Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on August 15, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Carillon Canal Lock Vertical Door Support System Rehabilitation - Carillon Canal National Historic Site

Closed
5P468-23-0060/AInternational

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 6 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 7 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

This contract involves the rehabilitation of the vertical door support system at the Carillon Canal National Historic Site. The scope of work includes the design, fabrication, supply, and installation of new grab bars and clamping bars for the downstream door, as well as the replacement of seals and hardware. The contractor is responsible for the complete dry docking of the lock, which includes water management, pumping, and the removal of sludge and waste. Because work occurs during winter, the contractor must provide heated shelters for installation and manage water seepage caused by ice lifting the cofferdam. The project is estimated between 500,001 and 1,000,000 dollars, excluding taxes, and must be completed by March 31, 2024. Bids must follow a two-submission procedure and be submitted exclusively via fax or a specific email address, as SAP Ariba is not being used. A site visit was mandatory for all bidders to ensure a full understanding of the technical requirements and safety protocols. All work must comply with the National Park Act and associated regulations.

General Info

Rehabilitate Carillon Canal door supports and seals by March 31, 2024, under $1M.

Place of Performance

*Canada *Quebec (except NCR), CAN

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Parks Canada
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Annik PichePoint of Contact

Full Description

Show more
5P468-23-0060/A Carillon Canal Lock Vertical Door Support System Rehabilitation – Carillon Canal National Historic Site BIDS RECEIVED BY FAX AND EMAIL WILL BE ACCEPTED AS OFFICIAL. PARKS CANADA IS NOT CURRENTLY ACCEPTING BIDS VIA SAP ARIBA, YOU MUST SUBMIT YOUR BID VIA FAX OR EMAIL AS INDICATED IN THE SOLICITATION DOCUMENT. BIDS RECEIVED IN-PERSON OR BY COURIER WILL NOT BE ACCEPTED. The only acceptable email address for responses to the bid solicitation is contact@example.gov . Bids submitted by email directly to the Contracting Authority or to any email address other than contact@example.gov will not be accepted. The only acceptable facsimile for responses to bid solicitations is +1 (555) 000-0000. The maximum email file size that Parks Canada is capable of receiving is 15 megabytes. The Bidder is responsible for any failure attributable to the transmission or receipt of the emailed bid due to file size. The Bidder should be cognisant of the size of the email as a whole, and not only the attachments. Please take into consideration that some attachments, when sent, may be resized during the email transfer. If the email size is too large, the Bidder should send the bid in multiple emails properly labeled with the solicitation number, project name, and indicate how many emails are included (ex. 1 of 2). Emails with links to bid documents will not be accepted. Bid documents must be sent as email attachments. REQUIREMENT General The work covered by this project include the design, fabrication, supply of all materials, labour, tools, equipment, protection, and transportation required to complete the work, all in accordance with the requirements specified on the drawings and in the various sections of the specifications. The coordination and distribution of work for subcontractors is the Contractor’s responsibility and any reference to documents referring to subcontractors must not be construed as binding the Ministry to such a distribution. Since the work will be performed during the winter period, the Contractor must provide heated shelters for the installation of the new bearing bars. Carillon Lock Drying of lock by Contractor A cofferdam will be installed by the Ministry Representative on the downstream. The addition of waterproofing membrane or other material to minimize the cofferdam leakage is the responsibility of the Contractor. Upon arrival at the work site, the Contractor will become responsible for water management in the lock and work areas. The Contractor must plan the partial cleaning of the lock bottom where work is required and the approach including, but not limited to, the removal of sludge and other waste materials and the storage, characterization, and disposal of such materials in accordance with the current laws. The Contractor must keep the lock dry (between the downstream cofferdam and the upstream sectors portals, including the inlet and outlet valve tunnels accessible through the diffuser) for the duration of the work of this contract. The Contractor must consider that captive fish will be moved by the Ministry Representative during the start of this contract. The Contractor must schedule this activity in its calendar. Anticipate a way to control water inside the lock that could seep in despite being dry docked. Ensure working surfaces are dry and free of stagnant water. Work under this Contract includes, but is not limited to: Dry docking of the lock and pumping of water during the entire period of the work including removal of liquid or solid precipitations (snow or ice). See Section 01 35 43 for environmental requirements and Appendix A for dry docking of the lock.Parks Canada Agency Construction. Removal of all dewatering systems upon completion of the work. Re-opening of the lock upon completion of the work. For information, the following items have been used during the last cofferdam installations in addition to the resistant waterproof membranes. This information is provided as a guide only, the Contractor is entirely responsible for the methodology: - Backhoe; - Waste container; - As a minimum, provide the following equipment for pumping out leaks: a. 2 pumps of 12’’, 2 days duration b. 2 pumps of 6’’, complete duration of work c. 2 pumps of 4’’, complete duration of work d. 2 to 4 pumps of 1-1/2’’, complete duration of work During winter conditions, ice will lift the cofferdam beams allowing more water to seep in. See pictures in Appendix A for reference. Various sealing materials (membrane, oakum, volcanic ash). Mechanical Work The work covered by this contract shall include but not be limited to : Door stabilization to allow for the completion of the work. The door shall be supported near the threshold on support blocks. A system for moving the door laterally when it is leaning close to the threshold to ensure sufficient clearance in the door guides for inspection, installation and welding of new grab bars shall be provided by the Contractor. The method shall be submitted for review and acceptance by the Ministry Representative. Although the existing structure is equipped with a suspension system allowing the door to be stabilized in place at several positions, this system does not allow the door to be completely suspended above the door leaf. In addition, this system does not allow for lateral movement of the door in the guides, which leaves very little space for the work to be done. For these reasons, it is suggested to stabilize the door near the threshold without using the existing suspension system. Removal of the upstream and downstream guide wheels and side guide rollers to allow lateral movement of the door. Removal of seals from entire door. All gasket bolts and nuts shall be replaced and sized to match existing bolts. Design, fabrication, supply, transportation, and installation of new grab bars and clamping bars for the downstream door. Reference drawings of the door and grab bars are provided in the appendix for information. Cutting of existing grab bars shall be done from cold and followed by grinding to a flat surface. Surface flatness shall be less than 0.5 mm for every 2 meters of length. The Contractor must provide the flatness report for review and acceptance by the Ministry Representative. Shop drawings, including all fabrication and welding details, of the new support bars and clamp bars and the method of replacement shall be provided for review and acceptance by the Ministry Representative. Design notes shall be provided for review and acceptance by the Ministry Representative. Providing welding procedures for review and acceptance by the Ministry Representative. Supply of new bolts and nuts for the sealing system. Cleaning, greasing and reinstallation of the upstream and downstream guide wheels and side guide rollers of the door. Grease must be of the company FUCHS type RENOLIT CXS SMG2. Replace seals after installation of new grab bars. Retouche de peinture sur toutes les zones endommagées durant les travaux. Commissioning. To assist with bonding and insurance requirements, this project is estimated at a value between $500,001 > $1,000,000, Taxes extra. TWO-SUBMISSION BID This Bid shall be submitted following a “two-submission” procedure. Refer to SI04 of the Special Instructions to Bidders. PERIOD OF CONTRACT / DELIVERY DATE Contractor must perform and complete the Work no later than March 31,2024. MANDATORY SITE VISIT It is mandatory that the Bidder or a representative of the Bidder visit the work site. Arrangements have been made for the site visit to be held at the parking lot at the bottom of Carillon’s lock (230 Rue du Barrage, Saint-André-d'Argenteuil, QC J0V 1X0) on June 29, 2023 at 10:00 AM local time. Safety Attire - It is mandatory that all persons attending the site visit have the proper personal protection equipment (safety glasses, footwear, vests and hard hats etc.). Contractor`s personnel/individuals who do not have the proper safety attire may be denied access to the site. Description of the visit : 10H00 – Meeting at the parking lot at the bottom of Carillon’s lock. Th meeting will begin with a presentation of the project. In order to properly visualize the work area, access will be authorized near the vertical lift gate by the lock deck and will be supervised by a representative of Parks Canada. The bidder will be escorted to the access point by a representative of Parks Canada. 11H30 : End of the visit Bidders must communicate with the Contracting Authority contact@example.gov no later than 24h before the visit to confirm attendance and provide the name(s) of the person(s) who will attend. Bidders who do not confirm attendance, provide the name(s) of the person(s) who will attend, or who do not complete and submit the above certification as required will not be allowed access to the site. Bidders will be required to sign an attendance sheet. Bidders should confirm in their bid that they have attended the site visit. Bidders who do not attend the mandatory site visit or do not send a representative will not be given an alternative appointment and their bid will be declared non-responsive. Any clarifications or changes to the bid solicitation resulting from the site visit will be included as an amendment to the bid solicitation. ENQUIRIES All enquiries of a technical and contractual nature are to be submitted to the Contracting Authority contact@example.gov . Enquiries regarding this solicitation must be submitted in writing and should be received no later than five (5) business days prior to the date set for solicitation closing to allow sufficient time to provide a response. Enquiries received after that time may result in an answer NOT being provided. INFORMATION National Parks Regulations require that all work is to be performed in accordance with the ordinances, laws, rules and regulations set out in the National Park Act. Bidders that consider themselves qualified to provide this Work and intend to submit bids on this project should obtain documents from the Government Electronic Tendering Service through the Government of Canada tendering service at canadabuys.canada.ca/en/tender-opportunities. Addenda, when issued, will be available from the Government of Canada tendering service. Bidders that elect to base their bids on documents obtained from other sources do so at their own risk. Late submissions will not be considered. The Crown retains the right to negotiate with suppliers on any procurement. Documents may be submitted in either official language of Canada. Parks Canada has made every effort to provide equivalent documents in both official languages, however, if you find any discrepancies between the English and French documents, please notify the contract officer listed in this opportunity as soon as possible so that we can rectify the situation.

More opportunities from Government of Canada → Parks Canada

Same awarding agency

NAICS: 541690
International
Request for Supply Arrangement - Accessibility Assessment Consultants – Parks Canada – Nationally
Solicitation # 5P047-21-0068
Parks Canada Agency is establishing a national Supply Arrangement (SA) under solicitation 5P047-21-0068 to create a pool of qualified accessibility assessment consultants. This initiative supports the agency's commitment to inclusivity and the mandate of the Accessible Canada Act (2019) to ensure all places are fully accessible by 2040. The SA has no defined end date and will remain valid as long as it is advantageous for the government. Once a minimum of three suppliers are qualified, contracts will be awarded for accessibility assessments across various regions of Canada, with individual contract values typically ranging from 1,000 to 500,000 dollars. Qualified consultants will be required to perform indoor and outdoor audits, incorporating a wide spectrum of user needs. Deliverables include written reports with annotated photographs, data spreadsheets with recommendations, and final presentations to site teams. The selection process is based on a minimum point rating of 70, with mandatory pass/fail criteria regarding cover letters and organizational experience. Rated factors include the project manager's experience, the firm's audit project history, and the proposed methodology. Future task solicitations under this arrangement will be categorized into four tiers based on value, ranging from under 10,000 dollars to over 100,000 dollars. Submissions must be sent exclusively via email to [email hidden] as attachments, with a maximum file size of 15 megabytes per email. Bids submitted via fax, courier, or in-person will not be accepted. Project managers must demonstrate at least three years of accessibility assessment experience. While the arrangement covers most national sites, specific procurements within CLCA areas in Yukon, Northwest Territories, Nunavut, Quebec, or Labrador must be handled separately. There are no security requirements for this arrangement, though suppliers must comply with integrity provisions and the Federal Contractors Program for Employment Equity.
Other Scientific and Technical Consulting Services

POSTED

about 2 months ago

DEADLINE

in about 73 years
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS