Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Castle Rock State Park Saratoga Gap Trail Project (Notification of Lake or Streambed Alteration, No. EPIMS-SCR-57250-R3)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife issued Notification No. EPIMS-SCR-57250-R3 for the Castle Rock State Park Saratoga Gap Trail Project, authorizing regulated streambed alterations under Section 1602 of the Fish and Game Code. The project involves the demolition and replacement of two existing bridge structures—South and North—over unnamed tributaries of the San Lorenzo River in Santa Cruz County. Both structures will be removed and reconstructed in their original locations to eliminate hydraulic constriction and restore natural creek banks. Following removal, the adjacent top-of-bank areas will be regraded to eliminate unnatural slopes, and a 16 by 20 foot excavated area upstream of the South Bridge will be created to reduce erosion risk and prevent future bank failure. Natural fiber netting and locally sourced plant cuttings will be used to install brush boxes at the toe of slopes on the opposite bank to stabilize erosion-prone areas. The project qualifies for categorical exemptions under California Code of Regulations Title 14 Sections 15302 and 15304, confirming it involves minimal environmental impact through replacement of existing infrastructure and minor vegetation alterations. The work is being carried out by the California Department of Parks and Recreation, with regulatory oversight from the Department of Fish and Wildlife, and no formal procurement process, contract value, or FAR clauses apply, as this is an environmental compliance notification rather than a competitive acquisition. All activities are confined to the specified coordinates in Santa Cruz County, with submission and coordination handled through designated agency contacts at both CDFW and CalParks.

General Info

California replaces two bridges in Santa Cruz County to restore streams, stabilize banks, and minimize environmental impact.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

EPIMS-SCR-57250-R3 Notice of Exemption for Castle Rock State Park Saratoga Gap Trail Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A
Contacts
Alexis HarrisonEnvironmental Scientist
Teri CrawfordDistrict Environmental Coordinator

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-SCR-57250-R3, pursuant to Section 1602 of the Fish and Game Code to the California Department of Recreation, as represented by Michael Towne. Bridge Replacement 1/South Bridge: The Project is limited to the demolition and removal of the existing southern bridge structure and installation of the new bridge structure in the same location. The previous bridge structure constrained the creek at the crossing and created an unnatural bank slope. Following the removal of the old bridge structures, the top of bank of the creek and adjacent areas will be regraded to restore the area to a more natural bank slope. Additionally, a small area (16 by 20 foot) adjacent to but outside the top of bank is proposed to be excavated at a sharp bend of the creek upstream of the bridge to limit erosion and prevent future bank failure. Brush boxes are proposed to be installed at the toe of slope for the opposite bank to stabilize the bank edge where erosion is occurring due to the sharp angle of the creek in this location. The brush boxes will consist of natural fiber netting and cuttings from locally sourced plant species. Bridge Replacement 2/North Bridge: The Project is limited to the demolition and removal of the existing northern bridge structure and installation of the new bridge structure in the same location. The previous bridge structure constrained the creek at the crossing and created an unnatural bank slope. Following the removal of the old bridge structures, the top of bank of the creek and adjacent areas will be regraded to restore the area to a more natural bank slope.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to remove per- and polyfluoroalkyl substances from surface water. The scope requires integrated engineering solutions to meet evolving regulatory standards for drinking water safety, with specialized focus on advanced filtration and extraction technologies tailored to the existing infrastructure at both sites. Work will include site-specific modifications to ensure seamless operational integration while maintaining continuous water service during implementation. This solicitation, issued by Pyramid Building & Engineering, Inc., is designated for Disadvantaged Business Enterprises under the Department of Transportation set-aside program and falls under NAICS code 237310 for Water and Wastewater Pipeline and Related Structures Construction. Proposals must be submitted by September 3, 2026, with primary point of contact John Garrison available for inquiries via phone or email. The project is located entirely within California, with no specified city or zip details provided in the public record, and all contractual obligations are tied to performance at the two designated treatment plants. Participation is open to qualified firms seeking to support critical public health infrastructure improvements in compliance with state and federal water quality mandates.
Pyramid Building & Engineering, Inc.

POSTED

about 6 hours ago

DEADLINE

in 26 days
View Details