Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on February 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Carty Road Multi-Purpose Trail, Phase I

Closed
P25003State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The Carty Road Multi-Purpose Trail, Phase I project involves upgrading Carty Road, a currently narrow two-lane rural collector, to enhance safety and accessibility for local families. The project aims to construct a scenic two-lane road with a multi-modal pathway on the south side, providing a safe, ADA-accessible route for pedestrians and bicyclists traveling to schools and the Ridgefield Outdoor Recreation Complex. A roundabout will be installed at the unsignalized intersection with Hillhurst Road, which currently only has stop control on Carty Road, to improve traffic flow and safety. The pedestrian crossing design will allow for compatibility with future improvements in the area. This project is funded through the Carbon Reduction Program Urban Small (CRP-US) grant, with solicitation number P25003 issued by the Washington Public Works agency. The contract was posted on February 27, 2026, and responses are due by March 26, 2026. The project management team includes Kristin Ashenfelter, Project Manager, and Melissa Irwin, Procurement Coordinator, both based in Ridgefield, WA. The solicitation and additional project details can be accessed through the city’s procurement portal.

General Info

Upgrade Carty Road with two-lane road, ADA pathway, roundabout; funded by CRP-US grant.

Place of Performance

WA, USA

Set-Aside

other

Documents

6
PDF, High priority: read this first2 pages · form
High
PDF, High priority: read this first1 page · dbe-written-confirmation
High
PDF, High priority: read this first2 pages · form
High
PDF, High priority: read this first35 pages · contract-document
High
PDF, High priority: read this first15 pages · rfq
High
PDF, Low priority3 pages · other
Low

Read all 6 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 3 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 7 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Public Works
Contacts2 people available
OfficeRidgefield, WA, 98642, USA

Interested Companies (29)

AKS Engineering & ForestryTualatin, OR
Century West EngineeringLake Oswego, OR
Consor North AmericaLouisville, Colorado

See All 29 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Carty Road is currently a two-lane rural Major Collector with narrow shoulders and no defined pedestrian facilities. The intersection at Hillhurst Road is unsignalized, with stop control only on Carty Road. Families living along Carty Road lack a safe walking route to nearby schools and the Ridgefield Outdoor Recreation Complex. This project seeks to address these safety and connectivity concerns by establishing a safe, ADA-accessible, multi-modal connection. Carty Road is planned as a scenic collector with two travel lanes and a multi-modal pathway along the south side of the corridor. A roundabout is planned at the intersection of Carty and Hillhurst. The pedestrian crossing will need to be designed to be compatible with future improvements. This project is funded under the Carbon Reduction Program Urban Small (CRP-US) grant program funds.

More opportunities from Washington → Public Works

Same awarding agency

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS