Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Carnegie State Vehicular Recreation Area Resource Management Area Program

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Carnegie State Vehicular Recreation Area Resource Management Area Program is a long-term environmental and land management initiative led by the California Department of Parks and Recreation to sustainably manage off-highway vehicle recreation while addressing soil erosion and stormwater runoff impacts on hillside trails. Over a ten-year period, the program will establish one to three Resource Management Areas annually, focusing on reducing trail density, increasing native vegetation cover, rehabilitating degraded soils, enforcing trails-only riding, and implementing wildlife-safe erosion control measures. The project adheres strictly to the Soil Conservation Standard and complies with state environmental regulations including the California Environmental Quality Act (CEQA), the California Endangered Species Act, and the Fish and Game Code, particularly sections related to streambed alterations and protection of special-status species. Key biological mitigation requirements include pre-construction surveys for species such as Crotch’s bumble bee, San Joaquin kit fox, and California tiger salamander, with mandatory reporting to the California Natural Diversity Database and adherence to seasonal restrictions to protect nesting and breeding cycles. The use of synthetic monofilament netting is prohibited due to wildlife entanglement risks, and only approved wildlife-safe alternatives may be used for erosion control. All project activities occur within the Carnegie SVRA in Alameda and San Joaquin Counties, near Tesla and Corral Hollow Roads, with the primary performance site identified by zip code 94550. The program is administered through a state-led environmental compliance process rather than a conventional federal procurement framework, with no formal FAR clauses, contract pricing data, or acquisition-specific evaluation factors included. Payment of environmental review fees is handled through the State Clearinghouse, with accepted methods including check, cash, or credit, though no contract value, CLINs, or invoicing systems like WAWF are specified. The California Department of Fish and Wildlife serves as the regulatory authority responsible for inspection and acceptance of mitigation measures, ensuring compliance with species protection protocols and habitat conservation standards. The project timeline includes an implementation period starting January 23, 2026, with environmental documents due by March 10, 2026, and public comments accepted via email or mail to designated administrative contacts. No procurement-related representations, socioeconomic certifications, or unique entity identifiers are applicable, as this is a state agency-led conservation effort, not a competitive contract award to commercial entities.

General Info

Long-term OHV recreation management in Carnegie SVRA with生态保护, trail rehabilitation, and strict compliance with California environmental laws.

Agency

California Parks and Recreation, Department of

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Tesla Road, Corral Hollow Road, CA, 94550

Set-Aside

NONE

Documents

(7)

Notice of Determination for Carnegie SVRA RMA Program 2026

PDFnotice-of-determination

Notice of Availability of Draft Environmental Impact Report for Carnegie SVRA RMA Program

PDFnotice-of-availability

Carnegie SVRA RMA Draft EIR_2026 January

PDF

NOC Carnegie SVRA RMA_DEIR_20260123

PDFnotice-of-completion

Carnegie SVRA Resource Management Area Program DEIR Summary

PDFenvironmental-impact-summary

Receipt Signed for Environmental Document Filing Fee 2023020424

PDFreceipt

2023020424_CDFW Comment on Carnegie SVRA Draft EIR

PDFcomment-letter

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Amendment 1

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Clint ElsholzDistrict Superintendent

Interested Companies (1)

Show more
MIG
Denver, CO

Full Description

Show more
Carnegie SVRA uses existing RMAs to actively manage the hillside riding area road and trail system to meet the Soil Conservation Standard and stormwater runoff regulatory requirements. The project establishes new RMAs in hillside riding areas and undertakes new specialized maintenance projects within RMAs to manage soil erosion and stormwater runoff water quality. The new activities will provide ongoing sustainable OHV recreation by reducing trail density, increasing vegetation cover, creating sustainable trails, enforcing trails-only riding, rehabilitating damaged soil surfaces, and implementing soil loss and erosion control measures that disperse stormwater runoff. The project is separate from and not associated with implementing the 2024 General Plan Update.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
Environmental & Archaeological AssessmentThe contract encompasses a comprehensive environmental and archaeological assessment to support permitting under the National Environmental Policy Act and Section 106 of the National Historic Preservation Act. It requires the performance of a Phase I Environmental Site Assessment to identify potential contamination, a wetland delineation to determine the extent and boundaries of wetland areas, and archaeological surveys to evaluate the presence of culturally significant resources. These activities are essential for documenting environmental and historical conditions prior to any proposed development or infrastructure projects in Dawson County, Georgia. The work must be conducted in accordance with federal regulatory standards to ensure compliance and facilitate the permitting process. This is a subcontract opportunity posted by the Development Authority of Dawson County, with a response deadline of September 7, 2026. The North American Industry Classification System code 541620 indicates the work falls under environmental consulting services. The performance location is within Georgia, though specific site details are not provided. Interested parties must submit proposals by the stated deadline to be considered, and all activities are intended to support regulatory compliance and due diligence for future development initiatives in the region.
Development Authority of Dawson County

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
SLED
Environmental Compliance and MonitoringThe contract involves comprehensive environmental compliance and monitoring services focused on stormwater management, erosion control oversight, and regulatory reporting throughout the construction phase. The work is tied to a project under the Haralson County School District in Georgia and requires adherence to established environmental regulations, ensuring that construction activities do not negatively impact surrounding ecosystems or water resources. The contractor will be responsible for implementing and maintaining effective erosion and sediment control measures, conducting regular site inspections, documenting compliance efforts, and submitting required reports to regulatory authorities as needed. This subcontract is categorized under NAICS code 541620, which corresponds to environmental consulting services, indicating a professional scope centered on technical environmental management rather than physical construction. The solicitation was posted on August 7, 2026, with a response deadline set for September 9, 2026, providing interested parties a limited window to submit proposals. Performance is expected to occur in Georgia under the jurisdiction of the Haralson County School District, though specific site locations are not detailed in the provided data. The contract emphasizes continuous regulatory alignment and accurate documentation, making it critical that the selected vendor has demonstrated expertise in environmental monitoring and compliance reporting within construction environments.
Haralson County School District

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
PACP and MACP Pipeline Condition AssessmentThis contract requires the standardized coding and reporting of pipeline and manhole defects in accordance with NASSCO’s Pipeline Assessment Certification Program (PACP) and Manhole Assessment Certification Program (MACP) protocols. All condition assessments must follow these industry-recognized guidelines to ensure accurate, consistent, and defensible data collection for infrastructure evaluation and maintenance planning. The work is part of a larger infrastructure project under SAK Construction, LLC, and performance is expected to adhere to strict quality control measures aligned with national best practices for utility asset management. The solicitation is designated as a subcontract under the Small Business Administration’s set-aside programs, with eligibility limited to Small Business, Small Disadvantaged Business, Women-Owned Small Business, Veteran-Owned Small Business, Alaskan Native Corporations, Indian Tribes, and Disadvantaged Business Enterprises certified under the Department of Transportation’s DBE program. The NAICS code 541620 categorizes this as an engineering services contract, confirming the technical nature of the condition assessment work. The response deadline is September 10, 2026, and the performance location is tied to the SARP10 Humphreys Blvd CIPP project in Memphis, Tennessee, though specific site details are not fully defined in the provided data.
SAK Construction, LLC

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
SLED
Quality Assurance and Compliance Testing (Environmental/Chemical)The contract requires third-party testing and verification of brine salt to ensure full compliance with TxDOT CAT 8C-B specifications, focusing on critical parameters such as concentration, purity, and corrosion characteristics. This work is essential for confirming that the brine salt meets the stringent environmental and chemical standards mandated by the Texas Department of Transportation for use in transportation infrastructure applications. The testing must be conducted by qualified external laboratories with proven expertise in chemical analysis and environmental compliance to guarantee accurate, reproducible results aligned with state requirements. The solicitation is classified as a subcontract under NAICS code 541620, indicating it involves scientific and technical testing services. It is posted under the Texas SmartBuy portal with a response deadline of September 1, 2026, allowing potential bidders sufficient time to prepare detailed proposals demonstrating their technical capability, equipment certification, and experience with similar transportation-related materials testing. The place of performance and point of contact details are unspecified, but all work must align with Texas Department of Transportation's operational and regulatory expectations, ensuring the brine salt used in state projects remains safe, effective, and environmentally compliant.
Texas Department of Transportation

POSTED

about 20 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541620
New
SLED
Erosion Control and Stormwater ManagementThe contract pertains to erosion control and stormwater management activities required during and after construction projects under the jurisdiction of the Texas Department of Transportation. It encompasses the installation and maintenance of best management practices such as silt fences, sediment basins, inlet protection structures, and related measures designed to prevent sediment runoff and protect water quality. The work must be performed in accordance with state and federal environmental regulations to mitigate the impact of construction on surrounding ecosystems and waterways. All activities are to be completed within the designated project areas, with strict adherence to timelines and performance standards. The contract is classified as a subcontract and is open for bids with a response deadline of September 2, 2026. It falls under the NAICS code 541620, indicating it involves environmental consulting and related services. The solicitation was posted on August 7, 2026, and is accessible through the Texas SmartBuy portal. While specific performance locations and contact details are not provided, the work is expected to occur across various Texas transportation construction sites. Contractors must demonstrate experience in implementing erosion and sediment control systems and be prepared to provide documentation and inspections to verify compliance with established environmental protocols.
Texas Department of Transportation

POSTED

about 20 hours ago

DEADLINE

in 25 days
View Details