Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Canim Lake South Road Slide Culvert Replacement

Closed
BC26174MJ0000Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in 2 months

DEADLINE

in 2 months

AI Contract Overview

Show more

The contract involves the replacement of an existing 900mm corrugated steel pipe with a larger 1800x1200mm box culvert at Canim Lake South Road. The scope includes tree removal, clearing and grubbing, placement of riprap for erosion control, and associated paving work to restore the roadway infrastructure. The project aims to improve drainage capacity and road safety by addressing the slide area with more robust culvert infrastructure. This solicitation is issued by the Southern Interior Regional Office of the Government of Canada, with the contract identified under solicitation number BC26174MJ0000. The project was posted on May 13, 2026, and responses are due by June 4, 2026. Interested parties are encouraged to direct all project-specific inquiries via email to the designated project contact, Daniel Alyward, at daniel.alyward@stantec.com. Additionally, general contracting authority questions can be directed to the listed email for the Contracting Authority. The opportunity is accessible online through CanadaBuys for further details.

General Info

Replace 900mm pipe with larger box culvert, including clearing, paving, erosion control at Canim Lake.

Agency

Government of Canada → Southern Interior Regional Office

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Southern Interior Regional Office
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Southern Interior Regional Office
Office AddressN/A
Contacts
Contracting Authority

Full Description

Show more
Construction to replace existing 900mm CSP with 1800x1200mm Box Culvert at Canim Lake South Road. Tree removal, clearing and grubbing, riprap placement. Paving work.Please direct all project specific enquiries related to this RFx by email to the Project Contact identified below and on the “Opportunity Details” tab under Additional Information SCT3.Project Contact Name: Daniel AlywardEmail Address: daniel.alyward@stantec.com