This Solicitation opportunity from Iowa was posted on September 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Car853313A 25-13

Closed
25-13State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
26-037-CIP
Solicitation # 26-037-CIP
The City of Dublin, Ohio, is soliciting bids for the SportsOhio PowerPlay Demolition project, located at 6314 Cosgray Road. The scope of work involves the demolition and restoration of the Can-Am/go cart track, batting cages, concrete seating pads, and mini golf course, along with associated hardscapes. Key activities include the removal and disposal of bridges, culverts, foundations, and engineered stream channels, as well as unclassified excavation, site grading for drainage, and the abandonment of private site utilities. The project has an engineer's estimate of 259,606.50 dollars and a final completion deadline of April 30, 2027, with a specific requirement that tree clearing occur between October 1 and March 31. The contract will be awarded based on a lowest and best analysis, evaluating bidders on financial stability, litigation history, and a minimum of five years of experience in relevant activities such as concrete removal and structure demolition. Bidders must submit their proposals electronically via Bid Express and provide a bid guaranty in accordance with the Ohio Revised Code. The project requires the payment of prevailing wages and emphasizes the use of Ohio-based products and labor. Performance must adhere to the City of Dublin and City of Columbus construction specifications, as well as OSHA safety regulations. Payment is structured at 95 percent of approved monthly applications until the work is 50 percent complete, at which point retainage may be reduced at the city's discretion.
City of Dublin, OH - Engineering

POSTED

about 6 hours ago

DEADLINE

in 16 days
NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 8 hours ago

DEADLINE

in 6 days
NAICS: 238910
New
Federal
Y--Hickman Wildlife Water Catchment and Pipe Fence
Solicitation # 140L1726Q0054
Solicitation 140L1726Q0054 is a Total Small Business Set-Aside request for quote issued by the Department of the Interior, Bureau of Land Management, for the Hickman Wildlife Water Catchment and Pipe Fence project in Socorro County, New Mexico. The project is a firm-fixed-price contract involving the demolition and removal of existing infrastructure and the construction of a 1,000 square-foot metal catchment consisting of two 20 by 25 foot structures with galvanized gutters and propanel tops. Additionally, the contractor is required to install two BOSS tanks and erect 1,000 linear feet of pipe-and-cable fencing. The updated period of performance is scheduled from November 17, 2026, to January 25, 2027. Award will be based on the most advantageous offer, with price serving as the primary factor, followed by technical approach, nongovernmental experience, and a detailed work breakdown schedule illustrating the critical path. Contractors must adhere to Davis-Bacon wage determinations for Socorro County and comply with OSHA, EPA, and ADA regulations. Key submission requirements include a signed SF 1442, a price schedule, and a payment bond or irrevocable letter of credit due within 10 days of award. The final deadline for proposal submission is November 9, 2026, at 3:00 PM ET, with a site visit scheduled for October 29, 2026, at the Socorro Field Office.
New Mexico State Office

POSTED

about 12 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The contract for the Carroll County Nutrient Reduction Wetland project involves constructing a wetland system designed to reduce nutrient runoff, with work including site clearing, excavation of approximately 17,500 cubic yards, installation of steel sheet pile weirs, water control structures, culverts, riprap, seeding, straw wattles, and earthfill. The project is estimated to cost between $350,000 and $400,000, with completion deadlines set for November 15, 2026, for most activities and December 15, 2026, for seeding, subject to liquidated damages for delays. The work must adhere to detailed engineering plans, specifications, and standards prepared by licensed engineers, emphasizing site safety, environmental compliance, and quality assurance through inspections, testing, and certifications. The project is governed by a comprehensive set of general and special conditions that specify bonding, insurance, responsibility for testing, schedule submission, land rights, and procedures for contract modifications, terminations, and dispute resolution, all organized under project-specific documentation rather than standard FAR clauses. Bids are to be submitted electronically via the Iowa IMPACS system by October 8, 2025, with a 10% bid bond required and a performance/payment bond of 100% of the contract value. The process emphasizes responsibility determination based on bid price and bidder qualifications, with the award going to the lowest responsible bidder. The contract includes detailed requirements for submittals, progress schedules, and compliance with federal, state, and local laws, but does not specify federal clause numbering or standard FAR provisions. Administrative contacts are provided for bid questions and contract management, and the project scope, specifications, and documentation are fully integrated into the contract package, ensuring clarity on deliverables, performance standards, and administrative procedures.

General Info

Agency

Iowa Agriculture and Land Stewardship

Place of Performance

IA, USA

Set-Aside

NONE

Documents

14

Addendum No. 1 to Bid Documents CAR853313A Nutrient Reduction Wetland Project - Bid No. 25-13

PDF, High priority: read this firstamendment
High

Bid Bond for Nutrient Reduction Wetland Project, Carroll County, Iowa

PDF, High priority: read this first1 page · contract-document
High

Bid Proposal and Schedule of Prices for Nutrient Reduction Wetland Project, Carroll County, Iowa

PDF, High priority: read this first4 pages · rfq
High

Car853313A Nutrient Reduction Wetland Project Bid Proposal

PDF, High priority: read this firstrfb
High

Car853313A Nutrient Reduction Wetland Project - Sealed Bid Solicitation

PDF, High priority: read this first1 page · ifb
High

Car853313A Project Schedule of Prices Contract No. 25-13

PDF, High priority: read this firstschedule-of-prices
High

Carroll County Nutrient Reduction Wetlands Construction Plans - CAR853313A

PDF, High priority: read this first21 pages · contract-document
High

Construction Monitoring Plan for 2024 Nutrient Reduction Wetland Project

PDF, High priority: read this first2 pages · contract-document
High

Construction Specifications for Breakpoint Nutrient Reduction Wetland, Carroll County, IA

PDF, High priority: read this first62 pages · contract-document
High

Design Report for Carroll County Breakpoint Nutrient Reduction Wetland Project

PDF, High priority: read this first37 pages · other
High

Iowa Nutrient Reduction Wetland Project Construction Bid No. 25-13

PDF, High priority: read this first54 pages · ifb
High

Notice of Award and Notice to Proceed for Car853313A Nutrient Reduction Wetland Project

PDF, High priority: read this first15 pages · award
High

Nutrient Reduction Wetland Carroll County IA Plan and Specifications

PDF, High priority: read this firstsow
High

Nutrient Reduction Wetland Project Construction Contract Car853313A

PDF, High priority: read this firstcontract-document
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIowa Agriculture and Land Stewardship
Contacts1 person available
OfficeN/A
Organization / Agency
Iowa Agriculture and Land Stewardship
Office AddressN/A

Full Description

Show more
This project is for a traditional breakpoint nutrient reduction wetland. Work involves selective clearing, excavation, earthfill, steel sheet pile weir construction, water control structures & seeding. This project includes around 17,500 CY of earthwork, 2,595 SF of steel sheet pile, water control structure and inlet riser, 136 feet of 15-inch diameter CMP, 812 TN of riprap, 98 CY of concrete grout, 12.7 AC of seeding and 2,175 feet of 9-inch diameter straw wattle. The estimated construction cost range is $350,000 to $400,000.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS