Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Minnesota was posted on April 4, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Carlos Avery WMA Pool 1 WCS Replacement

Closed
9066574State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
International
Provision of Structural Repairs and Planned Maintenance to Blackpool Tower Winter 2026/7 and Summer 2027
Solicitation # ocds-h6vhtk-078f6c
Blackpool Borough Council is seeking a qualified Remedial Works Supplier to perform structural repairs and planned maintenance for the Blackpool Tower. The project is divided into three primary phases: the Winter Works 2026/27 package occurring during operational closure from November 2026 to March 2027, the Summer Works 2027 package during the operating season from April 2027 to November 2027, and subsequent ad-hoc maintenance based on annual inspections beyond November 2027. The estimated total value of the contract is 4,000,000 GBP including VAT, with a potential option to extend for one year into 2028. The contract is an open competition particularly suitable for small and medium-sized enterprises, with an award based on a 10% weighting for social value. Mandatory requirements for bidders include professional indemnity insurance of 5 million GBP and employer's and public liability insurance of 10 million GBP each. Technical qualifications are strictly enforced, requiring IRATA level 3 supervisors, IRATA level 1 or 2 technicians, and project managers who are Chartered Members of the Institution of Civil Engineers or the Institution of Structural Engineers. All work must comply with BS EN 1090 Execution Class 3, the Construction Design and Management Regulations 2015, and UK GDPR. Tenders must be submitted electronically by November 13, 2026.
Blackpool Borough Council

POSTED

2 days ago

DEADLINE

in 19 days

AI Contract Overview

Show more

This contract pertains to the replacement of a water control structure at Carlos Avery Wildlife Management Area (WMA) Pool 1, identified as State Project No. 2024-693-8W159. It emphasizes a preference for bids from targeted groups, including economically disadvantaged individuals and veteran-owned businesses. The project will be executed under a single prime contract and involves several key tasks: removing and disposing of the existing water control structure, installing a new precast concrete control structure, performing sheet piling and miscellaneous metal work, and implementing erosion control measures along with turf establishment to restore the site. The scope of work is guided by plans and specifications developed by the Minnesota Department of Natural Resources. The solicitation was posted on April 4, 2024, with a response deadline of April 25, 2024. The project falls under the NAICS code 238120, which relates to structural steel and precast concrete contractors. The contracting agency is the Minnesota Department of Administration, with the primary contact being Thomas Reich, who can be reached via email or phone for further details. The project is located within Minnesota, and interested parties can access additional information through the provided online link. The contract aims to ensure the successful completion of water control infrastructure improvements while prioritizing opportunities for disadvantaged and veteran-owned businesses.

General Info

Agency

Minnesota Department of Administration

Place of Performance

MN, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMinnesota Department of Administration
Contacts1 person available
OfficeN/A
Organization / Agency
Minnesota Department of Administration
Office AddressN/A

Full Description

Show more
State Project No. 2024-693-8W159 This Project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference. A. The work will be completed under one prime contract. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Remove and dispose of existing water control structure. 2. Furnish and install precast concrete control structure. 3. Sheet piling and misc. metal work. 4. Erosion control and turf establishment. Plans and Specifications were prepared by the Minnesota Department of Natural Resources, Contact: Thomas Reich, email: thomas.reich@state.mn.us, Telephone: (651) 259-5794.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS