Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Candlestick Point Climate Solutions Laboratory

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Candlestick Point Climate Solutions Laboratory project in San Francisco is a climate adaptation initiative focused on restoring shoreline habitats through the construction of a greenhouse, seed lab, workspaces, and a storage unit. These facilities will serve as a hub for propagating native plants essential to habitat recovery in the southeastern region of the city, directly addressing ecosystem degradation and climate resilience needs. The project is being led by the California State Coastal Conservancy and will provide critical community-based resources to the Bayview Hunters Point neighborhood and surrounding areas, fostering local engagement in environmental restoration efforts. All phases of the project—including final design development, permit application submission, and physical construction—are encompassed within the scope of work. The facility will support the propagation of plant materials tailored for shoreline stabilization and habitat creation, contributing to long-term ecological health in a region increasingly vulnerable to sea level rise and urban environmental stressors. The project is publicly forecasted with contact information provided by Project Manager Erica Johnson and Executive Director Hollis Pierce-Jenkins, who represent the overseeing agency and community partner respectively, ensuring alignment between technical execution and community need.

General Info

Candlestick Point lab builds greenhouse and labs to propagate native plants for shoreline restoration in Bayview Hunters Point.

Agency

California State Coastal Conservancy

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

1150 Carroll Ave, San Francisco, CA 94124, San Francisco, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Candelstick Point Climate Solutions Laboratory

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia State Coastal Conservancy
Contacts2 people available
OfficeN/A
Organization / Agency
California State Coastal Conservancy
Office AddressN/A
Contacts
Erica JohnsonProject Manager
Hollis Pierce-JenkinsExecutive Director

Full Description

Show more
The Candlestick Point Climate Solutions Laboratory project consists of preparing final designs; preparing and submitting permit applications; and constructing a greenhouse, seed lab, workspaces, and storage unit to propagate plants for shoreline habitat restoration in San Francisco. The project will address the urgent need for habitat restoration and climate adaptation in the southeastern region of San Francisco. The greenhouse, seed lab, workspaces, and storage unit are collectively referred to as the Climate Solutions Laboratory, which will serve the Bayview Hunters Point community and the surrounding area in San Francisco.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
The Northlands Job Corps Center, operated by Education and Training Resources (ETR), is soliciting bids for a firm fixed price subcontract to perform comprehensive bathroom renovations in two dormitory buildings located in Vergennes, Vermont. The project involves the renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade shower pans, vitreous China toilets, high-pressure plastic laminate countertops, porcelain flooring, and LED lighting. All work must comply with ADA, OSHA, and applicable building, plumbing, and electrical codes, including the National Electrical Code and NFPA 101 Life Safety Code. To maintain center operations, contractors must renovate the dormitories one at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. To be considered, responses must include a completed bid sheet, a detailed cost breakdown separating materials and labor, a proposed project schedule, and proof of current Vermont state professional licensing. The winning bidder must maintain an active registration in SAM.gov with a Unique Entity ID. Depending on the contract value, payment and performance bonds may be required for projects exceeding 35,000 dollars. Additionally, contractors must provide certificates of insurance for Builders Risk, Automobile, Liability, and Workers Compensation, and certify compliance with the Davis Bacon Act and prevailing wage laws. Payment terms are net 30 days upon satisfactory receipt of services and a proper invoice. ETR serves as the sole judge for award selection, and the lowest bid does not guarantee a contract award.
Northlands Job Corps Center /ETR

POSTED

about 7 hours ago

DEADLINE

in 17 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation is for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project involves a comprehensive scope of work over 1828 calendar days, including the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. Key construction elements include foundations with rigid inclusions and load transfer mats, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The scope encompasses extensive site work, including clearing, rock excavation, grading, and wetland mitigation, as well as the installation of access roads, paved loading areas, and landscaping. Electrical requirements cover primary and secondary distribution systems, transformers, and telecommunications infrastructure. Bidding is open to various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must submit their responses by October 31, 2026, and should contact Rahul Maheshwari at J & J Contractors, Inc. for bid invites and access to the necessary documentation.
J & J Contractors, Inc

POSTED

about 7 hours ago

DEADLINE

in 2 months
View Details