Carmel Woods and Pescadero Road Sewer Main Rehabilitation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Carmel Woods and Pescadero Road Sewer Main Rehabilitation Project, managed by the Carmel Area Wastewater District, involves the replacement and rehabilitation of critical sewer infrastructure across two residential sites in unincorporated Monterey County and the City of Carmel-by-the-Sea. The project is designed to ensure reliable wastewater service and minimize future sewer spills by addressing deteriorated 6-inch diameter vitrified clay pipe gravity sewer mains. The scope includes the rehabilitation or replacement of approximately 14,850 linear feet of sewer main using polyvinyl chloride or high-density polyethylene materials or the installation of lining systems. While most work follows existing alignments, some segments will be realigned to improve maintenance access. The project is divided into two primary components: the Carmel Woods site, located along Camino Del Monte, San Juan Road, and San Marcos Road, and the Pescadero Road site, which spans Pescadero Road, Lincoln Street, 2nd Avenue, and Monte Verde Street. At the Pescadero Road site, a new sewer main will be constructed, and a portion of the existing hillside main will be abandoned and filled with cellular concrete or one-sack slurry. Environmental compliance has been managed under the California Environmental Quality Act, with a Final Initial Study and Mitigated Negative Declaration concluding that the project will not have significant environmental effects. Key project personnel include Principal Engineer Jeff Bandy and Project Manager Erin Harwayne.

General Info

Carmel Area Wastewater District rehabilitating 14,850 feet of sewer mains in Monterey County.

Agency

California → Carmel Area Wastewater District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Pescadero Road, Lincoln Street, 2nd Avenue, and Monte Verde Street, Camino Del Monte, San Juan, Carmel-by-the-Sea, CA, 93921-23

Set-Aside

NONE

Documents

(7)

NOI Carmel Woods Pescadero Road Sewer Main Rehabilitation Project

PDFnotice-of-availability

Carmel Woods Pescadero Rd Sewer Main Rehab Project Summary

PDFenvironmental-summary

Carmel Woods and Pescadero Rd Sewer Main Rehab Project - Notice of Completion Supplemental Pages

PDFother

Carmel Woods and Pescadero Road Sewer Main Rehabilitation Project Notice of Completion

PDFnotice-of-completion

Final IS/MND for Carmel Woods and Pescadero Road Sewer Main Rehabilitation Project

PDFenvironmental-assessment

Notice of Determination - Carmel Woods and Pescadero Rd Sewer Rehab

PDFnotice-of-determination

Draft Initial Study/Mitigated Negative Declaration for Carmel Woods and Pescadero Road Sewer Main Rehabilitation Project June 2026

PDFenvironmental-assessment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Carmel Area Wastewater District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Carmel Area Wastewater District
Office AddressN/A
Contacts
Jeff BandyPrincipal Engineer
Erin HarwayneSenior Planner/Project Manager

Interested Companies (1)

Show more
Denise Duffy and Associates
Monterey, CA

Full Description

Show more
The Carmel Woods and Pescadero Road Sewer Main Rehabilitation Project (Project) is located on two sites in a residential area located primarily within unincorporated Monterey County, with a small portion of the Project occurring within the northern limits of the City of Carmel-by-the-Sea. The Pescadero Road component of the Project would consist of constructing a new sewer main in Pescadero Road and abandoning a portion of the existing sewer main in the hillside located behind nearby residential connections. The Carmel Woods component of the Project consists of the replacement and/or rehabilitation of approximately 14,850 LF of existing deteriorated 6-inch diameter vitrified clay pipe gravity sewer main with new polyvinyl chloride or high-density polyethylene sewer mains or installation of a lining system. The majority of the sewer mains would be replaced and/or rehabilitated along the existing alignments where feasible. However, several sewer segments would be realigned to improve ease of maintenance. Replacing and rehabilitating the damaged sewer mains at the Pescadero Road and Carmel Woods sites is necessary to continue to provide reliable service to the District’s customers and minimize the potential for sewer spills in the future. The rehabilitated sewer main would continue to be used to convey wastewater for District customers located along Pescadero Road, whose service laterals directly connect to the sewer main to be replaced, while the majority of existing flows to this sewer main would be redirected to the new sewer main.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Federal
Z2NZ-- 658-23-108 Correct Stormwater Drainage
Solicitation # 36C24626B0031
Solicitation 36C24626B0031 is an Invitation for Bids (IFB) issued by the Department of Veterans Affairs Network Contracting Office 6 for Project 658-23-108, which involves correcting stormwater drainage at the Salem VA Medical Center in Salem, Virginia. The project is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with an estimated construction magnitude between $10,000,000 and $20,000,000. The scope of work includes providing all labor, materials, and equipment for general construction and utility work, specifically the installation of a dewatering system to control ground surface water during excavation. The performance period is 450 calendar days from the issuance of the Notice to Proceed. The contract will be awarded based on FAR Part 14 Sealed Bidding procedures, typically to the lowest responsive and responsible bidder. Eligible SDVOSB bidders must be registered in the System for Award Management (SAM) and are required to perform at least 25% of the construction work. Key requirements include a bid guarantee of at least 20% of the bid price (capped at $3,000,000), adherence to Davis-Bacon wage determinations, and the ability to demonstrate the completion of three similar projects within the last three years. The final bid submission deadline was extended to October 20, 2026, with a public bid opening on October 21, 2026.
246-NETWORK Contracting Office 6 (36C246)

POSTED

about 1 hour ago

DEADLINE

in 28 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 9 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS