This Solicitation opportunity from Department Of Defense was posted on March 21, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CAP,VALVE

Awarded
N0010422QFG08Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333998
New
Federal
70--INTERFACE UNIT,DATA, IN REPAIR/MODIFICATION OF
Solicitation # N0038326QFC05
This sole source solicitation, issued by NAVSUP Weapon Systems Support Philadelphia, requires the overhaul, upgrade, repair, testing, and inspection of 37 Interface Units, Data (NSN 016241529, Part Number 698258-7). The objective is to return these units to a Ready For Issue condition, with the work to be performed by Lockheed Martin in Marietta, Georgia. The government has designated this as a sole source requirement because it lacks the necessary technical data to contract with other sources. Award is contingent upon Government Source Approval, and any offeror not already approved must submit documentation per the NAVSUP WSS Source Approval Brochure. The contractor is responsible for providing all labor, materials, and tooling, with a strict prohibition on the use of MIL-W-81381 wire and unauthorized part cannibalization. Quality standards are rigorous, requiring compliance with ISO 9001, SAE AS9100, and specific calibration standards such as ANSI/NCSL Z540.3. The contract includes detailed protocols for handling items that are Beyond Economical Repair (BER) or Missing on Induction (MOI), requiring written concurrence from DCMA. Packaging and marking must adhere to MIL-STD-2073 and MIL-STD-130, respectively. Invoicing and payment will be processed electronically through the Wide Area WorkFlow system.
Navsup Weapon Systems Support

POSTED

about 5 hours ago

DEADLINE

in about 4 hours
NAICS: 333998
New
Federal
PLUG COVER
Solicitation # N0038325QT423
Solicitation N0038325QT423, issued by NAVSUP Weapon Systems Support Philadelphia, is a competitive request for quotes for the procurement of plug covers, specifically item ACN 1RM 1680-LL-F02-N129 P8. The government intends to make a single award to the responsible offeror whose quote is technically acceptable and determined to be most advantageous, with a primary evaluation focus on past performance via the Supplier Performance Risk System and price as a secondary factor. The solicitation has undergone multiple extensions, with the final deadline for receipt of offers set for October 29, 2026, at 4:30 PM EST. Quotes must be submitted electronically to Carolyn A. Clark. The contract requires delivery within 90 days, with early and incremental deliveries preferred. Strict adherence to military packaging and marking standards is mandatory, specifically MIL-STD-2073-1 for system stock and OCONUS shipments, and ASTM D3951 for certain CONUS shipments. All containers must be marked per MIL-STD-129. Quality management must comply with ISO 9001 or SAE AS9100 standards, and inspection and acceptance will occur at the origin. Invoicing and receiving reports must be processed through the Wide Area Workflow system. The procurement incorporates various federal and defense acquisition regulations, including Buy American preferences, hazardous material identification, and cybersecurity safeguarding requirements.
Navsup Weapon Systems Support

POSTED

about 5 hours ago

DEADLINE

in 13 days
NAICS: 333998
New
Federal
SCREEN,PERF SHEET
Solicitation # N0010426QBE95
Solicitation N0010426QBE95 is a total small business set-aside request for quotation issued by NAVSUP Weapon Systems Support Mech for the procurement of Screen, Perf Sheet (NSN 4330-01-500-5936). The acquisition is based on a lowest priced, technically acceptable (LPTA) award basis, with a 10 percent price evaluation preference applied to HUBZone small business concerns. Following multiple amendments, the final offer due date is October 26, 2026. The contract is established as FOB Destination, and the offeror must specify the delivery lead time in days. Technical compliance is strictly governed by the Individual Repair Part Ordering Data (IRPOD), drawings, and technical data available via the BPMI e-commerce site, with mandatory vendor review of the IRPOD. Quality assurance is managed through a higher-level contract quality requirement per MIL-I-45208, and inspection and acceptance will occur at the contractor's plant. Key deliverables include the hardware and a Certificate of Compliance per DI-MISC-81356, as well as a pre-manufacturing procedure package due within 45 days of award. The contractor must adhere to stringent packaging and marking standards, specifically MIL-STD-2073-1 for system stock and ASTM D3951-18 for certain CONUS shipments, while utilizing Wide Area Workflow (WAWF) for invoicing. Additionally, the contract mandates compliance with cybersecurity requirements for safeguarding covered defense information under DFARS 252.204-7012 and prohibits the intentional addition of mercury to any supplied hardware.
Navsup Weapon Systems Support Mech

POSTED

about 5 hours ago

DEADLINE

in 17 days
NAICS: 333998
New
Federal
RUGGED,FLAT,PANEL
Solicitation # N0010425QLE15
Solicitation N00104-25-Q-LE15 is a request for quotations issued by NAVSUP Weapon Systems Support for the teardown, evaluation, and repair of rugged flat panels (NIIN 016756928). The government is seeking a firm-fixed-price agreement for the repair of these assets, with a target Repair Turnaround Time (RTAT) of 90 days measured from the physical receipt of the asset at the contractor facility to final government acceptance. The procurement is issued under Emergency Acquisition Flexibilities, and the final quantity requirement was adjusted to 4 units. Award will be made to a single, technically acceptable offeror based on a determination of the most advantageous offer, with past performance weighted as more important than price. The contract mandates strict quality and compliance standards, including Government Source Inspection (GSI) and physical identification per MIL-STD-130. Packaging and marking must adhere to MIL-STD-2073-1 and MIL-STD-129, with freight handled as FOB Origin via Navy CAV or Proxy CAV. Contractors are required to use the Wide Area Workflow (WAWF) system for invoicing and payment. Failure to meet the established RTAT may result in price reductions per unit per month of unexcusable delay. The submission deadline for quotations has been extended multiple times, with the most recent update setting the response deadline for October 30, 2026.
Navsup Weapon Systems Support Mech

POSTED

about 5 hours ago

DEADLINE

in 7 days
NAICS: 333998
New
DIBBS
BOTTLE, SCREW CAP
Solicitation # SPE2DS-27-T-1151
Solicitation SPE2DS-27-T-1151 is a request for quotations from the DLA Troop Support Medical Supply Chain for the procurement of 10 cylindrical plastic screw cap bottles. Each bottle must have an overall height of 4 inches, an overall diameter of 2.235 inches, a capacity of 4 ounces, and include a screw cap with a liner and a permanent legend reading USED OIL. The items are to be delivered FOB Destination to the Assault Craft Unit ACU 2 in Virginia Beach, Virginia, with a required delivery date of November 2, 2026, and a delivery lead time of 20 days after order. The contract mandates strict adherence to packaging and marking standards, requiring commercial packaging per ASTM D3951 and palletization according to RP001, though the DLA Master List of Technical and Quality Requirements takes precedence. Marking must comply with MIL-STD-129, while any medical-related marking must follow Medical Marking Standard No. 1. Additionally, the contractor must ensure that mercury or mercury-containing compounds are not intentionally added to the hardware. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and compliance with various FAR and DFARS clauses regarding cybersecurity, the Buy American Act, and the prohibition of covered defense telecommunications equipment. Quotations are due by November 4, 2026.
MEDICAL SUPPLY CHAIN MD SURG FSF

POSTED

about 24 hours ago

DEADLINE

in 5 days
NAICS: 333998
New
DIBBS
FILTER ELEMENT, FLUID
Solicitation # SPE7M1-27-T-1800
Solicitation SPE7M1-27-T-1800 is a small business set-aside issued by the Defense Logistics Agency (DLA) Weapons Support Maritime Supply Chain for the procurement of 222 fluid filter elements under NSN 4330-01-331-0627. The requirement is designated as a critical application item with identified compatible parts from Pall Industrial Hydraulics Corp and Parker-Hannifin Corporation. Delivery is required within 30 days after order, with a need ship date of December 10, 2026, and an original required delivery date of December 12, 2026. Shipping terms are FOB Origin, with the final destination being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contract mandates strict adherence to MIL-STD-2073-1E for packaging, MIL-STD-129 for marking, and RP001 for palletization. Inspection and acceptance will occur at the destination per FAR 52.246-2. Technical and quality requirements are governed by the DLA Master List of Technical and Quality Requirements. Additionally, the contractor must comply with various DFARS and FAR clauses, including the Buy American Act, the Berry Amendment, and specific prohibitions against the intentional addition of mercury or the use of covered defense telecommunications equipment. Invoicing and payment must be processed electronically through the Wide Area WorkFlow (WAWF) system.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN

POSTED

about 24 hours ago

DEADLINE

in 10 days
NAICS: 333998
New
DIBBS
SEXUAL ASSAULT DETERMI
Solicitation # SPE2DH-27-T-0327
Solicitation SPE2DH-27-T-0327 is a federal procurement issued by the Defense Logistics Agency (DLA) Troop Support Medical Supply Chain FSH for the supply of Sexual Assault Determination Kits. The requirement specifies the 15S Fingerstick Version designed for room temperature storage, specifically Tri-Tech Forensics Part No. RE-0DOD(FS). The contract calls for two packages, with each package containing 15 individual kits. Each kit must include a box with an affixed envelope, suspect and victim instructions, DD Form 2911, a foreign material bag with a paper sheet, and an underpants bag. Delivery is required within five days after receipt of order (ADO), with the place of performance and delivery located in Williamsburg, Virginia. The procurement is governed by NAICS code 333998 and utilizes a fixed-price structure with inspection and acceptance occurring at the destination. Compliance with Medical Marking Standard No. 1 and MIL-STD-129 is required for labeling, and packaging must adhere to ASTM D3951 or TQ requirement IP025 for hazardous materials. Administrative processing, including invoicing and receiving reports, must be conducted through the Wide Area WorkFlow (WAWF) system. The award process may include a HUBZone price evaluation preference and may be eligible for automated award. Key regulatory requirements include the Buy American Act, DFARS cybersecurity standards for safeguarding covered defense information, and various FAR clauses regarding equal opportunity and the prohibition of human trafficking.
MEDICAL SUPPLY CHAIIN FSH

POSTED

about 24 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

This solicitation, issued by Navsup Weapon Systems Support Mech, is for the procurement of valve caps designated as Special Emphasis material. Due to the critical nature of the shipboard systems where these components are used, the contract mandates strict quality control procedures to prevent failures that could lead to serious personnel injury or loss of vessel. The required material is a bonnet manufactured from ASTM-B369, UNS C96400, in accordance with specific Leslie drawings and certification data sheets. The contractor must adhere to rigorous testing and quality assurance standards, including hydrostatic testing, liquid penetrant inspection, and radiography. All production and repair welding must comply with specified Navy standards, and the contractor is required to maintain a quality system meeting ISO-9001, ISO-10012, or ANSI-Z540.3 requirements. Comprehensive traceability is mandatory, requiring unique markings on all materials to link them directly to their chemical and mechanical certification reports. The contract is a DO-rated order certified for national defense use and requires bilateral execution with written acceptance from the contractor.

General Info

Contract Value

$183,228

NAICS

333998 - All Other Miscellaneous General Purpose Machinery Manufacturing

Place of Performance

PA, USA

Set-Aside

NONE

Award Issued Date

Documents

2

NO0104-22-Q-FG08 Amendment 0001

PDF, High priority: read this firstamendment
High

NO0104-22-Q-FG08 - CAP, VALVE

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Sep 30, 2022 to Mar 31, 2023. NAICS code changed from 333999 to 333998.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Office AddressMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more
CONTACT INFORMATION|4|N743.18|WVD|+1 (555) 000-0000|contact@example.gov| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See Sections C & E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|B/A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Material - Invoice & Receiving Report (Combo), Certifications - Stand Alone Receivign Report|Material - Inspection/Acceptance at Source, Certifications - Inspection at Destinationi & Acceptance at Other|TBD|N00 104|TBD|N39040 - Certs, S4306A - Material|N50286|TBD|133.2|NA|NA|N39040 - Certs|NA|NA|See DD1423|contact@example.gov| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|1 year from date of delivery|1 year from date of delivery||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|N332919|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. DD1423 Data Item A001 may be waived if already on file at NAVSUP WSS Mech. 2. Certifications shall be submitted in WAWF at least 20 days prior to therequired delivery date to allow time for Portsmouth NSY review. 3. Any contract awarded as a result of this solicitation will be DO ratedorder certified for national defense use under the Defense Priorities andAllocations System (DPAS). 4. The resulting award of this solicitation will be issued bilaterally,requiring the contractor's written acceptance prior to execution. 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;24500N 35795 D B 29878N 35795 C B; 2.2.3 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-B369 | | | |200401|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 ;BONNET to be in accordance with Leslie drawing 24500N, piece 43, service part number 614063132 and Certification Data sheet 29878N, except as amplified or modified herein.; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;BONNET, Piece 43; Material - ;ASTM-B369, UNS C96400; 3.3 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below. Test - Weldability Test of ASTM-B369 material Item - ;BONNET, Piece 43; Performance - ASTM-B369 Acceptance - ASTM-B369 Test - Hydrostatic Test Item - Each Component Performance - ;CD sheet 29878N Note G; (for a minmum of three minutes) Acceptance - No leakage or permanent deformation Test - ;Liquid penetrant Inspection; Item - ;Each bonnet; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;MIL-STD-2035, Class 1 for castings; 3.4 Radiography is required on ;the BONNET, piece 43; . 3.5 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.6 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.6.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. 3.7 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.7.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.7.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/ 3.7.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.8 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.9 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.10 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.11 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds. 3.11.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.11.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. ''WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC'.' WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ'') 3.11.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010, S9074-AR-GIB-010A/278,248d the contract. 3.11.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.11.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.11.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted as part of the qualification data. 3.11.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element. 3.11.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.11.9 When production or repair welding is required on titanium materials, theapplicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval. 3.11.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF. 3.11.11 A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following: a) Filler Metal LOT number(s) b) Specification and Type c) A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements. d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption. 3.11.12 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.12 Radiography (RT) - Radiography must be performed in accordance with T9074-AS-GIB-010/271. RT acceptable criteria for castings to be criticality level I per the applicable table of S9074-AR-GIB-010A/278. RT acceptance criteria for weldments to be per the applicable table of S9074-AR-GIB-010A/278 (P-1 piping) or MIL-STD-2035, class 1, as applicable. 3.12.1 See CDRL DI-MISC-80678 (RSS) - The Contractor or activity performing the radiography must be responsible for preparing the radiographic shooting sketches (RSS) in accordance with T9074-AS-GIB-010/271. Shooting sketch approval is not required for radiography of weldments. The radiographic standard shooting sketches (RSSS) referenced on the applicable drawing may be used, however, since T9074-AS-GIB-010/271 permits a variety of processes, the RSSS may not be applicable as they will not necessarily depend only on the coverage requirements, but also on the equipment and procedures of the particular radiographic facility. Approval of these shooting sketches or radiographic standard shooting sketches is required per S9074-AR-GIB-010A/278. If this data has been previously approved by a Navy activity, the original approval letter must be submitted at the same time as RT film and reader sheet submittal. 3.12.2 All pieces radiographed must be permanently marked with "RT" and a unique RT serial number. (The unique RT serial number must be directly traceable to the RT film.) 3.12.3 See CDRL DI-MISC-80678 (Production Radiography) - Production Radiography requires final acceptance by the Navy. The items listed below must be submitted for final acceptance, cataloging, file, and retention. They must be submitted and approved prior to shipment of the applicable hardware. However, when the source certification clause is invoked, they must be submitted a minimum of forty-five (45) working days prior to the date of source certification inspection. (a) Film (b) RSS/RSSS (c) RS (Reader Sheets) (d) Documentation record listing the part number, heat/lot traceability, and theunique RT serial number (which is traceable to the RT film and reader sheet) 3.13 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-4 3.13.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.13.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.13.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.13.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.13.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.14 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.14.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.14.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.15 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.15.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.15.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.15.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.15.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.15.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.16 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.16.1 Visual examination upon receipt to detect damage during transit. 3.16.2 Inspection for completeness and proper type. 3.16.3 Verification of material quality received. 3.16.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.16.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.16.6 Identification and protection from improper use or disposition. 3.16.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.16.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.16.9 Material returned to the contractor must be handled as GFM. 3.17 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.17.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order. 3.18 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.18.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.18.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.18.3 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ; ; 3.19 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply: 3.19.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied. 3.19.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability marking used with the altered material and at a minimum contain the information below. TRACEABILITY MARKING ________________________________________________ (marking on finished item) IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO HEAT/LOT NUMBER ______________ AND HEAT TREAT NUMBER ____________________ (when applicable) _________________________________________ DATE _____________________ (name and signature of auth. co. rep.) 3.19.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited. 3.19.4 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.19.5 If material is received without the required certification papers ...

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 332919
New
Federal
STRAINER,SEDIMENT
Solicitation # N0010426QEG40
Solicitation N00104-26-Q-EG40 is a total small business set-aside request for quotation issued by NAVSUP Weapon Systems Support Mech for the procurement of sediment strainers, NSN 4730-01-527-9800. The contract follows a lowest priced, technically acceptable award basis, with a delivery requirement of 180 days FOB Destination. Technical compliance is governed by TDP Version 004 and the Individual Repair Part Ordering Data, with a strict order of precedence placing contract amendments and the schedule of supplies above technical drawings and specifications. All items must adhere to MIL-I-45208 quality standards and MIL-STD-2073 packaging requirements, specifically requiring green poly packaging per MIL-PRF-23199. Key deliverables include a procedure package containing drawings and pre-manufacturing submittals due within 45 days after award, and a final package of Vendor Certified Reports of Test and Inspection due at the end of the contract. The contractor must maintain an inspection system acceptable to the government, with inspection and acceptance occurring at the contractor's plant. Special restrictions include a prohibition on the intentional use of mercury and strict export controls, as certain technical documents are designated as Not Releasable to Foreign Nationals. Administrative requirements include the use of the Wide Area Workflow system for invoicing and compliance with various FAR and DFARS clauses regarding cybersecurity, domestic preferences, and safety notifications.
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS