Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on February 18, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cameron Park Zoo Improvements - Phase 1 Island Repairs

Closed
RFB 2025-013State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The City of Waco is soliciting bids for the Cameron Park Zoo Improvements Phase 1 Island Repairs project to address erosion at Gibbon and Lemur Island. The scope of work includes grading, the installation of filter fabric and stone-filled gabion mattresses, and the placement of grouted riprap to stabilize slopes and protect the pond ecosystem. The selected contractor must implement strict erosion control measures, such as silt fencing and sediment barriers, to safeguard local wildlife and the environment throughout the construction process. The project must be completed within 90 calendar days from the notice to proceed, with a requirement that the contractor self-performs at least 30 percent of the work. Failure to meet the timeline will result in liquidated damages of 950 dollars per day. Interested vendors must submit their responses by March 19, 2025, ensuring all materials and installation methods meet the specified environmental and aesthetic standards of the zoo.

General Info

Waco seeks bids for Cameron Park Zoo island repairs due by March 19, 2025.

Place of Performance

TX, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Cameron Park Zoo
ContactsNo contacts available
OfficeN/A
Organization / AgencyTexas → Cameron Park Zoo
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The City of Waco is seeking vendors for the Gibbon and Lemur Island erosion repair project at the Cameron Park Zoo. This involves grading, installation of gabion mattresses, and placement of grouted riprap to stabilize slopes and prevent future erosion. The project includes reshaping and grading the existing areas around both islands to create a stable foundation for the erosion control measures. Gabion mattresses will be installed on designated slopes with filter fabric underneath to prevent soil migration and ensure long-term stability. The mattresses will be constructed with stone-filled wire mesh baskets, properly anchored and aligned to withstand varying water levels while blending into the natural environment. Grouted riprap will be placed in areas requiring additional protection due to steeper slopes or high hydraulic forces, with detailed joint work to prevent water infiltration and erosion. The contractor will implement erosion control measures throughout the construction process to protect the surrounding pond ecosystem and wildlife. This includes temporary silt fencing and sediment barriers to minimize runoff. Construction is expected to be completed within 90 calendar days from the notice to proceed. All work must comply with the specified grading, materials, and installation requirements, with regular inspections to ensure adherence to the project’s standards and environmental regulations. Gabion mattresses and riprap will be integrated seamlessly into the landscape to restore the islands and enhance long-term stability while preserving the zoo pond’s aesthetic and functional aspects. (1) 30% Self Performance required by Contractor (2) Liquidated Daily Damages: $950.00

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS