Carmel Woods and Pescadero Road Sewer Main Rehabilitation Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Carmel Woods and Pescadero Road Sewer Main Rehabilitation Project, managed by the Carmel Area Wastewater District, involves the replacement and rehabilitation of critical sewer infrastructure across two residential sites in unincorporated Monterey County and the City of Carmel-by-the-Sea. The project is designed to ensure reliable wastewater service and minimize future sewer spills by addressing deteriorated 6-inch diameter vitrified clay pipe gravity sewer mains. The scope includes the rehabilitation or replacement of approximately 14,850 linear feet of sewer main using polyvinyl chloride or high-density polyethylene materials or the installation of lining systems. While most work follows existing alignments, some segments will be realigned to improve maintenance access. The project is divided into two primary components: the Carmel Woods site, located along Camino Del Monte, San Juan Road, and San Marcos Road, and the Pescadero Road site, which spans Pescadero Road, Lincoln Street, 2nd Avenue, and Monte Verde Street. At the Pescadero Road site, a new sewer main will be constructed, and a portion of the existing hillside main will be abandoned and filled with cellular concrete or one-sack slurry. Environmental compliance has been managed under the California Environmental Quality Act, with a Final Initial Study and Mitigated Negative Declaration concluding that the project will not have significant environmental effects. Key project personnel include Principal Engineer Jeff Bandy and Project Manager Erin Harwayne.

General Info

Carmel Area Wastewater District rehabilitating 14,850 feet of sewer mains in Monterey County.

Place of Performance

Pescadero Road, Lincoln Street, 2nd Avenue, and Monte Verde Street, Camino Del Monte, San Juan, Carmel-by-the-Sea, CA, 93921-23

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Carmel Area Wastewater District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Jeff BandyPrincipal Engineer

Interested Companies (1)

Denise Duffy and AssociatesMonterey, CA

Full Description

Show more
Replacement and/or rehabilitation of approximately 14,850 LF of existing deteriorated 6-inch diameter vitrified clay pipe gravity sewer main with new polyvinyl chloride or high-density polyethylene sewer mains or installation of a lining system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and significant upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project is estimated at 16,690,000 dollars and is designed by Willis Engineers, who will serve as the owner's representative for the City of Belmont. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and the experience of proposed subcontractors. Bidders must comply with specific socioeconomic requirements, including the submission of MWBE Good Faith Efforts documentation, and the winning contractor is required to self-perform at least 50 percent of the total original contract amount. Key contractual obligations include providing performance and payment bonds, maintaining insurance with an A.M. Best rating of A-VII or better, and adhering to strict technical standards such as AWS and ASME welding qualifications and OSHA fall protection. Payment will be processed in equal monthly amounts using the EJCDC C-620 application for payment.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. is soliciting bids for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project involves various construction and supply scopes, including paving, electrical work, aggregate supply, and pipe supply. The solicitation is set aside for SBA certified Women-Owned Small Businesses and encourages Disadvantaged Business Enterprise participation. Bids must be submitted via email or fax by the deadline, with conflicting dates listed as October 28, 2026, and December 3, 2026. All submitted quotes must remain valid for 120 days from the bid due date. Qualified subcontractors and suppliers must possess a valid California contractor license and be registered with the California Department of Industrial Relations in accordance with Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement and requires compliance with specific insurance requirements. Flatiron Dragados reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with actual bond premium costs reimbursable up to 3 percent. All bonds must be issued by a surety authorized to operate within the State of California.
Flatiron Dragados Constructors, Inc.

POSTED

about 5 hours ago

DEADLINE

in 26 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS