Castle Mountain Mine Phase II Expansion Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Castle Mountain Venture is proposing the Phase II Expansion of the Castle Mountain Mine, a project designed to extend the mine’s operational life by approximately 30 years, with 20 years dedicated to mining and processing followed by 10 years of reclamation. The expansion would quadruple the annual mining rate from 18 million tons to 80 million tons, resulting in an additional 296 million tons of ore extracted and 196 million tons of overburden stockpiled, while increasing the crushing rate from 6 million to 19 million tons per year. To support this scaled operation, the project requires 2,250 acre-feet of groundwater annually and up to 25 megawatts of power, necessitating the construction of a 32-mile water pipeline and a 16.5-mile powerline from Walking Box Ranch to the mine site. Walking Box Ranch, a historically registered property managed by the Bureau of Land Management and the University of Nevada, Las Vegas, would be crossed by these utilities, which are planned primarily within existing rights-of-way. The expansion would increase total land disturbance to 3,294 acres, including 1,800 acres outside the previously approved Approved Project Area, affecting BLM-managed land under the California Desert Conservation Area and the Nevada Las Vegas Field Office. A realignment of the existing access road is proposed to avoid crossing 1,000 feet of the Mojave National Preserve, resulting in the disturbance of an additional 5 acres of BLM land, with the National Park Service participating in the environmental review process. The project also includes deepening and expanding open pits beyond 400 feet below the water table, creating a permanent open pit lake, and reducing natural flow at Piute Springs by approximately 8%, impacting a riparian habitat. Operational workforce levels are projected to include up to 500 temporary and 400 permanent employees. Environmental compliance with NEPA, CEQA, CCR, and SMARA frameworks is central to the project, requiring detailed Leak Detection and Monitoring Plans, stormwater management to 20-year/1-hour storm standards, and reclamation success at 80% confidence levels. All inspections and acceptances are the responsibility of the Bureau of Land Management, conducted at operational sites within San Bernardino County, with no formal procurement contract structure, pricing, or federal acquisition clauses identified—indicating this is an environmental and land-use authorization process rather than a traditional federal procurement

General Info

Castle Mountain Mine Phase II expands operations 4.5x, requires new water and power lines, disturbs 3,294 acres, impacts groundwater and springs, and requires BLM oversight.

Agency

California → San Bernardino County

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

15 miles soutwest of State Route 164 and Walking Box Ranch Rd, CA, 92364

Set-Aside

NONE

Documents

(45)

Castle Mountain Mine Phase II Expansion Project CEQA Summary Form

PDFceqa-summary

EIS Appendix B - Referenced Tables for Castle Mountain Mine Project

PDFother

Appendix K POD_EQX-CMM_POD_App G_PL Eng(2025)_OCR

PDF

MRAA-2022-00002 Castle Mountain Mine Phase II Expansion Project CEQA Notice of Completion

PDFceqa-notice-of-completion

Castle Mountain Mine Phase 2 Project Socioeconomic Report

PDFsocioeconomic-report

EIS Appendix H - Legal Land Description

PDFother

EIS Appendix E Legal Descriptions for Castle Mountain Project

PDFlegal-description

Castle Mountain Mine Industrial Storm Water BMP Plan September 2022

PDFsow

Appendix D Right-of-Way Grants - Viceroy Gold Corporation

PDFright-of-way-grant

Castle Mountain Mine Project Phase II Expansion Draft Environmental Impact Statement

PDFdeis

EIS Appendix D - Consultation Coordination and Public Involvement

PDFappendix

EIS Appendix L - Alternatives Considered and Dismissed

PDFenvironmental-impact-statement-appendix

Castle Mountain Venture SPCC Plan Addendum February 2021

PDFspcc-plan

Castle Mountain Venture Ivanpah Water and Power Line Plan of Development

PDFplan-of-development

CDFW Comments on Castle Mountain Mine Phase II Expansion DEIR

PDFcomment

EIS Appendix F - List of Preparers

PDFother

2024-2025 Federal Mining Claim Maintenance Fee Payments - Castle Mountain Venture

PDFcontract-document

EIS Appendix E - Applicant Committed Environmental Protection Measures

PDFappendix

_CMM Public Review Draft EIR_April 2026_V2_DEIR Appendices_re-OCR

PDF

NAHC Comment on Castle Mountain Mine Phase II Expansion Project

PDFcomment

Castle Mountain Mine Plan of Operation & Reclamation Plan Amendment 2022

PDFmine-plan-amendment

Castle Mountain Mine Project Phase II Expansion Draft Environmental Impact Report

PDFenvironmental-impact-report

CDFW Comments on Castle Mountain Mine Phase II Expansion NOP

PDFcomment-letter

Appendix K POD_EQX-CMM_POD_App A_Figures 2025

PDFspecifications

Appendix J MPO_App D - Figures 1-3ah: San Bernardino Meridian Pit and Facility Boundaries

PDFother

EIS Appendix C - Referenced Figures

PDFother

Appendix J MPO_App B - Figures 1-2h Support Facilities Map

PDFspecifications

Castle Mountain Mine 69 kV Power Transmission Line Environmental Assessment (1990)

PDFenvironmental-assessment

Castle Mountain Mine Emergency Response Plan 2024

PDFemergency-response-plan

Castle Mountain Mine Geochemical Characterization Report 2024

PDFreport

Castle Mountain Mine Phase II Expansion Project Notice of Completion

PDFnotice-of-completion

EIS Appendix G - Permits and Approvals for Phase II Expansion Project

PDFother

Castle Mountain Geotechnical Feasibility Report April 2020

PDFgeotechnical-report

Appendix F Proposed Water Line Preliminary Engineered Drawings

PDFspecifications

MRAA-2022-00002 Castle Mountain Mine Phase II Expansion NOP CEQA

PDFpresolicitation

CMM Spill Prevention & Response Plan v2.1

PDFsop

Castle Mountain Mine Phase II Expansion Project NOA/NOI

PDFspecial-notice

Updated Water Supply Assessment for Castle Mountain Mine Project

PDFwater-supply-assessment

EIS Appendix I Visual Simulations

PDFappendix

Castle Mountain Mine Phase II Expansion Project Summary Form

PDFenvironmental-summary

CEQA Initial Study for Castle Mountain Mine Power Line Project Amendment

PDFceqa-initial-study

Revised Groundwater Monitoring Plan for Castle Mountain Mine 2024

PDFmonitoring-plan

Castle Mountain Mine Road Use and Maintenance Plan November 2023

PDFroad-use-and-maintenance-plan

Castle Mountain Venture Waste Rock Management Plan 2024

PDFwaste-rock-management-plan

Castle Mountain Mine Interim Management Plan Aug 2024

PDFinterim-management-plan

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Bernardino County
Contacts4 people available
OfficeN/A
Organization / Agency
California → San Bernardino County
Office AddressN/A
Contacts
Jessica CleavengerSenior Environmental Planner
Aren HallPermitting Manager

Interested Companies (1)

Show more

Full Description

Show more
The proposed Project involves the second major expansion of Castle Mountain Mine (CMM), including installation of an underground waterline and overhead powerline within existing rights-of-way (ROWs) to support the expanded operations. CMM is an existing open-pit gold mine and heap-leach operation located on a combination of private land, owned by Castle Mountain Venture (CMV; Project Applicant), and public land, administered by the U.S. Bureau of Land Management (BLM) Needles Field Office (NFO) in California and regulated in coordination with the County of San Bernardino (County). The proposed Project would extend the mine life by approximately 30 years, with 20 years of mining and ore processing followed by 10 years of reclamation and closure activities. The proposed Project would increase the annual mining rate from 22 million tons to 80 million tons. The increased production rate would require up to 2,250 acre-feet per year of groundwater and up to 25 megawatts (MW) of electrical power. To meet these demands, the Project Applicant proposes to construct a 31.5-mile underground water pipeline and a 16.5-mile overhead electrical transmission line. The proposed utilities would be constructed within existing ROWs and would traverse public land managed by the BLM NFO in California and the BLM Las Vegas Field Office (LVFO) in Nevada. The proposed Project would disturb a total of approximately 3,288 acres, including 1,474 acres of existing disturbance from previously approved development, 1,434 acres of proposed disturbance for the mine expansion, and 380 acres of disturbance associated with the proposed underground water pipeline and 16.5-mile-long, 69-kilovolt (kV) overhead powerline ROWs. The CMM Access Road was approved under the mine’s original BLM Plan of Operations (CACA031137) in 1990, as documented in the Record of Decision for the Castle Mountain Mine Project Environmental Impact Statement (EIS No. 890053; State Clearinghouse No. 88062708) (1990 Plan) (BLM?1990a). When the California Desert Protection Act of 1994 established the Mojave National Preserve, approximately 1,000 feet of the mine’s approved access road alignment and proposed utility corridor were included within the Mojave National Preserve boundary. CMV has proposed an alternative alignment that avoids the Mojave National Preserve but would disturb approximately five acres of BLM-managed land. The proposed Project includes: • Construction and operation of a 31.5-mile underground water pipeline within a proposed BLM ROW. • Construction and operation of a 16.5-mile-long, 69-kV overhead powerline within a proposed BLM ROW. • Increasing the total land disturbance by an additional 1,814 acres. • Increasing mining by an additional 296 million tons. • Increasing overburden stockpiling by an additional 196 million tons. • Increasing crushing rate from six million to 19 million tons per year. • Increasing the maximum rate of mining by an additional 62 million tons per year. • Increasing groundwater use from 625 to 2,250 acre-feet per year, an additional 1,625 acre-feet per year. • Expanding and deepening open pits to greater than 400 feet below the water table. • Providing up to 500 temporary and 400 permanent jobs. • Creating an open pit lake that would remain a permanent land feature. • Extending the mine life to 2060.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
DEP-BWR-NOI-FY27-M36 Grant ANNOUNCEMENT ONLY
Solicitation # BD-27-1045-BWR00-BWR01-133675
The Massachusetts Department of Environmental Protection (MassDEP) is soliciting interest from Public Water Supplies and municipalities with Water Management Act (WMA) permits or registrations to receive a free American Water Works Association (AWWA) M36 water audit. The program is designed to help entities identify water loss objectives, particularly those failing to meet the Unaccounted-for Water (UAW) performance standard of 10 percent or less. Depending on previous audit history and data validity scores, eligible participants can receive either a Top-Down Audit or a Bottom-up Component Analysis. MassDEP will hire a private consulting firm through a separate public procurement process to conduct these audits. Selection is based on criteria including high UAW rates, WMA allocation status, recent improvement efforts, and permit status, with priority given to WMA permit holders and projects benefiting disadvantaged communities. Participation is limited to entities in compliance with the MBTA Communities Act Law. Selected applicants must provide a written commitment to have detailed system information for 2025 or 2026 available by January 15, 2027, and submit that data by February 2, 2027. Additionally, participants must commit significant personnel time as an in-kind match and be prepared to enter into a contract within 15 to 30 days of the grant award. Responses to this Request for Interest are due by October 21, 2026.
BWR00 - Bureau of Water Resources

POSTED

about 11 hours ago

DEADLINE

in 30 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS