Command (AMCOM) have a need for accelerated modernization of weapon systems through Advanced Manufacturing (AdvM) technologies that directly address supply chain challenges to underpin readiness. In Accordance With (IAW) Army Regulation (AR) 750-1 (Army Materiel Maintenance Policy), Commanders, U.S. Army Organic Industrial Base (OIB) activities will develop additive and advanced capabilities consistent with Army Materiel Command (AMC) guidance to produce Original Equipment Manufacturer (OEM) quality parts for use to meet obsolescence and other readiness requirements as required.
The U.S. Army Aviation and Missile Command (AMCOM) require immediate integration of AdvM metal printing capability at Corpus Christi Army Depot (CCAD) to support aviation maintenance operations. The integration of AdvM technology will enable CCAD to rapidly fabricate qualified parts, tools, jigs, fixtures, and ground support equipment.
The Call for Solutions document outlining the full problem statement, required solution attributes, submission requirements, and evaluation phases can be found in the "Attachments" section below.
The deadline to submit questions for Phase 1 is Wednesday June 24th, 2026, at 12:00 PM Central Daylight Time (CDT).
The following shall be utilized in the email subject line: "Call for Solution – Advanced Manufacturing Metal Printing Capability / W9128Z-25-S-A002 (Question regarding section #)"
The Army Open Solicitation (AOS) that this Call for Solution is associated with can be found at: https://sam.gov/workspace/contract/opp/09ab570a35484c6cb5c6eba05cad19b3/view
More opportunities from Department Of Defense → W6QK Acc-Rsa
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
