Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

IL, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-175.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Olympic Terrace Water Main Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → Public Utilities (Water) | DPU-W
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs contaminated soil removal and urban forestry protection for prime contractors on City of Naperville municipal projects. Removes and disposes of 100 cubic yards of contaminated soil. Performs tree root pruning and installs tree trunk protection and protective fencing. Requires certifications for hazardous waste hauling and disposal. Delivers certified disposal records and protected tree stands.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was initiated following a sprinkler system failure that caused significant water damage. The scope of work requires the remediation of the entire building, including cleaning visible mold from CMU walls, concrete floors, and vinyl tiles, as well as the removal and replacement of affected drywall, gypsum wallboard, and acoustical tile ceiling finishes. Additionally, the contractor must clean or replace damaged theater seating cushions and perform dehumidification to maintain humidity levels at or below 50 percent. All work must adhere to ANSI/IICRC S520 standards, EPA guidelines, OSHA regulations, and the findings of the Micro Air Inc. Mold Testing report dated April 11, 2024. The contract is a single lump sum award based on best value, with evaluation weights distributed across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Key requirements include the provision of a Certified Industrial Hygienist for verification and final clearance, a detailed remediation plan featuring HEPA filtration and negative air pressure, and compliance with Davis-Bacon Act wage determinations. Bidders must hold a valid Indiana Contractor's License and provide proof of automobile and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Proposals must be submitted on company letterhead and include a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee. Work must commence within 14 days of the Notice to Proceed, and payment is issued on Net 30 terms.
Atterbury Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 11 days
View Details
NAICS: 562910
New
SLED
MPE Three Classroom Mold Abatement - Rooms 22, 23, 24
Solicitation # 01 (2026-2027)
The Montebello Unified School District is soliciting bids under RFQ No. 01 (2026-2027) for mold abatement services in three classrooms, specifically Rooms 22, 23, and 24 at MPE in Montebello, California. The scope of work includes the abatement process, cleaning of A/C systems, and the movement of furniture before and after the project. Contractors must utilize containment, three-stage decors, and negative air pressure, while maintaining CAL/OSHA safety standards and good housekeeping. All work will be monitored by a third-party consultant, and the contractor is responsible for any necessary re-cleaning if good clearances are not achieved. Regulated disposal must be accompanied by a manifest, and proper mold signage and yellow caution flagging are required on-site. Bids must be submitted by November 2, 2026, at 9:00 a.m. via the designated secure portal. The contract will be awarded to the best value bidder based on price, proven ability to comply with specifications, capability, and credibility, with a preference for local firms in the event of equal low bids. Requirements for submission include a Non-Collusion Affidavit and a Certificate of Workers' Compensation Insurance. The successful vendor must provide a minimum one-year warranty and maintain comprehensive insurance naming the District as an additional insured. Payment is due 30 days after the receipt of a correct invoice or acceptance of goods. The District reserves the right to terminate the agreement with 30 days' written notice or immediately upon failure to perform.
Montebello Unified School District

POSTED

about 21 hours ago

DEADLINE

in 4 days
View Details

More opportunities from Illinois → Public Utilities (Water) | DPU-W

Same awarding agency

NAICS: 237110
New
SLED
Cress Creek Water Main Improvements
Solicitation # 26-176
The City of Naperville is soliciting bids for the Cress Creek Water Main Improvements project, which involves replacing approximately 9,600 feet of aging cast iron water mains with 8-inch and 12-inch pipes. The work will take place within the Cress Creek Subdivision on Summit Hills Lane, Heatherton Drive, Thunderbird Lane, Briargate Drive, and Royal Bombay Court. Bidders must provide pricing for both a Base Bid using ductile iron and a Bid Alternate A using PVC. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, provided they are pre-qualified by IDOT in drainage and submit all required documentation, including a 10% bid deposit and an IDOT Form BC 57 Affidavit of Availability. Performance is scheduled to begin no earlier than April 15, 2027, with substantial completion required by October 31, 2027, and final completion by June 30, 2028. The contractor is responsible for all quality control testing and must adhere to IDOT standard specifications for concrete mixtures and trench bracing, as well as ADA guidelines for sidewalk curb ramps. Key administrative requirements include compliance with the Illinois Prevailing Wage Act, the submission of a safety checklist within 30 days of award, and the maintenance of project records for at least four years following completion. Payment will be processed via ACH through the City of Naperville Civic Access portal.
Water and Sewer Line and Related Structures Construction

POSTED

about 13 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237110
New
SLED
Lawnmeadow Water Main Improvements
Solicitation # 26-173
The City of Naperville, Illinois, has issued solicitation 26-173 for the Lawnmeadow Water Main Improvements project. The scope of work involves replacing approximately 6,500 feet of aging cast iron water mains from the 1960s with 8-inch and 12-inch ductile iron pipes. The project covers several streets within the Lawnmeadow Subdivision, including Oswego Road, Lawnmeadow Lane, River Road, Berry Court, Clover Court, Thornapple Drive, and Wild Cherry Lane. Key deliverables include the installation of gate valves, fire hydrants, and water services, with some segments requiring specialized directional drilling. All work must adhere to City Standards and current ADA guidelines. The contract will be awarded to the lowest responsive and responsible bidder based on the Total Base Bid or Total Alternate A Bid. Qualified bidders must be pre-qualified by IDOT in drainage (#12), provide evidence of three similar projects completed within the last five years, and submit an IDOT Form BC 57 Affidavit of Availability. The performance period begins no earlier than April 15, 2027, with a substantial completion date of October 31, 2027, and final completion by June 30, 2028. Administrative requirements include a bid deposit of 10 percent of the total bid, as well as performance and payment bonds. Payment terms are net 30 via ACH through the City's Civic Access portal. The contractor must provide a one-year warranty on materials and workmanship and retain all project records for four years following completion. Responses were due electronically by November 18, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

about 13 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237110
New
SLED
Bay Colony Water Main Improvements
Solicitation # 26-174
The City of Naperville, Illinois, is soliciting bids for the Bay Colony Water Main Improvements project, identified as solicitation 26-174. The project involves replacing approximately 10,100 feet of aging cast iron water mains from the 1970s with 8-inch and 12-inch ductile iron pipes. The work will be performed within the Bay Colony Subdivision, specifically covering Waxwing Avenue, Fredrick Lane, Carol Lane, Bay Colony Drive, Terrance Drive, and Olympus Drive. While the base bid specifies ductile iron, an alternate bid for PVC is also requested. The scope includes specialized tasks such as contaminated soil removal, tree root pruning, and sanitary service locating, with a special work allowance of 50,000 dollars. The contract will be awarded to the lowest responsible bidder. To be considered, bidders must provide an IDOT Prequalification Certificate for drainage, an IDOT Form BC 57 Affidavit of Availability, and evidence of three similar projects completed within the last five years. Required submissions include a bid deposit equal to 10 percent of the total bid, an Affidavit of Compliance, and a Responsible Bidder Ordinance Form. The successful contractor must comply with the Illinois Prevailing Wage Act, the Employment of Illinois Workers on Public Works Act, and ADA standards for sidewalk curb ramps. Additionally, the contractor must implement a written substance abuse prevention program and provide performance and payment bonds within 20 days of receiving the contract.
Water and Sewer Line and Related Structures Construction

POSTED

about 14 hours ago

DEADLINE

in 22 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS