Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

CARY-HAAS PEDESTRIAN BRIDGE REPLACEMENT PROJECT; No. 2024.1010

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Cary-Haas Pedestrian Bridge Replacement Project involves the replacement of a pedestrian bridge over San Leandro Creek in San Leandro, California, following severe damage from a storm in March 2023 and its subsequent demolition in August 2024. This minor alteration to an existing public trail structure is designed to restore pedestrian connectivity between Cary Avenue and Haas Avenue without expanding the original footprint or use, qualifying for a Class 1 categorical exemption under CEQA Section 15301. The project site spans approximately one acre and requires strict adherence to environmental regulations, including coordination with state and federal agencies to protect aquatic resources and compliance with floodplain management standards under the National Flood Insurance Program, with a base flood elevation of 53.3 ft NAVD 1988 and a required freeboard of 15 feet, resulting in a truss bottom chord elevation of 68.3 ft NAVD 1988. A FEMA Elevation Certificate must be submitted upon completion to verify compliance. The City of San Leandro’s Public Works Department is the contracting agency, with Diana Garcia as the primary point of contact and Kyle Turner serving as a professional engineer involved in the project. The contract does not specify a formal contract type, estimated value, or line-item pricing, and no CLIN or SLIN data is provided. There is no defined period of performance, though construction windows must avoid bird nesting season from January 15 to September 15. Delivery and inspection occur on-site at the bridge location in San Leandro, with the contractor responsible for structural design and submission of engineering calculations, while the city oversees final inspection and documentation. Submission requirements include five physical copies mailed to the city’s engineering division, with no electronic submission method specified. The project is not governed by federal acquisition regulations in terms of contract clauses, evaluation factors, representations, or socioeconomic set-asides, as it is a local government initiative relying on state environmental compliance and municipal oversight rather than federal procurement rules.

General Info

Replace damaged pedestrian bridge over San Leandro Creek, comply with flood and environmental regulations, maintain original footprint.

Agency

California → City of San Leandro

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Cary Drive and Haas Ave, San Leandro, CA, 94577

Set-Aside

NONE

Documents

(7)

Memo SCH #2025081325 Cary-Haas Pedestrian Bridge Replacement Withdrawal

PDFmemorandum

State Clearing House Modification Request to Withdraw NOE Posting for Cary-Haas Pedestrian Bridge Replacement Project

PDFmodification

Notice of Exemption for Cary-Haas Pedestrian Bridge Replacement Project

PDFnotice-of-exemption

_RE_ 2025081325 - Cary Haas Pedestrian Bridge Project 2024

ZIP

NOE - Cary-Haas Pedestrian Bridge Replacement Project

PDFnotice-of-exemption

Cary-Haas Pedestrian Bridge Project CEQA CatEx Technical Memorandum

PDFtechnical-memorandum

Memorandum for SCH #2025081325 Cary-Haas Pedestrian Bridge Replacement Project

PDFmemorandum

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Leandro
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of San Leandro
Office AddressN/A
Contacts
Diana GarciaAssistant Engineer
Kyle turnerProffessional Engineer, VP

Full Description

Show more
The Project includes the minor alteration of a public structure ( Pedestrian Trail) involving negligible or no expansion of existing or former use; specifically, the project consists of the replacement of the pedestrian bridge over the San Leandro Creek, Severe damage occurred to the pedestrian bridge during a major storm even in March 2023 and the bridge was demolished in August 2024. The beneficiaries of the project would be the trail users within the local community.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
David C. McCollom WTP Membrane Basin Rehabilitation
Solicitation # david-c-mccollom-wtp-membrane-basin-rehabilitation
Kiewit Infrastructure West Co. is soliciting quotes for the David C. McCollom WTP Membrane Basin Rehabilitation project located in California. The scope of work includes a variety of services such as demolition, concrete rehabilitation, metals, painting and coating, mechanical insulation and testing, adjusting and balancing, and dumpster or trash services. Interested firms must contact Kiewit to receive an official Invitation to Bid through the Building Connected system. This solicitation includes set-asides for various small business categories, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone Small Businesses, Veteran-Owned Small Businesses, and Disadvantaged Business Enterprises. To be considered a responsive bidder, firms must hold a valid California Contractor’s license appropriate to their trade and provide acceptable insurance coverage. Responsible subcontractors and material contractors are required to provide bonding for 100% of their contract value, though Kiewit will reimburse the bond premiums. Additionally, Kiewit is a signatory to several collective bargaining agreements involving carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters. The deadline for responses is September 1, 2026, and further inquiries regarding project specifics, scheduling, or materials should be directed to the Lead Estimator.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details