Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on February 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Castle Mobile Estates Culvert Rehabilitation Project

Closed
P25922State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open-cut installation of PVC and DIP sewer lines ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, a CSO regulator fit out, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional project deliverables include the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass for all pipes and manholes during construction. General project requirements include clearing and grubbing of wooded areas, seeding, fine grading, and select tree removal. Due to the project location and nature, contractors must provide railroad insurance. The bid schedule further accounts for extra depth excavation and the abandonment of existing pipes and manholes. All inquiries and quotations should be directed to John Connelly at Cleary Construction.
Cleary Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the construction of a new wet well and valve vault, the demolition of existing pumps and piping, and the delivery of a fully operating facility equipped with mechanical and electrical systems, a generator, odor control equipment, and stormwater facilities. The project also requires associated site work, including exploratory drilling, rock excavation, and grading. The contract is governed by EJCDC standard general and supplementary conditions, with technical specifications spanning divisions 00 through 44. Award will be granted to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and adherence to submission requirements. Bidders must provide a signed bid form, bid security, and mandatory MWBE documentation, including a Good Faith Efforts Form and Table A, to meet participation goals of 10.9 percent for EPA MBE and 10 percent for the State of North Carolina. Contract administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with a 30-day payment term following the engineer's recommendation.
Don Moorhead Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The Castle Mobile Estates Culvert Rehabilitation Project in Santa Cruz County involves the repair and rehabilitation of approximately 995 linear feet of a large corrugated metal arch culvert pipe measuring 72 inches by 44 inches. The scope of work includes applying a grout liner inside the pipe and using polyurethane compaction grout to stabilize voids around the pipe’s exterior. The project must be completed within 100 working days with an estimated cost of about $1,062,000. The work is governed by detailed technical specifications and standards, including state and county design criteria as well as specialized provisions related to water pollution control, traffic management, and construction site safety. Substantial emphasis is placed on quality control through comprehensive inspection procedures such as CCTV recordings and strict compliance with ASTM and corrosion protection standards. The procurement is managed by the Santa Cruz County Flood Control and Water Conservation District Zone 5 under solicitation number P25922 with a bid deadline of March 26, 2026. Bidders must comply with licensing, insurance, bonding, and certification requirements, including having personnel with specialized training in polyurethane compaction grouting. The contract prescribes a fixed-price construction arrangement and requires submission of various administrative and compliance documents via an electronic procurement portal. Evaluation of bids is primarily pass/fail focused on compliance, with award based on the lowest responsive bid. The contractor must meet prevailing wage laws, provide detailed documentation, and perform at least 30% of the work with their own forces. The project includes stringent administrative controls, certification of training and experience for key personnel, and mandates submission of as-built plans upon completion. Contract administration, inspection, and acceptance are overseen by the District Engineer, supported by careful documentation and certification procedures to ensure project compliance and quality.

General Info

Repair 995 ft culvert in Santa Cruz; grout lining, 100 days, $1.06M budget, compliance mandatory.

Documents

4

Castle Mobile Estates Culvert Rehabilitation Project Bid Book

PDF, High priority: read this firstbid-book
High

Castle Mobile Estates Culvert Rehabilitation Project Special Provisions Book 2

PDF, High priority: read this firstspecifications
High

Castle Mobile Estates Culvert Rehabilitation Project Information Handout

PDF, Low priorityother
Low

Castle_Estates_Plan_Set_01.20.2026.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
Contacts2 people available
OfficeSanta Cruz, CA, 95060, USA
Organization / AgencyCalifornia → Public Works
Office AddressSanta Cruz, CA, 95060, USA
Contacts
Rodney TrujilloCivil Engineer
Shauna SoldatePurchasing & Logistics Manager

Interested Companies (5)

Irish ExcavationMorgan Hill, CA
Empire Grading & ExcavationSanta Cruz, CA
John Grilli ConstructionSalinas, CA

See All 5 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The project location in the County of Santa Cruz is as follows: • 1099 38th Avenue Work includes repair and apply grout liner to approximately 995 linear feet of 72-inch by 44-inch corrugated metal arch pipe and polyurethane compaction grout voids around the exterior of the pipe. Complete the work within 100 working days. The estimated cost of the project is $1,062,000

More opportunities from California → Public Works

Same awarding agency

NAICS: 238210
New
SLED
On-Call Industrial Electricians for Regional Water Quality Control Plant
Solicitation # IFB199384
The City of Palo Alto is soliciting bids under IFB199384 for on-call industrial electrical services at the Regional Water Quality Control Plant. The selected contractor will provide personnel, supervision, and technical support for scheduled preventive maintenance, troubleshooting, and 24-hour emergency repairs to ensure the reliable operation of wastewater treatment systems. The contract is established on a non-exclusive, as-needed basis with a total spending ceiling of 2,000,000 dollars over a five-year term, with an annual expenditure limit of 800,000 dollars. Qualified bidders must hold an active California C 10 Electrical Contractor license, maintain current DIR registration, and demonstrate at least five years of industrial electrical experience, including specific experience with continuous process industrial facilities. Personnel requirements are stringent, requiring journey-level training and specific years of experience for both general and lead electricians, with specialized skills needed for systems up to 12kV. The contractor is required to provide performance and payment bonds totaling 100 percent of the contract sum and adhere to the Palo Alto Minimum Wage Ordinance and prevailing wage requirements. Deliverables include next-business-day service reports and final technical records within five business days of each assignment. Bids are due by November 19, 2026, at 3:00 pm.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 14 hours ago

DEADLINE

in 21 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS