Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

CalRecycle Rotelli Burn Dump Remediation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California Resources Recycling and Recovery, Department of (CalRecycle)

NAICS

562910 - Remediation ServicesView NAICS

Place of Performance

Sonora, CA, 95370

Set-Aside

NONE

Documents

(7)

CalRecycle Rotelli Burn Dump Remediation Project Summary Form

PDFenvironmental-summary

2025090436 RWQCB Comment on CalRecycle Rotelli Burn Dump Remediation Project

PDFcomment

Draft Rotelli NOI to Adopt ISMND

PDFnotice-of-intent

CalRecycle Rotelli Burn Dump Remediation Project Initial Study/Mitigated Negative Declaration

PDFinitial-study-mitigated-negative-declaration

Caltrans Comments on Rotelli Burn Dump Remediation Project Initial Study

PDFcomment-letter

DTSC Comment on CalRecycle Rotelli Burn Dump Remediation Project MND

PDFcomment

CalRecycle Rotelli Burn Dump Remediation Project Notice of Completion

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Resources Recycling and Recovery, Department of (CalRecycle)
Contacts1 person available
OfficeN/A
Organization / Agency
California Resources Recycling and Recovery, Department of (CalRecycle)
Office AddressN/A
Contacts
Steve Santa CroceSenior Waste Management Engineer

Full Description

Show more
The proposed Project is located near Mill Villa Court adjacent to State Route 49 (SR-49), southwest of the City of Sonora (City) in unincorporated Tuolumne County. The Project Area is defined as the areas that would be disturbed by remediation activities or used for access. The Project Area is located predominately within 2 parcels owned by different entities, Assessor’s Parcel Numbers (APNs) 056-020-004 (Rotelli), and 056-020-027 (Smith), with a small part of the drainage crossing through the lower corner of APN 059-010-034 (Bureau of Land Management). Remediation access would further cross portions of APN 056-020-029 (Hattler) and Caltrans right-of-way on the west side of SR-49. The Project would remove surficial waste (if found to be present at the time of remediation) and excavate waste materials from 2 burn dump areas, consolidate the waste, and cap it with clean fill from an adjacent area. The Project Area is composed of 5 distinct areas: 1) Rotelli Primary Burn Dump Area (Primary Area), 2) Secondary Burn Dump Area (Secondary Area), 3) Borrow Area, 4) Consolidation Area, and 5) Construction Staging Area, as well as access roads and stream areas receiving improvement. At the start of remediation activities, the Primary Area, Secondary Area, Consolidation Area, and Borrow Area would be cleared and grubbed, and all trees would be removed. Transport of waste and clean soil within the Project Area would occur along the existing access roads between the Staging Area, Borrow Area, the 2 burn dump areas, and the Consolidation Area. The grading of the final soil cover would consist of an approximately 60-foot-wide by 200-foot-long flat area that slopes to the east at approximately 4 percent. The side slopes of the final cover would be between 3:1 and 3.5:1 horizontal to vertical (H:V). After placement and compaction of excavated burn waste and cover soil is completed, the final cover soil would be graded to achieve slope gradients of 3:1 H:V or less to promote positive drainage patterns and reduce erosion potential. Following the placement of the final cover, the existing road near the southeastern corner of the Consolidation Area would be extended and re-established on the final cover through the Consolidation Area. The portion of access road within the Consolidation Area would have a width of 16 feet and be resurfaced with an aggregate base. A ditch would be installed along the newly constructed access road that would direct stormwater runoff to the existing culvert (southern culvert) directly east of the Construction Staging Area that passes under the access road towards SR-49. Stormwater improvements would include improvements to 2 existing ephemeral drainages that run through the existing waste limits. Within the Primary Area, after the waste is removed from the northernmost ephemeral drainage, the existing drainage would be reconstructed as a trapezoidal stream channel lined with rock-slope protection. At the downstream end of the north ephemeral drainage the entrance to the culvert (north culvert) would be reinforced with additional rock. This culvert also drains under SR-49. Erosion control measures such as fiber rolls and hydroseeding would be put in place. Within the Consolidation Area, a stabilized topsoil cover is proposed to help reduce the potential for erosive forces that could expose waste. Within the Secondary Area, after the waste is removed from the ephemeral drainage, the drainage would be reestablished to its connection with the culvert draining to and under SR-49 (south culvert). The drainage would be covered with a temporary erosion control mat and hydroseeded with a native seed mix, unless otherwise directed by regulatory agencies during permitting. The existing drop inlet and culvert would be cleaned which also receives stormwater from the new roadside ditch extended from the Consolidation Area.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
902/903 Dorm Mold Remediation & Removal
Solicitation # 902/903 Dorm Mold Remediation and Removal
The contract involves mold remediation and removal in two dormitory buildings—0902 and 0903—at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope requires comprehensive remediation of visible mold and moisture intrusion in toilet rooms across all four wings of each building, covering approximately 1,760 square feet per building. Work includes containment using negative air pressure, removal and disposal of contaminated drywall, insulation, ceiling materials, and finishes, followed by sanitation using approved antimicrobial agents, HEPA vacuuming, and dehumidification. Restoration must match existing conditions with new materials, and post-remediation verification including air quality testing must be documented. All activities must conform to EPA guidelines and IICRC S520 standards. The project is a fixed-price, single lump sum contract with an estimated value between $25,000 and $100,000, to be completed within 60 consecutive business days after receipt of a Notice to Proceed, with work beginning no later than five business days after the agreed-upon start date established during a pre-construction meeting. The solicitation is reserved exclusively for small business set-asides, including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone, Veteran-Owned, and Service-Disabled Veteran-Owned Small Business entities, under NAICS code 562910. Bidders must submit a detailed cost breakout on company letterhead, itemizing materials, labor with categories and rates, equipment, fees, bonds, subcontractor costs, overhead, profit, and other direct or indirect expenses. Required supporting documents include a completed MTC Supplier Packet with W-9, Supplier Self-Certification, proof of insurance including workers’ compensation and general liability with minimum limits, three comparable project references, and a bid bond equal to 20% of the base bid if the proposal exceeds $25,000. Performance and payment bonds equaling 100% of the contract amount are mandatory for bids at or above $25,000, issued through an A-rated surety. Contractors must comply with federal wage requirements under the Construction Wage Rate Requirements, submit weekly certified payroll reports on AIA G702/G703 forms, and maintain a drug-free workplace. Safety protocols require submission of SDS for all hazardous chemicals, daily debris removal, and secure storage of hazardous materials. The contract enforces strict compliance with DOL
Earle C. Clements Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in 2 days
View Details
NAICS: 562910
New
Mold Remediation
Solicitation # mold-remediation
Serrato Corporation DBA Flint Hills Job Corps is soliciting bids for mold remediation services at the Solo Parent Dormitory located at 4620 Eureka Drive, Manhattan, Kansas, with a deadline for proposals on August 13, 2026, at 4:00 PM CST. The scope of work includes the removal of mold contamination from specific areas—rooms 208, 209, 210, 302, 310, and the 300 hallway linen closet—followed by containment, cleaning, sanitization, and prevention of recurrence using methods compliant with the IICRC S520 Mold Remediation Standard, EPA guidelines, OSHA regulations, and Job Corps safety and facility standards. Work must involve the use of critical barriers, HEPA-filtered negative air machines, removal of porous contaminated materials such as drywall, insulation, and carpeting, and application of EPA-registered antimicrobial treatments. Post-remediation verification is mandatory and requires visual inspections, air or surface sampling as required, and a detailed written report including lab results and photos of the remediated areas. Additional deliverables include an initial assessment report, daily work logs, and a one-year warranty on the remediation work. The solicitation is designated as a small business set-aside, open to Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone, Veteran-Owned Small Business, and Service-Disabled Veteran-Owned Small Business concerns. Offerors must submit a completed W-9 and DUNS number with their proposal and provide proof of applicable mold remediation licenses along with a Certificate of Liability Insurance naming the Center as both Certificate Holder and Additional Insured. Labor must comply with the Davis-Bacon Act wage determinations, and if the contract exceeds $30,000, the Serrato 542 form is required, along with SF-1413. Contractors must also ensure all waste is properly bagged, sealed, and disposed of in accordance with regulatory requirements. The period of performance is limited to ten business days, and award will be made to the proposal deemed most advantageous based solely on price and price-related factors, with material compliance serving as a pass/fail gate—any failure to adhere to essential requirements will result in disqualification. Pricing must be submitted with a detailed breakdown of labor hours and costs, materials, other expenses, and total price, though no government estimate or pre-defined CL
Serrato Corporation DBA Flint Hills Job Corps

POSTED

about 7 hours ago

DEADLINE

in 6 days
View Details
NAICS: 562910
New
SLED
NPDES Sediment Removal Wilburton Pond
Solicitation # 26089
The City of Bellevue is soliciting bids for the removal of approximately 222 cubic yards of contaminated sediment from Wilburton Pond located at Wilburton Hill Community Park in Bellevue, Washington, to comply with NPDES correction notice 23128132N. The work requires dewatering using sump or sewage pumps, excavation and hauling via excavator, dump truck, and vector truck, and thermal treatment through incineration due to high levels of lube oils in the sediment. Site controls including fencing to secure the area near the school and soccer field, sediment control wattles, tree protection if mandated by permits, and safety signage are required. All work must adhere to the City’s Clear and Grade Permit and Construction Stormwater Pollution Prevention Plan, with inspections required by discipline in sequence and all final approvals obtained before project closeout. The contractor must comply with prevailing wage laws under Chapter 39.12 RCW, pay all workers the rates determined by the Industrial Statistician, and submit certified wage documentation before any payment. The project is subject to bonding requirements including a performance bond, payment bond, and retainage, though a bid bond is not required. Payment will be issued as a single lump sum upon satisfactory completion by September 30, 2026, subject to final inspection, acceptance, and submission of an approved Affidavit of Wages Paid certified by the Department of Labor and Industries. Bidders must meet strict responsibility criteria, including current Washington State contractor registration under RCW 18.27, a valid Unified Business Identifier, proof of industrial insurance, employment security registration, state excise tax registration, and certification of non-disqualification under RCW 39.06.010 or 39.12.065. Bidders must also hold a City of Bellevue business license, have completed required prevailing wage training unless exempt by experience, and submit all mandatory forms including the Bidder’s Qualification Certificate, Affidavit of Title VI Compliance, Equal Opportunity Requirements, and Certification of Compliance with Wage Payment Statutes. Additional requirements include a valid Certificate of Insurance, pollution liability coverage of at least $1,000,000 per occurrence, automobile liability limits of $1,000,000 per accident, and compliance with invasive species and equipment quarantine protocols. All bids must be submitted electronically through the City’s eProcurement portal by August 20, 2026
City of Bellevue

POSTED

1 day ago

DEADLINE

in 13 days
View Details