Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on January 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Callaway Stadium Artificial Turf Replacement project

Closed
PE-77030-NONST-2025-000000011State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Callaway Stadium Artificial Turf Replacement Project involves the complete removal and installation of a new artificial turf system at Callaway Stadium located in LaGrange, Georgia. The scope includes providing all necessary materials, labor, equipment, and coordination with Troup County staff to ensure a fully functional and compliant installation. The project requires adherence to specific technical standards, including the installation of a 25mm EPP shock pad with a 25-year drainage warranty, and ensuring the field maintains a GMAX below 120 and HIC below 1000 for at least ten years or the duration of the warranty. The new turf must feature a 60 oz blended fiber with monofilament and slit-film, a thatch layer, and alternating green color panels suitable for multiple sports such as football, soccer, and lacrosse, without logos but with lined markings. The contract emphasizes comprehensive warranties, including a 10-year non-prorated warranty covering all labor, installation, and workmanship, along with a 10-year maintenance program. All debris from construction must be properly disposed of in accordance with regulations, and surrounding areas must be protected from damage during the project. The project is set to be awarded through a competitive bid process, with responses due by February 25, 2025, and the contract size estimated between $500,000 and $1,500,000. The primary contact for the project is Ramona Gillham from the Troup County Board of Commissioners, and further details can be accessed through the provided online link.

General Info

Documents

3
PDF, High priority: read this firstitb
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this first1 page · sow
High

Read all 3 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 15 days
  • PURIFIED WATER REPLENISHMENT SAN JACINTO VALLEY ADVANCED WATER PURIFICATION FACILITY SPECIFICATION NO. 1472WOpen now, due in 2 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 77030 TROUP PE-77030-NONST-2025-000000011 to PE-77030-NONST-2025-000000011.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Troup County Board of Commissioners
Contacts1 person available
OfficeN/A

Full Description

Show more
Callaway Stadium ¿ Artificial Turf Replacement Project Artificial Turf Replacement Project - RFP (1/15/2025) 801 Dallis Street, LaGrange, Ga 30240 Quote/Bid #1 ¿ Replace the Artificial Turf System at Callaway Stadium (Scope of Work): ¿ Per the Site Plan Provided (see attached Site Plan). ¿ Provide and install all required/necessary materials, supplies, labor, equipment, machinery, etc. for a complete artificial turf replacement project, per the scope of work. ¿ All work shall be coordinated with Troup County Staff. ¿ Provide a copy of all manufacturer¿s product warranties and the contractor¿s written warranty covering all labor, installation, and workmanship. ¿ Clean-up & dispose of all construction debris and/or trash, per Local/State/Federal regulations. ¿ Protect surrounding areas from damage & debris. ¿ Removal and disposal of the existing artificial turf system and associated materials. ¿ Installation of the new artificial turf system with the following minimum specifications: o Meets 1 Turf Concept Standard, o Installation of 25mm EPP shock pad with vertical and lateral drainage ¿ 25 yr. warranty, o Field has to have a GMAX below 120 for 10 years or life of warranty whichever is longer, o HIC (head injury criteria) needs to be below 1000 for the life of the field, o 60 oz blended fiber with monofilament and slit-film with a thatch layer, o 2 inches in length for all fibers, o Alternating contrasts in color panels (Green), o No logos but lined for football/ soccer/ lacrosse, o Rubber filling, o Provide a 10 year maintenance program, o Provide a 10 year non-prorated warranty.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS