Castle Mountain Mine Phase II Expansion Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Castle Mountain Venture is proposing the Phase II Expansion of the Castle Mountain Mine, a project designed to extend the mine’s operational life by approximately 30 years, with 20 years dedicated to mining and processing followed by 10 years of reclamation. The expansion would quadruple the annual mining rate from 18 million tons to 80 million tons, resulting in an additional 296 million tons of ore extracted and 196 million tons of overburden stockpiled, while increasing the crushing rate from 6 million to 19 million tons per year. To support this scaled operation, the project requires 2,250 acre-feet of groundwater annually and up to 25 megawatts of power, necessitating the construction of a 32-mile water pipeline and a 16.5-mile powerline from Walking Box Ranch to the mine site. Walking Box Ranch, a historically registered property managed by the Bureau of Land Management and the University of Nevada, Las Vegas, would be crossed by these utilities, which are planned primarily within existing rights-of-way. The expansion would increase total land disturbance to 3,294 acres, including 1,800 acres outside the previously approved Approved Project Area, affecting BLM-managed land under the California Desert Conservation Area and the Nevada Las Vegas Field Office. A realignment of the existing access road is proposed to avoid crossing 1,000 feet of the Mojave National Preserve, resulting in the disturbance of an additional 5 acres of BLM land, with the National Park Service participating in the environmental review process. The project also includes deepening and expanding open pits beyond 400 feet below the water table, creating a permanent open pit lake, and reducing natural flow at Piute Springs by approximately 8%, impacting a riparian habitat. Operational workforce levels are projected to include up to 500 temporary and 400 permanent employees. Environmental compliance with NEPA, CEQA, CCR, and SMARA frameworks is central to the project, requiring detailed Leak Detection and Monitoring Plans, stormwater management to 20-year/1-hour storm standards, and reclamation success at 80% confidence levels. All inspections and acceptances are the responsibility of the Bureau of Land Management, conducted at operational sites within San Bernardino County, with no formal procurement contract structure, pricing, or federal acquisition clauses identified—indicating this is an environmental and land-use authorization process rather than a traditional federal procurement
General Info
Agency
NAICS
Place of Performance
15 miles soutwest of State Route 164 and Walking Box Ranch Rd, CA, 92364Set-Aside
Timeline
Organization & Contact Information
Interested Companies (1)
Full Description
Similar Contracts
Same NAICS industry code
