Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Calwa Elementary School Reconstruction

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Fresno Unified School District intends to implement the Calwa Elementary School Reconstruction project using Measure H bond funds to modernize facilities built between 1945 and 1970. The project involves the selective demolition and reconstruction of campus buildings to meet current building, accessibility, and educational standards, including the addition of a new Multipurpose Room, Administration Office, and Early Learning Building. Additionally, seven existing buildings will undergo interior renovations, and site improvements will include new parking lots, student and bus drop-off loops, and redeveloped play areas. Construction is scheduled to take place in two overlapping phases from June 2028 to August 2030, with instruction remaining in session throughout the process. The project will not increase student enrollment or overall campus capacity but aims to provide equitable access to safe, energy-efficient, and modern facilities. The project is located in Fresno, California, and is managed by Project Manager Heidi Heltne.

General Info

Fresno Unified will reconstruct Calwa Elementary using Measure H funds from 2028 to 2030.

Agency

California → Fresno Unified School District

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Cedar Avenue and Jensen Avenue, Fresno, CA, 93725

Set-Aside

NONE

Documents

(5)

Calwa ES DEIR_Notice of Completion

PDF

Calwa ES DEIR_Summary Form

PDF

Calwa ES Draft EIR_Appendices

PDF

Calwa ES Draft EIR_Main Doc

PDF

Calwa ES DEIR_Notice of Availability

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fresno Unified School District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fresno Unified School District
Office AddressN/A
Contacts
Heidi HeltneProject Manager
Michael GennaroLead Environmental Specialist

Interested Companies (1)

Show more
Blair, Church & Flynn Consulting Engineers
Fresno, CA

Full Description

Show more
The District proposes to implement the Calwa Elementary School Reconstruction Project (the "project") using Measure H bond funds. The existing campus buildings, constructed between 1945 and 1970, are among the oldest in the District and no longer meet current District standards or adequately serve student needs. The project would involve selective demolition and reconstruction of certain campus buildings, while other buildings would undergo interior renovation. Construction would occur in two overlapping phases while instruction remains in session. The project’s purpose is to replace and renovate facilities that no longer meet current building, accessibility, and educational standards. The proposed campus reconstruction would include a new Multipurpose Room (MPR), Administration Office, and Early Learning Building, as well as interior renovations to seven existing buildings. Site improvements would include a new parking lot with a student drop-off loop in the northwest portion of the campus, a staff parking lot in the southeast, a bus drop-off loop in the south, and redeveloped play areas in the north and northeast. The project would not increase student enrollment or overall campus capacity. Instead, it would provide students and staff with equitable access to modern, energy-efficient, accessible, and safe facilities that are consistent with other recently modernized District campuses. Construction is anticipated to begin in June 2028 and end in August 2030.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education and Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project involves the complete renovation of four bathroom areas totaling approximately 944 square feet in Building 17 and five bathroom areas totaling approximately 1,260 square feet in Building 18. The scope of work includes demolition of existing fixtures, installation of institutional-grade acrylic shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED vanity lighting. All work must comply with ADA, OSHA, and National Electrical Code standards. To maintain center operations, contractors must utilize a phased sequencing approach, renovating one dormitory at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. Evaluation is based on technical alignment with the scope of work, a detailed project schedule, and the submission of a bid sheet with an itemized cost breakdown separating labor and materials. Required documentation includes Vermont state professional licensing, certificates of insurance, a completed W-9, and active registration in the System for Award Management with a Unique Entity ID. The contract mandates 100 percent performance and payment bonds, adherence to the Davis-Bacon Act and Service Contract Act, and compliance with federal prevailing wage laws. Final payment is contingent upon the submission of a signed punch list and applicable warranties, with standard payment terms set at net 30 days.
Northlands Job Corps Center /ETR

POSTED

about 7 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation is for the P1102 Weapons Magazine and Ordnance Operations Facility at the Naval Submarine Base New London in Groton, Connecticut. The project involves a comprehensive scope of work including the construction of six Containerized Long Weapons Storage units, two Box G, and one Box H earth-covered high-explosive magazines, along with an Ordnance Operations building, Truck Inspection facility, and Sentry building. Key technical requirements include the installation of overhead cranes, rigid inclusions, load transfer mats, intrusion detection systems, and grounding and lightning protection. The project also requires the demolition of 18 existing magazines and two buildings, as well as site preparation involving rock excavation, grading, and wetland mitigation. The contract spans a duration of 1828 calendar days and encompasses a wide range of trades, including structural steel, concrete, masonry, electrical utilities, and mechanical systems. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB, under NAICS code 236220. Interested parties must submit their responses by October 31, 2026, and should contact Rahul Maheshwari at J & J Contractors, Inc. for bid invitations and access to the necessary project documents.
J & J Contractors, Inc

POSTED

about 7 hours ago

DEADLINE

in about 2 months
View Details