Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on June 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Carpenter Creek Bridge - Watermain Replacement Project

Closed
BC229792International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
1947 Watermain - North Bound Airport Expressway PreservationThe Port of Seattle’s Aviation Project Management Group is forecasting the restoration of a 1947 water main located along the north bound Airport Expressway using cured-in-place pipe (CIPP) technology under a Design-Bid-Build delivery method. This project aims to preserve the integrity of the aging infrastructure by rehabilitating the existing pipe without excavation, leveraging the durability and efficiency of CIPP to extend service life and minimize disruption to surrounding areas. The work scope is focused on a critical transportation corridor, requiring careful planning to maintain public safety and operational continuity during execution. Solicitation details are managed under NAICS code 237110 for water and sewer line and related structures construction, and the project is being coordinated through the Port of Seattle with Moraa Omwega as the primary point of contact and Ray Moreno serving as Project Manager. The forecast notice was posted in July 2026, signaling preparation for future procurement, though no formal solicitation number has been issued yet. The place of performance is not geographically defined in the posting, but the location is understood to be within the Airport Expressway corridor near the port’s aviation facilities. All future bidding, design submissions, and construction activities will be directed through the Port of Seattle’s official procurement portal.
Aviation Project Management Group

POSTED

about 8 hours ago

DEADLINE

N/A
NAICS: 237110
New
SLED
Bid 2026-09 Primary Sewer Lift Station #2The City of Carlsbad is soliciting sealed bids for the construction of Primary Lift Station No. 2, with submissions due by 2:00 p.m. local time on Thursday, August 27, 2026, at the city’s purchasing office. The project involves building a new triplex submersible pump lift station measuring approximately 17.5 feet long by 15.2 feet wide by 44 feet deep, along with an integrated valve vault, new electrical systems and control equipment, and a renovation of an interior room within the existing electrical building to house the controls. Additionally, the scope includes a wastewater flow splitter vault to enable flow diversion between lift stations, approximately 156 linear feet of 30-inch sewer pipe, two new manholes, and about 60 linear feet of new ductile iron force main with all necessary appurtenances. Bidders must attend a mandatory pre-bid meeting on Wednesday, August 5, 2026, at 11:00 a.m. at 304 E. Plaza St., Carlsbad, NM. Bidding documents are accessible online at soudermiller.com at no cost, and bidders are required to regularly check the site for addenda and updates. Resident Contractor and Resident Veteran Contractor preferences are applicable under New Mexico state law. All bids must be submitted to Matthew Fletcher at 101 North Halagueno Street, Room #204, Carlsbad, NM 88220, and will be publicly opened at the same location upon the deadline.
Purchasing

POSTED

about 16 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
SLED
Wheatland Regional Sewer Pipeline ProjectThe Wheatland Regional Sewer Pipeline Project involves the complete construction and commissioning of a 7.7-mile sewer pipeline along with two new pump stations, horizontal directional drilling, demolition and replacement of an existing pump station, electrical control systems, culvert replacement, site restoration, and all necessary start-up and testing activities to ensure full operational functionality. The scope encompasses the furnishing of all labor, materials, equipment, taxes, and incidental services required to execute the project in full compliance with the Contract Documents prepared by DCCM and Nexgen Utility Management. This includes any additional work deemed necessary to deliver a fully compliant and operational system as specified in the technical volumes. The estimated cost is divided into two primary components: $19 million for the pipeline construction and $33 million for the pump stations, totaling a projected investment of $52 million. The solicitation, identified as CWSRF Project No C-06-8753-110, was posted on July 17, 2026, with responses due by August 18, 2026. The project is administered by the City of Wheatland in California under a state, local, or educational (SLED) agency classification, with Dane Schilling serving as the primary point of contact for inquiries. All work must be performed at the designated place of performance within California, and contractors are expected to adhere to all contractual requirements outlined in the six-volume bid package to meet project standards and timelines.
City of Wheatland

POSTED

3 days ago

DEADLINE

in 29 days
NAICS: 237110
New
SLED
NOTICE is hereby given that the City of Meridian, Mississippi (the City) is soliciting Statements of Qualifications (SOQs) from qualified firms to provide a comprehensive Advanced Metering Infrastructure (AMI) System and associated long-term operationThe City of Meridian, Mississippi is seeking qualified firms to submit Statements of Qualifications for the design, implementation, and long-term operation of a comprehensive Advanced Metering Infrastructure system. This solicitation aims to enhance water or utility metering capabilities through modern technology that enables automated data collection, real-time monitoring, and improved operational efficiency. Interested parties must demonstrate relevant experience, technical expertise, and the capacity to deliver a scalable, secure, and sustainable AMI solution that meets the city’s long-term operational needs. Respondents are required to submit their qualifications by the deadline of August 26, 2026, with the solicitation officially posted on July 17, 2026 under reference number 15-20260623154237 Meridian. The project falls under the jurisdiction of the Mississippi Public Service Commission’s MPTAP office and is open to firms without specific set-aside restrictions. All work must be performed within the state of Mississippi, and proposers should ensure their submissions align with the city’s infrastructure goals and compliance standards. Further details and submission guidelines can be accessed through the official Mississippi government portal.
MPTAP

POSTED

3 days ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Corporation of the Village of New Denver is soliciting bids for the replacement of a 200 mm ductile iron watermain beneath the Carpenter Creek Bridge, which currently relies on hanger supports attached to the bridge’s underside. The project involves the complete removal and installation of a new watermain to ensure reliable water infrastructure, with all work focused on the bridge crossing area. This is a federal-level procurement under NAICS code 237110 for water infrastructure construction, and response submissions are due by June 25, 2026, with the solicitation posted on June 1, 2026. The contracting authority is Jessica Rayner, reachable via planning@newdenver.ca, and the work must be performed at the Carpenter Creek Bridge location without specification of a broader municipal or regional context beyond the immediate construction site.

General Info

Replace 200 mm watermain beneath Carpenter Creek Bridge, managed by Village of New Denver, federal contract.

Agency

Government of Canada → Corporation of the Village of New DenverView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Corporation of the Village of New Denver
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Corporation of the Village of New Denver
View Agency Profile
Office AddressN/A
Contacts
Jessica RaynerContracting Authority

Full Description

Show more
Construction of 200 mm Ductile Iron (D.I) watermain replacement of the existing Carpenter Creek Bridge watermain crossing. Works include replacement of the existing watermain currently supported via hanger support attached to the underside of Carpenter Creek Bridge.