Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Cape Romanzoff

Active
W911KB-15-R-0048Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves performing remedial construction actions at the Cape Romanzof Long Range Radar Site (LRRS) in Alaska, focusing on environmental restoration across five specific sites impacted by contaminated soils and debris. The work includes excavation, transportation, and disposal of PCB, lead, and small arms debris-contaminated soils, as well as site investigations for hazardous substances such as diesel-range organics, gasoline-range organics, polycyclic aromatic hydrocarbons, and BTEX compounds. The contractor is responsible for all necessary labor, equipment, materials, transportation, and professional supervision to ensure compliance with relevant federal, state, and military environmental regulations, particularly under the Alaska Department of Environmental Conservation and CERCLA guidelines. The project includes detailed planning, safety programs, and quality assurance measures, with a clear timeline requiring work commencement within ten days of notice to proceed and completion by April 30, 2017. Specific tasks cover project management, soil excavation and disposal at various landfill and tram terminal areas, remediation of the small arms range, and environmental sampling at an open burn area. Each task requires the preparation and government approval of comprehensive work plans and safety plans prior to fieldwork, with thorough documentation and reporting including monthly status reports, remedial action or site investigation reports, and data submittals formatted per established standards. The contractor must restore sites post-remediation, ensuring environmental stabilization and removal of all equipment and waste. The contract also mandates strict subcontractor reporting and data management, with performance governed by the USACE Contracting Officer and adherence to detailed submission protocols for regulatory compliance and government oversight.

General Info

Remedial construction at Cape Romanzof LRRS involving contaminated soil removal, site restoration, and reporting compliance.

NAICS

562910 - Remediation Services

Place of Performance

Cape Romanzoff, Cape Romanzoff, AK, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SN Endist Alaska
Contacts1 person available
OfficeANCHORAGE, AK, 99506-0898, USA
Office AddressANCHORAGE, AK, 99506-0898, USA
Contacts

Full Description

Show more
This requirement was fulfilled by the authority in FAR 6.302-5(b)(4) sole source awards under the 8(a) program 15-U.S.C. 637. Below is the scope for this requirement: PERFORMANCE WORK STATEMENT Remedial Action - Construction Cape Romanzof Long Range Radar Site (LRRS), Alaska 11 August 2015 1.0 INTRODUCTION/BACKGROUND Cape Romanzof was one of the original 12 Aircraft Control and Warning sites built in the 1950s in Alaska as part of an air defense communications system (USACE 2013). In 1958, a White Alice Communications System (WACS) was activated and operated until 1979. The Cape Romanzof WACS was deactivated and replaced by an Alascom-owned satellite earth terminal in 1979 (USACE 2013). In 1982 and 1983, the remaining military personnel were inactivated and replaced by contractor personnel to maintain the Joint Surveillance System equipment. Personnel numbers were further reduced in 1985 when the Minimally Attended Radar (MAR) was activated. All unnecessary facilities were demolished by 1988. The Cape Romanzof LRRS currently serves as a MAR site and is part of the Alaska Radar System managed by the 611th Air Support Group. The United States Air Force's (USAF) Cape Romanzof LRRS is located within the Yukon Delta National Wildlife Refuge in western Alaska, approximately 540 air miles west of Anchorage, 165 air miles northwest of Bethel, and 170 air miles southeast of Nome. It sits on a small peninsula extending into the Bering Sea. The nearest towns to Cape Romanzof LRRS are Scammon Bay (population 498) and Hooper Bay (population 1,137), which are approximately 15 miles east and south, respectively. The communities are not connected to Cape Romanzof LRRS by road; however, winter trails provide some access to the facility. Cape Romanzof LRRS includes 4,900 acres of land that have been divided into two areas, the Lower Camp and the Upper Camp. The Lower Camp lies at the head of an alpine tundra valley next to intermittent streams, which drain into a perennial stream, Fowler (Nilumat) Creek. The Upper Camp is situated atop Towak Mountain, a high ridge directly above the head of the valley. The mountain top Upper Camp is linked to the Lower Camp by a gravel road and tramway year- round. This Performance Work Statement (PWS) defines work requirements necessary to complete Remedial Action - Construction (RA-C), for five (5) Environmental Restoration Program (ERP) sites at Cape Romanzof LRRS, Alaska: - LF003 - Landfill No. 2 (DBWT20157602) - SS016 - Upper Tram Terminal Area (DBWT20157602) - SS017 - Lower Tram Terminal Area (DBWT20157602) - SR018 - Small Arms Range (DBWT20157001) - OB942 - Open Burn Area (DBWT20158001) The contractor shall furnish all necessary labor, equipment, materials, and transportation necessary to perform the work described in this Performance Work Statement (PWS). The Contractor shall provide adequate professional supervision and quality control to ensure the accuracy, quality, and completeness, of the required work. All work shall be performed in accordance with all applicable federal, state, and local regulations as well as U.S. Air Force policies and procedures. The Contractor shall be responsible for identifying the applicable federal, state and local regulations that will affect this contract. All remediation activities are conducted under Alaska's Department of Environmental Conservation (ADEC) Alaska Administrative Code, Title 18, Chapter 75 (18 AAC 75), following guidance from the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). 2.0 DESCRIPTION OF TASKS The Contractor shall be responsible for performing the work in the base tasks listed in Table 1 and described below. All work performed by the Contractor shall be designed and implemented in a manner which complements earlier and ongoing environmental investigations at Cape Romanzof. Table 1 - List of Tasks Task No. Task Name 1 Project Management 2 PCB and Lead contaminated soil excavation at sites LF003, SS016, and SS017 (DBWT20157602) 3 Small arms debris and Lead contaminated soil excavation at Site SR018 (DBTWT20157001) 4 Site Investigation at Site OB942 (DBWT20158001) Optional Task 2A Additional PCB and Lead contaminated soil excavation at sites LF003, SS016, and SS017 Optional Task 3A Additional small arms debris and Lead contaminated soil excavation at Site SR018 Optional Task 4A Additional Site Investigation 2.1 Task 1 - Project Management The Contractor shall manage and control all work activities, including subcontracted services, associated with this PWS. Monthly status reports consisting of a summary of work that was completed the previous month, work planned for future month(s), and other pertinent project information are required. These reports shall be submitted via email to the U.S. Army Corps of Engineers - Alaska District (USACE) Contracting Officer (KO), Contracting Officer's Representative (COR), and Project Manager (PM) no later than the 7th day of the calendar month following the month covered by the report. The Contractor shall submit a detailed schedule within ten (10) days of award of this contract showing the periods in which work will be performed and milestone dates to complete the planning, fieldwork, and reporting tasks. The project schedule shall be provided in a Gantt chart format and shall include dates for starting and completing critical features of the work. The Contractor shall update and resubmit the schedule when changes to the schedule are realized with each monthly status report submission. The Contractor shall arrange, prepare for, and participate in the following meetings: - Kick off meeting with USACE-AK KO, COR, and PM (assume one 2-hour meeting). - Technical Project Planning (TPP) Meeting (assume four 2-hour meetings in Anchorage) - Progress Meetings (assume eight 2-hour meetings). Presentation materials shall be prepared for these meetings. Materials shall be provided for review ten (10) days prior to each meeting. Meeting minutes shall be prepared by the Contractor and provided to the USACE PM within seven days of the conclusion of each meeting. There may be occasions when subsequent meetings may be called by either party to re-confirm mutual understandings and/or address contract deficiencies that may require corrective actions. 2.2 Task 2 - PCB and Lead contaminated soil excavation at sites LF003, SS016, and SS017 (DBWT20157602) Task 2.1 - Planning Documents The Contractor shall prepare a work plan (WP) that presents the approach and methodologies to be used to conduct the required work (Remedial Action Work Plan). The WP shall be developed in accordance with the procedures described in the Uniform Federal Policy for Quality Assurance Project Plan (UFP-QAPP) Manual. The WP shall describe in detail the quality assurance, quality control, and other technical activities that shall be implemented to ensure that quality data are collected to support project data quality objectives. The draft WP shall be submitted electronically to the USACE PM for review within sixty (60) days of contract award. The Contractor shall revise the draft WP as necessary based on all review comments received and submit a final WP within fifteen (15) days of receipt of review comments. The final WP shall be submitted both electronically (in native file and PDF formats) and as hard copies (five copies required). The Contractor shall develop and implement a written Safety and Health Program in accordance with guidelines specified in EM 385-1-1. The Contractor shall prepare an Accident Prevention Plan (APP) for the site; a Site Safety and Health Plan (SSHP) shall be included in the APP as an attachment. The APP may be submitted as part of the WP or as a stand-alone document. A draft APP shall be submitted electronically to the USACE PM within sixty (60) days of contract award. The Contractor shall revise these plans as necessary and submit a final APP within fifteen (15) days of receipt of USACE review comments. The final APP shall be submitted both electronically (in both MSWord and PDF formats) and as hard copies (two copies required). The WP and APP must be approved by the Government prior to the commencement of the fieldwork. All work shall be conducted in accordance with the approved plans. Task 2.2 - Remedial Action - Construction The Contractor shall complete RA-C of Cape Romanzof LRRS. The Contractor shall complete the activities outlined below for each site: Site RAC Activities LF003 - Approximately 375 tons of PCB and lead contaminated soil and approximately 38 tons of PCB contaminated sediment will be excavated and disposed of off-site in drums or Super Sacks. SS016 - Approximately 525 tons of PCB and lead contaminated soil will be excavated and disposed of off-site in drums or Super Sacks. SS017 - Approximately 300 tons of PCB and lead contaminated soil will be excavated and disposed of off-site in drums or Super Sacks. The Contractor shall excavate, transport, and dispose of approximately 1238 tons of PCB and lead contaminated soil at an approved treatment/disposal facility. Surface soil and sediment with PCB concentrations ?1 mg/kg and surface soils with lead concentrations of ?400 mg/kg will be excavated and containerized for transport via barge to the Port of Seattle in Washington, and then via railcar to the Waste Management facility in Arlington, Oregon. An Approval to Transport letter shall be obtained from the Alaska Department of Environmental Conservation (ADEC) prior to transporting the soils. The Contractor shall collect soil samples to guide the excavation and characterize the soils for disposal purposes. Confirmation samples shall be collected from the excavation walls and the bottom of the excavation in accordance with ADEC Field Sampling Guidance. Soil samples shall be analyzed for PCB using Method SW8270 and analyzed for lead via Method SW6020. All confirmation samples and extent of final excavation boundaries and depths shall be surveyed. Analytical laboratories must be accredited under the National Environmental Laboratory Accreditation Program (NELAP) and the Alaska Department of Environmental Conservation Accreditation Program. Analytical data shall be reviewed and validated at an appropriate quality control level in a manner consistent with the most recent version of the Department of Defense Quality Systems Manual for Environmental Laboratories (DoD QSM) to determine whether the data meets the project objectives. The Contractor shall utilize cleanup approaches/methods that mitigate the amount of soil and debris generated for disposal. Contractor shall utilize proper handling, characterization, transportation, and disposal of all IDW generated as part of this PWS in accordance with applicable State and Federal regulations. Tons shall mean a short ton, or 2,000 pounds. Items measured as "ton" shall be weighed on an approved scale, to be furnished by the Contractor, which is accurate for the weight of empty and laden trucks anticipated in this project. The Contractor shall perform earthwork to restore the site after cleanup activities have been accomplished. This includes, but is not limited to backfilling, hauling, grading, contouring, and re-vegetating. The Contractor shall use a grass seed mixture approved for use in that region of Alaska. The Contractor shall restore roads that have been damaged by heavy machinery or impacted by site restoration operations. The Contractor shall remove all equipment and supplies brought onto the site and properly dispose of all wastes generated during the work activities. Prior to leaving the site, the Contractor shall participate in a site reconnaissance with an authorized Air Force/USACE representative to insure all on-site project objectives were met. Task 2.3 - Remedial Action Report The Contractor shall prepare and submit a pre-draft (for USACE and Air Force review only), draft, and final Remedial Action Report. The pre-draft Remedial Action Report shall be prepared for Air Force review no later than 90 days after the end of the field season and demobilization. All documents shall follow the requirements of the most recent version of the Manual for Electronic Deliverables (MED), USACE. The report shall include, but not be limited to, the following information: - Executive summary of fieldwork and results; - A narrative report describing activities undertaken to complete the project, including variances from the planning documents; - Tables, drawings, and figures to support the narrative report, summarize site data, show locations of field activities, and illustrate processes and decision matrices; - Appendices containing copies of all Visual Inspection Checklists; chemical data generated; copies of all permits; copies of waste manifests, waste profile sheets, certificates of disposal, and other pertinent documentation; copies of all field notes, logs, forms, and daily and other reports; and progress photographs; and - ADEC Laboratory Data Review Checklist completed and included with the Chemical Data Quality Review (CDQR). Analytical data will be reported in a Stage 3 data package. In addition, data will be reported in at Staged Electronic Data Deliverable (SEDD) 5.2 format. Optional Task 2A: Additional PCB and Lead contaminated soil excavation The Contractor shall excavate, transport, and dispose of PCB and lead contaminated soil in accordance with the PWS. This option may be exercised on a per ton basis 1,000 times. 2.3 Task 3 - Small arms debris and Lead contaminated soil excavation at Site SR018 (DBTWT20157001) Task 3.1 - Planning Documents The Contractor shall prepare a work plan (WP) that presents the approach and methodologies to be used to conduct the required work (Remedial Action Work Plan). The WP shall be developed in accordance with the procedures described in the Uniform Federal Policy for Quality Assurance Project Plan (UFP-QAPP) Manual. The WP shall describe in detail the quality assurance, quality control, and other technical activities that shall be implemented to ensure that quality data are collected to support project data quality objectives. The draft WP shall be submitted electronically to the USACE PM for review within sixty (60) days of contract award. The Contractor shall revise the draft WP as necessary based on all review comments received and submit a final WP within fifteen (15) days of receipt of review comments. The final WP shall be submitted both electronically (in native file and PDF formats) and as hard copies (five copies required). The Contractor shall develop and implement a written Safety and Health Program in accordance with guidelines specified in EM 385-1-1. The Contractor shall prepare an Accident Prevention Plan (APP) for the site; a Site Safety and Health Plan (SSHP) shall be included in the APP as an attachment. The APP may be submitted as part of the WP or as a stand-alone document. A draft APP shall be submitted electronically to the USACE PM within sixty (60) days of contract award. The Contractor shall revise these plans as necessary and submit a final APP within fifteen (15) days of receipt of USACE review comments. The final APP shall be submitted both electronically (in both MSWord and PDF formats) and as hard copies (two copies required). The WP and APP must be approved by the Government prior to the commencement of the fieldwork. All work shall be conducted in accordance with the approved plans. Task 3.2 - Remedial Action - Construction The Contractor shall complete RA-C of Cape Romanzof LRRS. The Contractor shall complete the activities outlined below for site SR018: Site RAC Activities SR018 - Approximately 15 tons of Lead contaminated soil will be excavated and disposed of off-site in drums or Super Sacks. The Contractor shall excavate, transport, and dispose of approximately 15 tons of small arms debris and lead contaminated soil at an approved treatment/disposal facility. Surface soil with Pb concentrations ?400 mg/kg shall be excavated, staged, manifested, and transported off-site to a RCRA?permitted chemical waste landfill capable of managing RCRA regulated lead contaminated soil. An Approval to Transport letter shall be obtained from the Alaska Department of Environmental Conservation (ADEC) prior to transporting the soils. The Contractor shall collect soil samples to guide the excavation and characterize the soils for disposal purposes. Confirmation samples shall be collected from the excavation walls and the bottom of the excavation in accordance with ADEC Field Sampling Guidance. All confirmation samples and extent of final excavation boundaries and depths shall be surveyed. Analytical laboratories must be accredited under the National Environmental Laboratory Accreditation Program (NELAP) and the Alaska Department of Environmental Conservation Accreditation Program. Analytical data shall be reviewed and validated at an appropriate quality control level in a manner consistent with the most recent version of the Department of Defense Quality Systems Manual for Environmental Laboratories (DoD QSM) to determine whether the data meets the project objectives. The Contractor shall utilize cleanup approaches/methods that mitigate the amount of soil and debris generated for disposal. Contractor shall utilize proper handling, characterization, transportation, and disposal of all IDW generated as part of this PWS in accordance with applicable State and Federal regulations. Tons shall mean a short ton, or 2,000 pounds. Items measured as "ton" shall be weighed on an approved scale, to be furnished by the Contractor, which is accurate for the weight of empty and laden trucks anticipated in this project. The Contractor shall perform earthwork to restore the site after cleanup activities have been accomplished. This includes, but is not limited to backfilling, hauling, grading, contouring, and re-vegetating. The Contractor shall use a grass seed mixture approved for use in that region of Alaska. The Contractor shall restore roads that have been damaged by heavy machinery or impacted by site restoration operations. The Contractor shall remove all equipment and supplies brought onto the site and properly dispose of all wastes generated during the work activities. Prior to leaving the site, the Contractor shall participate in a site reconnaissance with an authorized Air Force/USACE representative to insure all on-site project objectives were met. Task 3.3 - Remedial Action Report The Contractor shall prepare and submit a pre-draft (for Air Force review only), draft, and final Remedial Action Report. The pre-draft Remedial Action Report shall be prepared for Air Force review no later than 90 days after the end of the field season and demobilization. All documents shall follow the requirements of the most recent version of the MED. The report shall include, but not be limited to, the following information: - Executive summary of fieldwork and results; - A narrative report describing activities undertaken to complete the project, including variances from the planning documents; - Tables, drawings, and figures to support the narrative report, summarize site data, show locations of field activities, and illustrate processes and decision matrices; - Appendices containing copies of all Visual Inspection Checklists; chemical data generated; copies of all permits; copies of waste manifests, waste profile sheets, certificates of disposal, and other pertinent documentation; copies of all field notes, logs, forms, and daily and other reports; and progress photographs; and - ADEC Laboratory Data Review Checklist completed and included with the Chemical Data Quality Review (CDQR). Analytical data will be reported in a Stage 3 data package. In addition, data will be reported in at Staged Electronic Data Deliverable (SEDD) 5.2 format. Optional Task 3A - Small arms debris and Lead contaminated soil excavation The Contractor shall excavate, transport, and dispose of lead contaminated soil in accordance with the PWS. This option may be exercised on a per ton basis 100 times. 2.4 Task 4 - Site Investigation at Site OB942 (DBWT20158001) Task 4.1 - Planning Documents The Contractor shall prepare a work plan (WP) that presents the approach and methodologies to be used to conduct the required work (Site Investigation Work Plan). The WP shall be developed in accordance with the procedures described in the Uniform Federal Policy for Quality Assurance Project Plan (UFP-QAPP) Manual. The WP shall describe in detail the quality assurance, quality control, and other technical activities that shall be implemented to ensure that quality data are collected to support project data quality objectives. The draft WP shall be submitted electronically to the USACE PM for review within sixty (60) days of contract award. The Contractor shall revise the draft WP as necessary based on all review comments received and submit a final WP within fifteen (15) days of receipt of review comments. The final WP shall be submitted both electronically (in native file and PDF formats) and as hard copies (five copies required). The Contractor shall develop and implement a written Safety and Health Program in accordance with guidelines specified in EM 385-1-1. The Contractor shall prepare an Accident Prevention Plan (APP) for the site; a Site Safety and Health Plan (SSHP) shall be included in the APP as an attachment. The APP may be submitted as part of the WP or as a stand-alone document. A draft APP shall be submitted electronically to the USACE PM within sixty (60) days of contract award. The Contractor shall revise these plans as necessary and submit a final APP within fifteen (15) days of receipt of USACE review comments. The final APP shall be submitted both electronically (in both MSWord and PDF formats) and as hard copies (two copies required). The WP and APP must be approved by the Government prior to the commencement of the fieldwork. All work shall be conducted in accordance with the approved plans. Task 4.2 - Remedial Action - Construction The Contractor shall complete a Site Investigation at Site OB942, Cape Romanzof LRRS. The Contractor shall complete the activities outlined below for Site OB942: Site RAC Activities OB942 - Approximately 35 sample locations will be collected and analyzed for DRO, GRO, PAHs and BTEX. Additional COPCs (e.g. gasoline-range organics [GRO], diesel-range organics [DRO], and polycyclic aromatic hydrocarbons [PAH]) associated with burning activities may be present at OB942, but the presence of these analytes has not yet been investigated. The contractor shall provide a site investigation to include DRO, GRO, PAHs, and BTEX. The Site is approximately 8,000 square feet. The contractor shall assume 35 sample locations, 2 samples per location at depths of 6" and 2'. Analytical laboratories must be accredited under the National Environmental Laboratory Accreditation Program (NELAP) and the Alaska Department of Environmental Conservation Accreditation program. Analytical data shall be reviewed and validated at an appropriate quality control level in a manner consistent with the most recent version of the Department of Defense Quality Systems Manual for Environmental Laboratories (DoD QSM) to determine whether the data meets the project objectives. The Contractor shall utilize cleanup approaches/methods that mitigate the amount of soil and debris generated for disposal. Contractor shall utilize proper handling, characterization, transportation, and disposal of all IDW generated as part of this PWS in accordance with applicable State and Federal regulations. The Contractor shall remove all equipment and supplies brought onto the site and properly dispose of all wastes generated during the work activities. Prior to leaving the site, the Contractor shall participate in a site reconnaissance with an authorized Air Force/USACE representative to insure all on-site project objectives were met. Task 4.3 - Site Investigation Report The Contractor shall prepare and submit a pre-draft (for USACE and Air Force review only), draft, and final Site Investigation Report. The pre-draft Site Investigation Report shall be prepared for USACE and Air Force review no later than 90 days after the end of the field season and demobilization. All documents shall follow the requirements of the most recent version of the MED. The report shall include, but not be limited to, the following information: - Executive summary of fieldwork and results; - A narrative report describing activities undertaken to complete the project, including variances from the planning documents; - Tables, drawings, and figures to support the narrative report, summarize site data, show locations of field activities, and illustrate processes and decision matrices; - Appendices containing copies of all Visual Inspection Checklists; chemical data generated; copies of all permits; copies of waste manifests, waste profile sheets, certificates of disposal, and other pertinent documentation; copies of all field notes, logs, forms, and daily and other reports; and progress photographs; and - ADEC Laboratory Data Review Checklist completed and included with the Chemical Data Quality Review (CDQR). Analytical data will be reported in a Stage 3 data package. In addition, data will be reported in at Staged Electronic Data Deliverable (SEDD) 5.2 format. Optional Task 4A: Additional Site Investigation The Contractor shall collect samples for analysis of DRO, GRO, PAHs, and BTEX in accordance with the PWS. This option may be exercised on a per sample basis 50 times. 3.0 PERIOD OF PERFORMANCE The Contractor shall commence work under this contract within 10 calendar days after the date the Contractor receives the Notice to Proceed (NTP). The contractor shall complete all work, including final reporting, for all base tasks, no later than 30 April 2017. 4.0 SUBMITTALS AND SCHEDULE Drafts of all documents shall be submitted by the Contractor for review and comment by USACE PM, AF PM and ADEC. The Contractor shall provide written responses to comments. The Contractor shall furnish copies of the submittals as listed below in Table 1: Table 1 - Required Submittals Submittal Type Hard Copies Electronic Copies Monthly Status Reports 0 via email Work Plan - Draft (All 3 sets) 3 3 CDs Report Response to Comments 0 via email Work plan - Final (All 3 sets) 3 3 CDs Analytical Data Deliverables 1 3 CDs Report- Pre-Draft (All 3 sets) 3 3 CDs Report Response to Comments 0 via email Report- Draft (All 3 sets) 3 3 CDs Report Response to Comments 0 via email Report- Final (All 3 sets) 3 3 CDs emails (pdf documents) to: David Jadhon, Project Manager (david.a.jadhon@usace.army.mil) The Contractor shall be responsible for the hard copy and electronic delivery of submittals. The Government will only accept paper copy reports and electronic deliverables with no discrepancies between the two. All draft and final electronic deliverables (except for email only submittals) shall conform to the requirements identified in the 2011 Alaska District Corps of Engineers Environmental Manual for Electronic Deliverables. The Contractor will produce electronic deliverables (ERPIMS) consistent with the requirements at the following website: http://www.afcee.af.mil/resources/restoration/erpims/index.asp The Contractor shall procure the necessary permissions and software to produce and upload the required deliverable. In addition, the Contractor is responsible for uploading the data to the ERPIMS database, and making any required corrections to the data. Once the process is complete and the Final Deliverable has been accepted, the Contractor shall provide a copy of the correct and consistent ERPIMS deliverable and acceptance documentation to the Project Manager and the Contracting Officer. All analytical laboratory data packages generated during this investigation shall become the property of the Air Force. The hardcopy laboratory data packages shall be provided as a separate deliverable. The deliverable requires the submittal of a single; complete (including chromatograms) hard copy of each data package and a searchable pdf file of the data packages. The analytical electronic data deliverables shall be provided as part of the Remedial Investigation Report electronic deliverable and will include a pdf format data package (including raw data, see list of requirements in QSM Appendix DOD-A), the EDF 1.2a and SEDD 2a. All electronic analytical data packages will be accepted only if they are error free and match the hardcopy data package. The Contractor shall send a letter of transmittal listing the material being submitted with each submission. The letter shall reference the project by title. The Government must receive a complete submission before a review will be undertaken. Partial submissions will not be accepted without prior approval from the Contracting Officer. Submissions shall be made to: U.S. Army Engineer District, Alaska CEPOA-PM-ESP (David Jadhon) P.O. Box 6898 Joint Base Elmendorf Richardson, Alaska 99506-0898 All work including final reporting shall be completed by the end of the period of performance as stated in Section 3.0. 5.0 CONTRACTOR MANPOWER & RESERVE AFFAIRS The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor is required to completely fill in all the information in the format using the following web address: https://cmra.army.mil. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer's Technical Representative; (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data; (5) Estimated direct labor hours (including subcontractors); (6) Estimated direct labor dollars paid this reporting period (including subcontractors); (7) Total payments (including subcontractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each subcontractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information; (11) Locations where contractor and subcontractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of contractor and subcontractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. The reporting period will be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor's systems to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website. 6.0 AUTHORITY AND POINTS OF CONTACT The USACE Contracting Officer is the only person with the authority to act as agent of the Government under this contract. Only the Contracting Officer has authority to: (1) Direct...

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was prompted by a sprinkler system failure and requires the remediation of mold throughout the entire building, including the cleaning or replacement of damaged theater seating cushions. All work must adhere to ANSI/IICRC S520 standards, EPA guidelines, OSHA regulations, and the Micro Air Inc. Mold Testing report dated April 11, 2024. Key technical requirements include achieving interior humidity levels of 50 percent or less and the provision of a Certified Industrial Hygienist to conduct daily site visits and a final clearance walkthrough. This is a single lump sum contract set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Interested offerors must attend a mandatory site visit on October 27, 2026, and submit typed proposals on company letterhead by November 9, 2026. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, proof of an Indiana Contractor's License, Davis Bacon Act wage rate certification, and specific automobile and workers compensation insurance coverage. Payment terms are Net 30, and work must commence within 14 days of the Notice to Proceed.
Atterbury Job Corps Center

POSTED

about 10 hours ago

DEADLINE

in 19 days
View Details
NAICS: 562910
New
Maui JCC Mold Remediation and Removal of Water-Damaged Materials
Solicitation # maui-jcc-mold-remediation-removal-water-damaged-materials
Management & Training Corporation is soliciting bids for a fixed-price, single lump sum contract for mold remediation and removal of water-damaged materials at the Maui Job Corps Center in Makawao, Hawaii. The project focuses on Building 11, specifically the cafeteria, food service areas, restrooms, and adjoining spaces, following significant water intrusion from a severe windstorm. The scope of work includes establishing containment barriers with HEPA-filtered negative air pressure, removing mold-affected porous materials such as drywall and insulation, cleaning nonporous surfaces, and evaluating the adjoining culinary classroom. The estimated contract value ranges from $25,000 to $100,000, with awards based on overall best value. Bidders must complete a mandatory physical site visit and submit a detailed itemized proposal, including a bid breakout and three comparable references, by October 23, 2026. For bids of $25,000 or more, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. The contract is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Compliance with Hawaii statewide wage determinations and federal safety standards is mandatory, and a 10% retainage will be withheld from payments until substantial completion and final acceptance.
Management & Training Corporation/Hawaii/Maui Job Corps Center

POSTED

about 10 hours ago

DEADLINE

in 3 days
View Details

More opportunities from Department Of Defense → W2SN Endist Alaska

Same awarding agency

NAICS: 237990
New
Federal
Lowell Creek Tunnel Repairs, Seward, Alaska
Solicitation # W911KB27BA005
The Department of Defense, through the Alaska District of the U.S. Army Corps of Engineers, is issuing a presolicitation notice for the Lowell Creek Tunnel Repairs in Seward, Alaska. This project involves repairing worn areas and installing new center rails within a 2,100-foot, horseshoe-shaped tunnel that diverts Lowell Creek through Bear Mountain into Resurrection Bay. The scope of work includes structural repairs to the intake transmission tunnel and outlet, the construction of a concrete channel, and the use of abrasion-resistant concrete featuring silica fume and fly ash or slag for alkali-silica reactivity mitigation. The contractor will be responsible for providing all labor, equipment, materials, and supervision, including managing tunnel dewatering and winter construction challenges and implementing a temporary flood management plan. The project will be awarded as a firm-fixed-price contract under NAICS code 237990, with an estimated construction magnitude between 10 million and 25 million dollars. The solicitation is expected to be available via SAM.gov on or after November 3, 2026, with an anticipated award date in December 2026. The period of performance is estimated at 1,000 calendar days. Bids will be accepted electronically through the PIEE Solicitation Module under solicitation number W911KB27BA005. All offerors must be registered in SAM.gov, and the contract will adhere to Construction Wage Rates.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 236220
New
Federal
Market Intelligence for EIE483 and EIE484
Solicitation # W911KB27RWP11
The U.S. Army Corps of Engineers, Alaska District, is seeking market intelligence via a Request for Information for two Military Construction projects at Eielson Air Force Base, Alaska. The first project, EIE483, involves the design and construction of a Joint Mobility Center Expansion, including a Deployment Processing Facility, hazardous materials storage, and exterior covered storage canopies, with an estimated magnitude of 249.2 million dollars. The second project, EIE484, consists of constructing a 225-bed permanent party dormitory with an estimated magnitude of 305 million dollars. Both projects are planned for a period of performance from FY27 through FY31, with design starting in FY27 and construction beginning in FY28 for the dormitory and FY29 for the mobility center. The government intends to utilize Other Transaction Agreements under 10 U.S.C. 2808a, with a planned two-phase approach consisting of design and pre-construction services followed by final design and construction. Potential delivery methods under consideration include Progressive Design-Build or Construction Manager at Risk. This RFI is strictly voluntary and is being used to assess industry capabilities, budget realism, and preferred acquisition strategies. Interested parties must submit the Market Intelligence Questionnaire by October 29, 2026, at 14:00 Alaska Time. The projects fall under NAICS code 236220 for Commercial and Institutional Building Construction, with a small business size standard of 45 million dollars.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS