Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on March 11, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cap and Seal of Fore & Alt Lift

Closed
25S-CU-107State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was initiated following a sprinkler system failure that caused significant water damage. The scope of work requires the remediation of the entire building, including cleaning visible mold from CMU walls, concrete floors, and vinyl tiles, as well as the removal and replacement of affected drywall, gypsum wallboard, and acoustical tile ceiling finishes. Additionally, the contractor must clean or replace damaged theater seating cushions and perform dehumidification to maintain humidity levels at or below 50 percent. All work must adhere to ANSI/IICRC S520 standards, EPA guidelines, OSHA regulations, and the findings of the Micro Air Inc. Mold Testing report dated April 11, 2024. The contract is a single lump sum award based on best value, with evaluation weights distributed across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Key requirements include the provision of a Certified Industrial Hygienist for verification and final clearance, a detailed remediation plan featuring HEPA filtration and negative air pressure, and compliance with Davis-Bacon Act wage determinations. Bidders must hold a valid Indiana Contractor's License and provide proof of automobile and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Proposals must be submitted on company letterhead and include a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee. Work must commence within 14 days of the Notice to Proceed, and payment is issued on Net 30 terms.
Atterbury Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 10 days
NAICS: 562910
New
SLED
MPE Three Classroom Mold Abatement - Rooms 22, 23, 24
Solicitation # 01 (2026-2027)
The Montebello Unified School District is soliciting bids under RFQ No. 01 (2026-2027) for mold abatement services in three classrooms, specifically Rooms 22, 23, and 24 at MPE in Montebello, California. The scope of work includes the abatement process, cleaning of A/C systems, and the movement of furniture before and after the project. Contractors must utilize containment, three-stage decors, and negative air pressure, while maintaining CAL/OSHA safety standards and good housekeeping. All work will be monitored by a third-party consultant, and the contractor is responsible for any necessary re-cleaning if good clearances are not achieved. Regulated disposal must be accompanied by a manifest, and proper mold signage and yellow caution flagging are required on-site. Bids must be submitted by November 2, 2026, at 9:00 a.m. via the designated secure portal. The contract will be awarded to the best value bidder based on price, proven ability to comply with specifications, capability, and credibility, with a preference for local firms in the event of equal low bids. Requirements for submission include a Non-Collusion Affidavit and a Certificate of Workers' Compensation Insurance. The successful vendor must provide a minimum one-year warranty and maintain comprehensive insurance naming the District as an additional insured. Payment is due 30 days after the receipt of a correct invoice or acceptance of goods. The District reserves the right to terminate the agreement with 30 days' written notice or immediately upon failure to perform.
Montebello Unified School District

POSTED

1 day ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This contract involves the complete removal and sealing of the fore and aft lift cylinders located within a concrete vault, with the primary goal of ensuring safety and proper site restoration. The scope includes the careful disassembly of all lift components such as lift heads, arms, saddles, cover plates, and control mechanisms, followed by perimeter saw cutting and removal of the surrounding angle iron frame. The excavated voids will be backfilled with gravel, reinforced with rebar dowels, and then filled with concrete to create a level, flush floor that matches the existing surface. All removed materials, including metal components and debris, must be properly disposed of in accordance with regulations, with hydraulic oil drained from the lift cylinders and contained in sealed drums left on-site for the client to dispose of. The client is responsible for handling the disposal of hydraulic oil, any fluids or water found within the vault, and potential soil remediation if contamination is present. Site access must be coordinated with the facilities manager to ensure safety and efficiency. The contractor is required to adhere to safety standards, maintain a clean work environment, and perform dust control measures. The project is funded through a solicitation posted by the San Mateo County Transit District, with a contract value estimated between $50,000 and $150,000, and must be completed by the response deadline of April 18, 2025. The primary point of contact for the project is Dominic Brooke, reachable via email or phone.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → San Mateo County Transit District
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Statement of Work: CAP & SEAL of Fore & Aft Lift2. Project Objectives• Completely and safely remove the fore and aft lift cylinders and associated components.• Backfill the resulting voids with gravel and concrete to create a flush and level finished floor.• Ensure proper disposal of all removed materials and containment of hydraulic oil.• Leave the concrete vault in place, 3. Scope of Work3.1. Lift Cylinder Removal and Preparation3.1.1. Cylinder Removal:• Completely remove both fore and aft lift cylinders from the concrete vault.3.1.2 Component Removal:Remove all associated components, including but not limited to:• Lift heads.• Lift arms.• Lift saddles.• All metal cover plates.• Inground control mechanisms.3.1.3. Perimeter Saw Cutting:• Saw cut the perimeter of the lift opening to facilitate the removal of the angle iron frame.3.1.4. Angle Iron Frame Removal:• Remove the angle iron frame surrounding the lift.3.2. Backfilling and Concrete Pour3.2.1. Gravel Backfill:Backfill the excavated voids with compacted gravel to a specified level.3.2.2. Rebar Dowel Installation:Install rebar dowels into the existing concrete to provide reinforcement for the new concrete pour.3.2.3. Concrete Pour:Pour concrete to fill the remaining void, ensuring a flush finish with the existing floor level.Finish the concrete to match the existing floor as closely as possible.3.3. Material Handling and Disposal3.3.1. Material Removal:Remove all metal components, excavated materials, and construction debris from the site.3.3.2. Proper Disposal:Properly dispose of all removed materials in accordance with local, state, and federal regulations.3.3.3. Hydraulic Oil Containment:Drain all hydraulic oil from the lift cylinders and place it into provided 55-gallon drums.Leave the sealed 55-gallon drums on-site for the client's disposal.3.3.4. Piping Capping:Cap all piping related to the lift at the nearest accessible source.4. Client Responsibilities4.1. Oil Disposal:The client is responsible for the proper disposal of the 55-gallon drums of hydraulic oil.4.2. Fluid/Water in Pit:If any fluid or water is discovered within the concrete vault, the client will be responsible for determining its nature and arranging for its removal.4.5. Soil Remediation:Contaminated soil remediation, if required, is the sole responsibility of the client.4.7. Site Access:Clear and safe access to the work area for the contractor's personnel and equipment will be provided by the SamTrans. Contractor needs to coordinate this with Facilities manager.5.. Safety:Adhere to all applicable safety regulations and provide a safe working environment.5.1. Clean-up:Maintain a clean and organized work area and perform a thorough clean-up upon completion.Perform dust control during the work.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS